Presentation is loading. Please wait.

Presentation is loading. Please wait.

L4: GP TOOLS / 1 Asian Productivity Organization, Tokyo Brainstorming Idea 1 Supporting Idea 1 Extension to Idea 1 Opposing Idea 1 Idea 2 Idea 3 based.

Similar presentations


Presentation on theme: "L4: GP TOOLS / 1 Asian Productivity Organization, Tokyo Brainstorming Idea 1 Supporting Idea 1 Extension to Idea 1 Opposing Idea 1 Idea 2 Idea 3 based."— Presentation transcript:

1 L4: GP TOOLS / 1 Asian Productivity Organization, Tokyo Brainstorming Idea 1 Supporting Idea 1 Extension to Idea 1 Opposing Idea 1 Idea 2 Idea 3 based on 1 and 2 Supporting Idea 3 Idea 4

2 L4: GP TOOLS / 2 Asian Productivity Organization, Tokyo Flow Charts

3 L4: GP TOOLS / 3 Asian Productivity Organization, Tokyo Process Flow Diagram (PFD)

4 L4: GP TOOLS / 4 Asian Productivity Organization, Tokyo N ETP Finished Product Storage Raw Material Storage Manufacturing Process Line Prod. Capacity 10,000 product items per day Administrative Block Quality Control and Final Packaging Proposed Production line of capacity 10,000 product items per day Utilities Laboratories Toilet Block 30m Stack for emissions Central Highway 05 Main Entrance 100m100.5m101m Municipal Water Supply EntryExit 05 metres Scale 101.5 m Plant Layout

5 L4: GP TOOLS / 5 Asian Productivity Organization, Tokyo Eco-maps

6 L4: GP TOOLS / 6 Asian Productivity Organization, Tokyo Eco-maps to identify problem areas

7 L4: GP TOOLS / 7 Asian Productivity Organization, Tokyo Concentration Diagrams Plating bath 1 Plating bath 2 Recovery tank Filter Work Jobs Cleaning area Location of spillage during each monitoring Problem Area


Download ppt "L4: GP TOOLS / 1 Asian Productivity Organization, Tokyo Brainstorming Idea 1 Supporting Idea 1 Extension to Idea 1 Opposing Idea 1 Idea 2 Idea 3 based."

Similar presentations


Ads by Google