Download presentation
Presentation is loading. Please wait.
Published byBlaze Houston Modified over 8 years ago
1
RESEARCH AND DEVELOPMENT FOR FUTURE LHC SUPERCONDUCTING MAGNETS POINT SUR LA STATION D’ESSAIS préparé par Jean-Marc Gheller Steering committee –September 4 th 2015
2
WP2 - Q4 MAGNETS FOR HL-LHC | P 2 Meeting Collaboration, Steering Committee CERN-CEA | 2015 First design: I=18 kA (~100 k€) For classical current leads(2): Lhe = 55 l/h @ 4,2 K Operation with18 kA requires the use of liquefactor installed in the same building (1,900€ / day) Installation of transfer line (80 m) in the building Adapting ends of transfer line Second design: I=6 kA (~ 20 k€) For classical current leads (2) : Lhe = 18 l/h @ 4,2 K (ongoing study with HTS) Use a 1000 l storage tank Cryostat @1,9 K (23 mbars ABS): 5 W (5,5 l/h, ) - LN 2 heat exchanger will be used for a pre-cooling down to 100K - 1000 l Lhe required for 1 test ( + 2 tests keeping cold) with classical current leads
3
WP2 - Q4 MAGNETS FOR HL-LHC | P 3 Meeting Collaboration, Steering Committee CERN-CEA | 2015 Lhe (4,2 K) Lhe sat (1,9 K) At least 4 h Supply power 6 kA Lhe tank (1000l) Pumping system: 250 m 3 /h (useful) Heater Regulation pressure valve Flow meter indicator Level gauge Magnet measurement G he recovery LN2 exchanger G he recovery Pumping tube EQUIPMENT support plate with Lhe sat pot Currents leads LN 2 heat exchanger Supply power (MSS include) Magnet measurement Temperature sensors, cernox, PT100 Check valves Lhe tank (1000 l) and Lhe line transfert Pumping system Regulation pressure valve Heater Flow meter and level gauge T° sensors LN 2
4
WP2 - Q4 MAGNETS FOR HL-LHC | P 4 Meeting Collaboration, Steering Committee CERN-CEA | 2015 Work planWork time Cost estimation:4 weeks Adapting support plate(study and exterior manufacturing)8 weeks Integration magnet (mounting AdI, supra junctions, internal instrumentation, magnetic measurement): 8 weeks Electrical changes (MSS protection) of supply power4 weeks* Installation and connection (cryogenic, pumping + supply power)2 weeks * Could be in parallel with the other tasks
Similar presentations
© 2024 SlidePlayer.com. Inc.
All rights reserved.