Download presentation
Presentation is loading. Please wait.
Published byBaldwin Stewart Modified over 8 years ago
1
Author Wayne M. Koski EVLA Monitor & Control Hardware CDR October 20, 2004 1 EVLA Monitor and Control Monitor & Control Transition
2
Author Wayne M. Koski EVLA Monitor & Control Hardware CDR October 20, 2004 2 Antennas Antennas – Front Ends Not all Front Ends Will Be EVLA Until 2010 F320 FE Transition Module Interfaces up to Two F14’s Uses A/D Design by George Peck In-House Design Simulates VLA Dataset
3
Author Wayne M. Koski EVLA Monitor & Control Hardware CDR October 20, 2004 3 Antennas Antennas – Wye Monitor System M302 Utility Interface Replacement Wye-Com Cable Will Disappear Reduce Two M&C Systems into One Consolidate Functions to Their Devices Reduce Number of External Functions
4
Author Wayne M. Koski EVLA Monitor & Control Hardware CDR October 20, 2004 4 Antennas Antennas – ACU and FRM Systems ACU & FRM System Replacements Not Part of EVLA Phase I Bob Broilo Designed Interface Interface is Between MIB and DCS System ACU & FRM if Replaced Early Will be Paid by Operations or EVLA Contingency
5
Author Wayne M. Koski EVLA Monitor & Control Hardware CDR October 20, 2004 5 Control Building Control Building To Antennas EVLA Antennas Connect to EVLA M&C Includes Transition Modules SLC Operates VLA Antennas Operates EVLA at VLA BasebandUntil New Correlator is Installed No VLA Baseband Transition for the New Correlator
6
Author Wayne M. Koski EVLA Monitor & Control Hardware CDR October 20, 2004 6 Control Building Control Building to Master Rack EVLA Master Rack Connected to EVLA M&C SLC Controls VLA Master Rack SLC is Connected to Modcomps Upon Modcomp Retirement SLC will be Placed under Control of EVLA M&C
7
Author Wayne M. Koski EVLA Monitor & Control Hardware CDR October 20, 2004 7 VLA
8
Author Wayne M. Koski EVLA Monitor & Control Hardware CDR October 20, 2004 8 EVLA & VLA (I)
9
Author Wayne M. Koski EVLA Monitor & Control Hardware CDR October 20, 2004 9 EVLA & VLA (II)
10
Author Wayne M. Koski EVLA Monitor & Control Hardware CDR October 20, 2004 10 Control Building Weather Station Connected to VLA Master Rack Interfaces Re-Designed for EVLA Modernized Weather Instrumentation Fiber Run to Weather Station in Place
11
Author Wayne M. Koski EVLA Monitor & Control Hardware CDR October 20, 2004 11 Control Building Control Building to Wye Monitor System HVACs, UPS’s, and Generators Interfaces Re-Designed for EVLA Fiber Runs to Generator Building, Etc.
12
Author Wayne M. Koski EVLA Monitor & Control Hardware CDR October 20, 2004 12 Control Building Control Building to Other Atmospheric Phase Interferometer (API) Modernized API for EVLA VLBI/VLBA Racks Interface Hooks to EVLA M&C
13
Author Wayne M. Koski EVLA Monitor & Control Hardware CDR October 20, 2004 13 Control Building Control Building to Other HTRP or Pulsar Equipment Racks Stand-Alone – Provide EVLA Hooks New Correlator Provides Improved Capabilities for Pulsar Work Pie Town Link Modernized to EVLA in Future Part of Phase II
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.