Isabella Pagano PLATO TOUs PM Padova, 1 Feb 20101System &TOUs Team Meeting Organization of the TOU team PLATO System & TOUs.

Similar presentations


Presentation on theme: "Isabella Pagano PLATO TOUs PM Padova, 1 Feb 20101System &TOUs Team Meeting Organization of the TOU team PLATO System & TOUs."— Presentation transcript:

1 Isabella Pagano PLATO TOUs PM isabella.pagano@oact.inaf.it Padova, 1 Feb 20101System &TOUs Team Meeting Organization of the TOU team PLATO System & TOUs Teams meeting Padova, 01 Feb 2001

2 PLATO Activities in Italy Padova, 1 Feb 2010System &TOUs Team Meeting2 PLATO-ITManagementScienceTOUsICU

3 Proposed TOUs WBS Padova, 1 Feb 2010System &TOUs Team Meeting3 Telescope Optical Units R. Ragazzoni INAF Padova Subsystem Management I. Pagano INAF Catania Subsystem Engineering R. Ragazzoni INAF Padova Optical Design D. Magrin INAF Padova Mechanical Design D. Piazza Univ. Berne AIV J. Farinato INAF Padova TMA S. Basso INAF OA Brera GSE E. Pace Univ. Firenze OMT M. Ghigo INAF OA Brera Stray.t An. & Baffling S. Scuderi INAF Catania INAF (Oss. Astr. Padova, Catania and Milano) Berne Univ. Firenze Univ.

4 Planned TOU activities Padova, 1 Feb 2010System &TOUs Team Meeting4 Consolidation of mechanical design Consolidation of optical design Verification lenses manufacturability Production of mechanical structure (Al) Production of lenses Thermo mechanical analysis

5 TOU Straylight & Baffling Padova, 1 Feb 2010System &TOUs Team Meeting5 Consolidation of optical design Straylight analysis Sun shield Consolidation TOU baffle design Production of TOU baffle prototype

6 TOU Prototype Padova, 1 Feb 2010System &TOUs Team Meeting6 Mechanical Structure Integration Verification Tests Lenses TOU Prototype System Team TOU baffle

7 Other TOU activities Study of GSE for the Implementation Phases Definition of costs Definition of developing plans Padova, 1 Feb 2010System &TOUs Team Meeting7

8 What we need We need to know about the SPC decision; In case timelines for DP are dramatically changed (e.g., selection at the end 2010), the PPLC has to re- define activities (prototype not feasible); In case the selection is in the summer 2011: What is the agreement between ESA and national agencies (NAs)?? It seems that the shortening of the DP comes from the NAs request to avoid waste of money on projects that will not continue. Is there any agreement among NAs to not fund hardware?? Padova, 1 Feb 2System &TOUs Team Meeting8

9 What we need In case ASI will fund the prototype activities: Is 1.5 yr from now enough? To deliver a telescope demonstrator in Jun 2011, we need to deliver a TOU demonstrator not later than March 2011 (?). I.e. lenses and mechanical structure need to be ready for Dec 2010. Assuming ordinary times for an industrial contract, we cannot have lenses for Dec 2010. Can the PPLC rise ESA funds for this? (assuming this is faster with industries) Remind that this situation occurs because the shrinking of the DP. Padova, 1 Feb 2System &TOUs Team Meeting9

10 Padova, 1 Feb 201010System &TOUs Team Meeting