Download presentation
Presentation is loading. Please wait.
Published byEarl Neal Modified over 9 years ago
1
P25 Update Paul A. Wardner KAØNDS Business Development Manager Public Safety
2
P25 Update TIA-102 (P25) is 26 years into the program Group made up of manufacturers and agencies Interop and Open standard Prime motivator Dominant digital system for Public Safety Technology improvements (IMBE → AMBE+2) Feature enhancements / rollout continuously Enhanced infrastructure interoperability
3
P25 – Phase 1 systems Total VHFTotal UHF (high and low)Total 700/800Total 900 551942644
4
P25 – Phase 1 systems 900MHz systems is lowest number of systems VHF is 2 nd smallest number of installed systems UHF is 2 nd largest number of installed systems –Federal market represents the majority of UHF systems which also are mostly closed to vendors other than the system vendor installed. 700/800 is largest number of installed systems –Some VHF systems also have 700/800 sites
5
P25 – Phase 2 systems Total VHFTotal UHF (high and low)Total 700/800Total 900 15972
6
P25 – Phase 2 systems Phase 2 offers increased channel capacity
7
P25 Phase 2 Myths Addressed Misconceptions and common myths regarding APCO Phase 2 P26 and P27 are the next digital standards FalseNever mentioned or discussed Phase 2 is required for FCC Narrow banding False 700MHz band PS, January 1, 2017 requirement eliminated FCC 14-172 Phase 2 brings added features to P25 False Not the intention, increased system capacity Phase 1 is obsolete and replaced by Phase 2 FalsePhase 2 augments Phase 1 Everyone should upgrade to Phase 2 FalseNot required Phase 2 has to use 700/800MHz spectrum FalseVHF, UHF, 900MHz
8
Thank you !
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.