Author Wayne M. Koski EVLA Monitor & Control Hardware PDR March 13, 2002 1 EVLA Monitor and Control Monitor & Control Transition
2
Author Wayne M. Koski EVLA Monitor & Control Hardware PDR March 13, 2002 2 Antennas Antennas – Front Ends Not all Front Ends Will Be EVLA EVLA Interface to F14’s Required
3
Author Wayne M. Koski EVLA Monitor & Control Hardware PDR March 13, 2002 3 Antennas Antennas – Wye Monitor System Interface Re-Designed for EVLA MIB to MIB Communications Consolidate Functions to Devices
4
Author Wayne M. Koski EVLA Monitor & Control Hardware PDR March 13, 2002 4 Control Building Control Building – Antenna Interface New Modules Connect to EVLA M&C Includes Temporary Modules SLC Operates VLA Antennas Operates EVLA at VLA Baseband SLC Operated By Modcomps or EVLA Machine
5
Author Wayne M. Koski EVLA Monitor & Control Hardware PDR March 13, 2002 5 Control Building Control Building – Master Rack SLC Controls VLA Master Rack EVLA Master Rack Connected to EVLA M&C Weather Station Interfaces Re-Designed for EVLA Modernized Weather Instrumentation Fiber Run to Weather Station
6
Author Wayne M. Koski EVLA Monitor & Control Hardware PDR March 13, 2002 6 Control Building Control Building – Wye Monitor System HVACs, UPS’s, and Generators Interfaces Re-Designed for EVLA Fiber Run to Generator Building Modcomps Software Watchdogs EVLA Requirements?
7
Author Wayne M. Koski EVLA Monitor & Control Hardware PDR March 13, 2002 7 Control Building Control Building – Other Atmospheric Phase Interferometer (API) VLBI/VLBA Racks HTRP or Pulsar Equipment Racks Pie Town Link IAT Clock