- 1 - MSFC / ESA TIM #3 – J.D. Schiemann / P. Boisvert; 17 August 2004ESA OPERATIONS CHANGE PROCESS J.D. Schiemann / P. Boisvert ESA/ESTEC MSM-EPO MSFC / ESA TIM#3 Huntsville ; 17-19 August 2004
2
- 2 - MSFC / ESA TIM #3 – J.D. Schiemann / P. Boisvert; 17 August 2004ESA OPERATIONS CHANGE PROCESS BACKGROUND The ESA Operations Change process was presented at TIM # 2 An end-to-end flow was presented to capture the main elements Focusing on payload operations At TIM#2, the further Work was identified as The identification and initiation of development of ESA/POIC OIPs regarding Payload Operations Changes Columbus System changes (similar process as for Payloads, ESC=>USOC equivalent) Process for CRFs with “Special Processing Requirements” ISS level changes originating from Columbus Identification of Change process for ESA Payloads in US-LAB US-Segment changes affecting the ESA P/L Ops Coordination and interaction for POIC - initiated (and TSC ?) changes for US P/Ls in Columbus
3
- 3 - MSFC / ESA TIM #3 – J.D. Schiemann / P. Boisvert; 17 August 2004ESA OPERATIONS CHANGE PROCESS OPERATIONS INTERFACE PROCEDURES (OIPs) A bilateral OIP is outlined herein as draft It addresses the Operations Change Request process for Payloads in ESA racks located in Columbus ESA payloads in US Lab Payloads in NASA racks located in Columbus ESA internal processes are also presented for information CRF process – USOC level Addressing the management of payload operations change requests at USOC level Inputs for the ESA “MSM GS JOIP” document CRF process - Col-CC level Describing the change request process at COL-CC for any flight operations product The bilateral OIP would possibly be integrated into an overall multilateral OIP based on this CR process currently under review
4
- 4 - MSFC / ESA TIM #3 – J.D. Schiemann / P. Boisvert; 17 August 2004ESA OPERATIONS CHANGE PROCESS OPERATIONS CHANGE PROCESS MAIN STEPS For ESA Racks in Columbus or ESA payloads in US Lab: Initiation of a change request (USOC or Col-CC) CRF internal submittal ; review at FRC level (if applicable) For ESA P/L in US Rack: pre-coordination with respective TSC CRF submittal at COL-CC level ESA-level review ; Disposition by ESA-FD If CRF approved by ESA-FD: Transfer of pre-coordinated CRF to POIC OCR (for ESA P/Ls in US Lab) Via FD (delegated to PAC ; TBC) POIC review of ESA initiated OCR Disposition of the OCR Implementation actions for approved change request (CRF or OCR) Appeal process (off-line) OCR appeal process existing ?
5
- 5 - MSFC / ESA TIM #3 – J.D. Schiemann / P. Boisvert; 17 August 2004ESA OPERATIONS CHANGE PROCESS OPERATIONS CHANGE PROCESS MAIN STEPS (cont’d) For NASA Racks in Columbus: Initiation of a change request (OCR) POIC review Transfer of OCR to COL-CC CRF, into ESA CR System by POIC Cadre position TBD Rationale: Col resources are affected Col complement is affected COL-CC review Disposition of the CRF Implementation actions for approved change request Appeal process (off-line)
6
- 6 - MSFC / ESA TIM #3 – J.D. Schiemann / P. Boisvert; 17 August 2004ESA OPERATIONS CHANGE PROCESS Main Issues Inclusion of POIC in CRF review cycle A CRF on ESA P/L in Col that affects the NASA ops baseline, e.g. change on EPM POIC needs to be included in the review Change Tool (OCMS) allows POIC inclusion as mandatory evaluator, or selective evaluator POIC OCR initiation cycle Required Pre-coordination via TSC, versus pre-coordination / pre-approval on ESA- level Submission by ESA USOC via TSC vs. submission from ESA Col-CC for all ESA changes Initiation of Columbus Changes into ESA system by POIC NASA / POIC submit changes to the ESA CR system for changes to rack ops located inside Columbus Rationale: ESA's element responsibility requires integrated assessment Changes of NASA racks inside Col affect Col-resources and/or Col-p/l complement reviewed by all participants in Col Ops on ESA side, e.g. including Eng. support NASA Users of ESA racks required to use ESA CR system Later ; no such users identified, yet
7
- 7 - MSFC / ESA TIM #3 – J.D. Schiemann / P. Boisvert; 17 August 2004ESA OPERATIONS CHANGE PROCESS BACKUP CHARTS
8
- 8 - MSFC / ESA TIM #3 – J.D. Schiemann / P. Boisvert; 17 August 2004ESA OPERATIONS CHANGE PROCESS OPERATIONS CHANGE PROCESS OUTLINE – FRC LEVEL
9
- 9 - MSFC / ESA TIM #3 – J.D. Schiemann / P. Boisvert; 17 August 2004ESA OPERATIONS CHANGE PROCESS OPERATIONS CHANGE PROCESS OUTLINE – FRC LEVEL (cont’d)
10
- 10 - MSFC / ESA TIM #3 – J.D. Schiemann / P. Boisvert; 17 August 2004ESA OPERATIONS CHANGE PROCESS OPERATIONS CHANGE PROCESS OUTLINE – FRC LEVEL (cont’d)
11
- 11 - MSFC / ESA TIM #3 – J.D. Schiemann / P. Boisvert; 17 August 2004ESA OPERATIONS CHANGE PROCESS OPERATIONS CHANGE PROCESS OUTLINE – COL-CC LEVEL
12
- 12 - MSFC / ESA TIM #3 – J.D. Schiemann / P. Boisvert; 17 August 2004ESA OPERATIONS CHANGE PROCESS OPERATIONS CHANGE PROCESS OUTLINE – COL-CC LEVEL (cont’d)
13
- 13 - MSFC / ESA TIM #3 – J.D. Schiemann / P. Boisvert; 17 August 2004ESA OPERATIONS CHANGE PROCESS OPERATIONS CHANGE PROCESS OUTLINE – COL-CC LEVEL (cont’d)
14
- 14 - MSFC / ESA TIM #3 – J.D. Schiemann / P. Boisvert; 17 August 2004ESA OPERATIONS CHANGE PROCESS OPERATIONS CHANGE PROCESS OUTLINE – COL-CC LEVEL (cont’d)