Presentation is loading. Please wait.

Presentation is loading. Please wait.

Light the future N L R National LambdaRail Update Joint Techs ‘05 Salt Lake City, Utah Steve Cotter February 13, 2005.

Similar presentations


Presentation on theme: "Light the future N L R National LambdaRail Update Joint Techs ‘05 Salt Lake City, Utah Steve Cotter February 13, 2005."— Presentation transcript:

1 light the future N L R National LambdaRail Update Joint Techs ‘05 Salt Lake City, Utah Steve Cotter scotter@internet2.edu February 13, 2005

2 All-Hands 1/11/052 National LambdaRail light the future N L R National LambdaRail Update Agenda Overall Network Design Phase II Tentative Schedule

3 All-Hands 1/11/053 National LambdaRail light the future N L R National LambdaRail Update Overall Network Design

4 All-Hands 1/11/054 National LambdaRail light the future N L R National LambdaRail Update Phase I Layer 1 Deployment – Completed Sept ‘04 WDC JAC Level3 fiber Other fiber STA CHI KAN PIT OGD BOI CLE ATL POR RAL DEN SVL SEA 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 4 4 LAX SAN 8 8 8 8 8 8 Cisco 15808 terminal Cisco 15808 OADM Cisco 15454 terminal Cisco 15454 OADM 8 4 4 8

5 All-Hands 1/11/055 National LambdaRail light the future N L R National LambdaRail Update Phase II Layer I Deployment DAL SYR TUL PEN ELP KAN PHO BAT ALB HOU WDC OGD CLE NYC SAA DEN 4 4 JAC 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 44 4 4 SLC 4 4 Level3 fiber WilTel fiber LAX 4 4 RAT 4 Cisco 15808 terminal Cisco 15808 OADM Cisco 15454 terminal Cisco 15454 OADM 8 4 4 8

6 All-Hands 1/11/056 National LambdaRail light the future N L R National LambdaRail Update Complete NLR Layer I Network DAL SYR TUL PEN ELP PHO BAT ALB HOU WDC OGD CLE NYC SAA 4 4 JAC 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 44 4 4 SLC 4 4 Level3 fiber WilTel fiber LAX 4 4 RAT 4 Cisco 15808 terminal Cisco 15808 OADM Cisco 15454 terminal Cisco 15454 OADM 8 4 4 8 STA CHI KAN PIT BOI CLE ATL POR RAL DEN SVL SEA 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 4 4 LAX SAN 8 8 8 8 8 8

7 All-Hands 1/11/057 National LambdaRail light the future N L R National LambdaRail Update Layer 2 Network Design HOU TUL ELP KAN PHO BAT LAX ALB PIT WDC CLE ATL RAL CHI NYC DEN SVL SEA JAC 10GE wave 10GE managed wave Cisco 6509 switch

8 All-Hands 1/11/058 National LambdaRail light the future N L R National LambdaRail Update Layer 3 Network Design ALB PHO BAT RAL JAC TUL PIT HOU LAX WDC ATL CHI NYC DEN SEA Cisco CRS-1 router 10GE wave 10GE managed wave

9 All-Hands 1/11/059 National LambdaRail light the future N L R CRS-1 6509 15808 15500 EastWest Metro and Regional Optical Networks NLR demarc DWDM 1GE 10GE or OC192 National LambdaRail Update Phase I PoP Layout

10 All-Hands 1/11/0510 National LambdaRail light the future N L R National LambdaRail Update Phase II PoP Layout CRS-1 6509 15454 15500 EastWest Metro and Regional Optical Networks NLR demarc DWDM 1GE 10GE or OC192

11 All-Hands 1/11/0511 National LambdaRail light the future N L R National LambdaRail Update Phase I & II Junction PoP Layout DWDM 1GE 10GE or OC192 CRS-1 6509 15808 15500 EastWest NLR demarc 15454 NLR demarc

12 All-Hands 1/11/0512 National LambdaRail light the future N L R National LambdaRail Update Phase II Hut Layout DWDM 1GE 10GE or OC192 15454 EastWest

13 All-Hands 1/11/0513 National LambdaRail light the future N L R National LambdaRail Update Phase II Tentative Schedule

14 All-Hands 1/11/0514 National LambdaRail light the future N L R National LambdaRail Update Houston-El Paso –# Sites: 21 –Projected Completion Date: 7/6/2005 KC-Houston –# Sites: 22 (20) –Projected Completion Date: 6/27/2005 El Paso-LA –# Sites: 24 (23) –Projected Completion Date: 8/16/2005 Houston-Baton Rouge –# Sites: 9 (8) –Projected Completion Date: 7/13/2005

15 All-Hands 1/11/0515 National LambdaRail light the future N L R National LambdaRail Update El Paso-Denver –# Sites: 14 –Projected Completion Date: 8/30/2005 DC-NYC –# Sites: 9 –Projected Completion Date: 7/22/2005 NYC-Cleveland –# Sites: 25 (19) –Projected Completion Date: 8/3/2005 Jacksonville-Baton Rouge –# Sites: 15 –Projected Completion Date: 9/14/2005

16 All-Hands 1/11/0516 National LambdaRail light the future N L R National LambdaRail Update Ogden-SLC –# Sites: 2 –Projected Completion Date: 8/18/2005

17 All-Hands 1/11/0517 National LambdaRail light the future N L R For more information… NLR puts the control, the power and the promise of experimental Contact Tom West twest@nlr.net twest@nlr.net NLR: putting the control, the power and the promise of experimental network infrastructure in the hands of our nation ’ s scientists and researchers. light the future N L R


Download ppt "Light the future N L R National LambdaRail Update Joint Techs ‘05 Salt Lake City, Utah Steve Cotter February 13, 2005."

Similar presentations


Ads by Google