Glasgow Report W. H. Bell, A. Cheplakov, F. Doherty, M. Horn, J. Melone, V. O’Shea UK-V Meeting 03/03/04 -Glasgow
2
Glasgow Status Have 5 bonded production modules. 54 – Failed mechanically at Manchester 81 – Passes all tests after chip tuning 82 – Initially failed due to bonding damage Chip has been replaced. Will rebond and complete tests asap. 83 – Has detector charge problems and one chip with a dead front end. Suspect ESD but no visual confirmation. (Also had bonding trouble with this module.) Chip will be changed. 85 – Has bad IV. Suspect scratch.
3
Module 85 – IV
4
Slow Down Bonding problems Chips at different heights wrt hybrid. Causing differences in bond strength and reworks. Understand how to solve these problems Single Aero Can’t train or test other DAQ components Debugging single module – bottle neck
5
Other Activities Expansion of testing equipment 1, 4, and 6 box testing capacity Correction of Jig and duplication New jig for H&K 710
6
Getting Up to Speed Working with Liverpool Bonded module 85 Pre-acceptance tests at Paderborn Tested out a range of settings and all parts of the module. Assisting Liverpool
7
Outlook With varying chip heights and other bonder instabilities: no confidence in K&S. Help with bonding at Liverpool New bonder Arrival 08/03/04 Installation and training complete 12/03/04