1
MIRI day 3 june 2010 Biography of JWST MIRI SMO FM MIRI day 1
2
3 june 2010 Design evolution 2
3
MIRI day 3 june 2010 3
4
MIRI day 3 june 2010 MIRI development 4
5
MIRI day 3 june 2010 EQMm and EQMg 5
6
MIRI day 3 june 2010 STM 6
7
MIRI day 3 june 2010 QM 7
8
MIRI day 3 june 2010 VM 8
9
MIRI day 3 june 2010 MIRI VM tests 9
10
MIRI day 3 june 2010 Improvements l Response folding flat l Response M1-1 l Integrate mounting points in structure l Peripheral mounting -No bolt heads in optics box l Additional baffles l Closed covers 10
11
MIRI day 3 june 2010 Response folding flat 11
12
MIRI day 3 june 2010 Response structure 12 3*σ rms [ N/mm 2 ] 3*σ rms [N/mm 2 ] SimplifiedReinforce d factor Full Recalculat ed Stress in Mirror 606241.52.5418167
13
MIRI day 3 june 2010 Integrate mounting points in structure 13
14
MIRI day 3 june 2010 No bolt heads in optics box 14
15
MIRI day 3 june 2010 SMO FM integration 15
16
MIRI day 3 june 2010 SMO FM 16
17
MIRI day 3 june 2010 SMO FM results: Focus 17 Series worst channel offset [mm] focal pos. errors [mm] worst focus offset [mm] error budget [mm] pass or fail? SW#10.023±0.028±0.051±0.095pass SW#20.023±0.028±0.051±0.095pass LW#10.042±0.028±0.070±0.095pass LW#20.028±0.028±0.056±0.095pass
18
MIRI day 3 june 2010 SMO FM results: Image Quality 18
19
MIRI day 3 june 2010 FM SMO results: Bore Sight 19 SMO status channel worst deviation X [pixels] worst deviation Y [pixels] after integration 1 73 after vibration73 after TVC73 after integration 2 54 after vibration73 after TVC72 after integration 3 105 after vibration96 after TVC107 after integration 4 73 after vibration73 after TVC73
20
MIRI day 3 june 2010 FM “challenges” 20
21
MIRI day 3 june 2010 GWA FM 21
22
MIRI day 3 june 2010 MIRI FM 22