Download presentation
Presentation is loading. Please wait.
Published byNicholas Perkins Modified over 8 years ago
1
The school building We have been raising school funds for the new building through things like the 100 club and the Jewellery Party.
2
An Introduction The school building started in about February 2012 and is hoping to finish in May 2012. This is a Diagram of what the school building Should look like when it is finished.
3
Exciting Things! Some of the most exciting things that the students saw about the building project were the crane, the cement mixer, metal girders, lorries lots of stuff!
4
These are some of the pictures of the school building!
5
What has happened so far? The building is nearly finished - they have fitted in the windows the roof and the door starting the path up to the building and the steps. They can’t finish because the render will get wet if they put it up during the bad weather.
6
What we are hoping for All of the building work is for an new infant classroom suitable for someone with a disability, infant toilets, a hygiene room, a new office for Mr. Stockdale and when the building and toilets are made, we will have more storage space.
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.