Download presentation
Presentation is loading. Please wait.
Published byFrancis Harrison Modified over 8 years ago
1
24 October 2006 Industry Dialogue on xoserve services – Work Plan
2
Objectives To enable all parties to participate and contribute to the deliverables outlined by Ofgem. Agree a realistic work plan structure leading up to the initial presentation on 5 December 2006. Maximise wider industry participation Ideally, gain agreement from all parties, and ultimately generate reflective outcomes.
3
Benefits and Issues Benefits Managable workloads Structured plan ensures all issues are covered Flexibility around plan Allows the industry to air individual views on future arrangements Risks Time Element – Lack of sufficient time to deliver / discuss all deliverables in high levels of detail Attendance – Need to ensure / encourage consistent industry participation to maximise viewpoints and help deliver effective conclusions
4
Work Plan Intention to conduct three ‘work group meetings’ between now and 5 December 2006 Option of additional fourth meeting late November. Fortnightly meetings enable development work to be done between meetings. Joint Office to facilitate and overlook the process based on the work plan
5
Work Plan Timeline October / November WGM A WGM B WGM C Initial Presentation Deliverables Timeframe Development Initial Report Final Report December / January WGM tbc
6
Development Phase - Work Group Meeting A October 24, 2006 Service Lines – The scope of the services currently provided, discussion surrounding existing output, potential new output, expectations and feasibility. Standards of Service – The current standards of service for xoserve systems.
7
Work Group Meeting B November 8, 2006 To build on developments of first work group and development phase Development of Service Lines – In terms of costs, efficiencies, potential gains and standards. Principles of User Pays –Discussion regarding potential frameworks, Objectives, Models Governance and Transparency of User Pays – Governance arrangements for user pays services and transparency of those services.
8
Work Group Meeting C November 22, 2006 Summary of previous meetings. Application of User Pays principles to service lines. Operating Efficiences need to be considered and discussed with a view to developing a potential framework Need to ensure that all deliverables are met and have been considered as far as reasonably possible. Need for additional meeting prior to presentations.
9
Outcomes Moving forwards, details of additional meetings will be developed once the Initial Presentation phase has been completed to reflect developments. Initial Presentation to be presented at Ofgem to reflect industry views – given by industry. Initial and Final Report to be developed by the Joint Office to reflect all views aired throughout the dialogue phase.
10
Summary The Work Plan enables all parties to effectively express their opinion surrounding the outlined deliverables, in an open discussion format. The structure enables best use of the limited time available to deliver to the requested deadlines. Relies on all parties to prepare and understand material prior to attending meetings to ensure a valued output. Joint Office chair ensures all views expressed are taken into consideration as part of the whole process.
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.