Presentation is loading. Please wait.

Presentation is loading. Please wait.

2015 Eastern Oregon Region AWWA/PNCWA Operator’s Conference Water Project of the Year City of Stanfield’s Water System Improvements.

Similar presentations


Presentation on theme: "2015 Eastern Oregon Region AWWA/PNCWA Operator’s Conference Water Project of the Year City of Stanfield’s Water System Improvements."— Presentation transcript:

1 2015 Eastern Oregon Region AWWA/PNCWA Operator’s Conference Water Project of the Year City of Stanfield’s Water System Improvements

2 Project Summary $4 million water system upgrade New 1 million gallon water storage reservoir New basalt well (1,200 gallons per minute) New booster pump station and transmission lines Recoating of the existing North Stanfield Reservoir

3 Water line construction

4 Reservoir Construction

5

6

7 Pipeline Installation

8 New Reservoir

9 Pump Station Piping

10 New Reservoir and Pump House


Download ppt "2015 Eastern Oregon Region AWWA/PNCWA Operator’s Conference Water Project of the Year City of Stanfield’s Water System Improvements."

Similar presentations


Ads by Google