“The World Bank – Italian Trust Fund for Environmental Protection in CHina” Technical Meetings – Beijing – January 23-24, 2006 Climate Changes Related Project within the Sino-Italian Program for Environment Protection (SICP) Marco G. Cremonini
2
Italian Project Goal n Italy needs a large reduction in the CO 2 emissions n Severe commitment between 2008- 2012 (about 40x10 6 tons CO 2 /year) n Italy is planning to buy credits on the market, possibly through CDM project implementation
3
Climate Change Related Projects The action of the Italian Ministry of Environment is focusing on the following sectors: n Energy Efficiency n Energy Production from Renewable Energy n GHG Monitoring and Inventory within the Clean Development Mechanism framework
4
Municipal Energy Planning Suzhou, Taiyuan e Jinan n Scope of the work: –Energy investigation and analysis in the three municipality of Jinan, Taiyuan and Suzhou –Identification of energy saving opportunities in 9 industrial sites n Implementation period: –June 2002 – May 2004
5
Energy Efficiency Taiyuan n Scope of the work: –Energy Auditing –Capacity Building and –Investment/Development Guideline –Industry Energy Efficiency Projects –Municipality of Taiyuan n Implementation period: –May 2005 – November 2006
6
Energy Efficiency Sino-Italian Web Portal n Scope of the work: –development of a Sino- Italian web portal on energy efficiency in China n Implementation period: –January 2005 – June 2006
7
Energy Efficiency in Shanghai Municipality n Scope of the work: –Energy investigation of the main energy users in the Municipality –Identification of feasible interventions to optimize energy use n Period of implementation: –September 2004 – March 2005 (assessment) –February 2006 – December 2006 (Double Coin Plant)
8
Energy Efficiency TEDA n Scope of the work: –Energy investigation of the CDM opportunities in the Tianjin Economic Development Area n Period of implementation: –January 2006 – September 2006
9
Energy Efficiency NDRC n Scope of the work: –Action for Energy Efficiency Improvement in the Steel Sector –Action for Energy Efficiency Improvement in the Building Sector n Period of implementation: –December 2005 – December 2006
10
Landfill Gas Recovery - China n Scope of the work: –Technical and economical feasibility study for the landfill biogas recovery and utilization to generate electricity –Pilot plants installation and operation (CDM CERs) n Period of Implementation: –Phase 1: January 2004 – June 2005 –Phase 2: June 2005 - ongoing
11
Yinchuan LFG Plant - Ningxia Total Landfill Volume = 6,750,000 m 3 Waste load rate = 500 tons/day (to become 1,000 tons/day) Power Installed = up to 6 MW Electric Power generation = about 600 GWh/year in 20 years GHG Reduction = 3.2x10 6 tons CO 2eq Investment = 8 Mln Euro Period of Implementation: December 2004 – ongoing (construction early 2007)
12
Landfill Gas Recovery - Tianjin n Scope of the work: –Technical and economical feasibility study for the landfill biogas recovery and utilization to generate electricity –CDM framework n Period of implementation: –January 2006 – September 2006
13
Pingjipu Cattle Farm - Ningxia Total Livestock = 18,000 cows Waste load rate = 73,000 tons/year of solid manure Power Installed = 760 KW (1 st module) Electric Power generation = 9,800 MWh/year (1 st module) GHG Reduction = 28,000 tons CO 2eq / year Investment = 4 Mln Euro Period of Implementation: December 2004 – ongoing (construction early 2007)
14
Biogas Recovery – ShunYi District n Scope of the work: –Technical and economical feasibility study for the biogas recovery and utilization to generate electricity from pig manure n Period: –December 2005- December 2006 (design and CDM procedure)
15
Biogas Recovery – Lohoe (Henan) n Scope of the work: –Technical and economical feasibility study for the biogas recovery and utilization to generate electricity from pig manure –CDM credits generation n Period: –January 2004 – ongoing (construction starts in 2006)
16
Intelligent Transport System and Traffic Air Pollution in Beijing n Scope of the work: –Pilot Area of Beijing –Intelligent Transport Module –Air Quality Monitoring Module –Traffic Monitoring Module –Transport Planning Module n Period of implementation: –June 2003 – June 2004 (design and tender) –July 2004 – ongoing (implementation)
17
Sustainable Development (Energy and Mobility) – Chongming Island Scope of the work: n Chongming Island (in front of Shanghai) n In ccoperation with the Shanghai Municipality n Urban planning for a sustainable development (mobility) n Period: January 2005 - ongoing
18
GHGs Emission Inventory Lanzhou Municipality n Scope of the Work: –Definition of the Technical Specifications for the Emission Inventory –Elaboration of the Emission Inventory n Implementation Period: –October 2004 - July 2006