Download presentation
Presentation is loading. Please wait.
Published byGwen Hall Modified over 9 years ago
1
TEPPC Review Task Force January 11, 2016
2
Purpose Advise and make recommendations on Future potential future generation and load balance Adequacy of the bulk electric system Accomplish through Establishing processes, criteria and guidelines Accumulating planning data for modeling Perform studies to assess reliability Evaluate proposed additions or alterations
3
Membership WECC member representatives from the five WECC classes
4
Subcommittees Technical Studies Modeling, proposed addition evaluation, and reliability evaluation Reliability Criteria, load and resource, and adequacy assessment Joint Synchronized Information (with OC) Wide-area synchronized measurement systems, standards, and applications Oscillation Analysis
5
Processes and Plans Data Preparation Manual Dynamic Modeling Procedure Generator Testing LAR Methods and Assumptions Off-Nominal Frequency Load Shedding Plan Power System Stabilizer Tuning Project Coordination, Path Rating, and Progress Report Processes Ensure that process is followed (review evaluates)
6
Modeling Power Flow and Dynamic Generator Geomagnetic High Voltage Direct Current Load Renewable Energy Solar Plant Wind Plant Dynamic Modeling Relay and Special Protection Systems Static VAr System
7
Assessments Power Supply System power flow model error detection and correction tracking Under Frequency Load Shedding plan and events
8
PCC & TEPCC Opportunities Modeling consistency Modeling assumptions Coordination of any interconnection assessments
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.