Download presentation
Presentation is loading. Please wait.
Published byHenry Bates Modified over 8 years ago
1
Nick Small, Shawn Boughey, Karolina Latkoska Project Briefing 1
2
Nick Small, Shawn Boughey, Karolina Latkoska 1.Background 2.Scope 3.Deliverables 4.Schedule 5.Risks and Issues 6.Controls – change, quality, risks 7.Next steps 2
3
Nick Small, Shawn Boughey, Karolina Latkoska 1. Background Existing database unreliable Projected business expansion Desire for increased functionality 3
4
Nick Small, Shawn Boughey, Karolina Latkoska 2. Scope IN SCOPE Database design Decision support system OUT OF SCOPE Online booking system 4
5
Nick Small, Shawn Boughey, Karolina Latkoska 3. Deliverables IN SCOPE Project planning documentation Requirements analysis documentation Design documentation OUT OF SCOPE Working prototype 5
6
Nick Small, Shawn Boughey, Karolina Latkoska 4. Schedule (link)(link) 6
7
Nick Small, Shawn Boughey, Karolina Latkoska 5. Status Project Planning Project Charter Project Management Plan Risk Mgt Plan Change Mgt Plan Project Quality Plan Communication Plan Configuration Plan Project Closure Document Requirements Analysis Use Case Diagram Use Case Narratives Sequence Diagrams Data Flow Diagrams Domain Diagram Design Functional Specifications System Architecture Database Design Specification Data Migration Strategy GUI Specification 7 Complete In Progress Overdue
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.