Presentation is loading. Please wait.

Presentation is loading. Please wait.

Unit 2.b. Phases of a Hydrographic Survey Captain M K Barritt RN.

Similar presentations


Presentation on theme: "Unit 2.b. Phases of a Hydrographic Survey Captain M K Barritt RN."— Presentation transcript:

1 Unit 2.b. Phases of a Hydrographic Survey Captain M K Barritt RN

2 Phases of a Hydrographic Survey Preliminary Liaison Establishment of control and calibration of equipment Area search Investigations Ancillary observations

3 Preliminary Liaison Before a survey commences, liaison with other authorities is essential. Fishery Liaison Officers for de- confliction. Port Control Offices. Coast Guard for Navigational Warnings.

4 Preliminary Liaison Before a survey commences, liaison with other authorities is essential. Fishery Liaison Officers for de-confliction. Port Control Offices. Coast Guard for Navigational Warnings.

5 Establishment of control Horizontal: How will I fix my position, and preferably with more precision than the subsequent chart user? Vertical: How can I make allowance for change of tidal height?

6 Calibration of equipment Performance of equipment must be validated before and during survey: Static and dynamic validation of navigational aids used for position-fixing. Target or patch tests of sonar devices. Constant monitoring of sound velocity. Sampling of seabed.

7 Error Budget - Example

8 Tidal Reduction

9 Comparison with previous work What did previous surveyors find, and have we relocated or disproved their findings?

10 Area Search What tool is best: MBES +/- DCSS, SBES +/- DCSS? What sort of traffic will navigate in this area? Who are the customers? What are the general depths? What sort of topography is expected? Are many wrecks and obstructions expected?

11 Magnetometer Sidescan Sonar Up to 1,200 metres 6½ Knots s.o.a. in direction of strongest tidal streams c.15 m

12 SONAR COVERAGE

13 Seabed depression identified by shadow preceding hard return Seabed elevation identified by shadow following hard return TIME First seabed return Sea surface return SEABED DEPRESSIONS & ELEVATIONS

14

15 HAND-COMPILED SEABED TEXTURE TRACING

16

17 Depth MULTI-BEAM ECHO SOUNDERS SWATH WIDTH Beam angle

18 Investigations

19 Survey line 2 Survey line 1

20 Ancillary Observations


Download ppt "Unit 2.b. Phases of a Hydrographic Survey Captain M K Barritt RN."

Similar presentations


Ads by Google