Commissioning the LHCb VErtex LOcator (VELO) Mark Tobin University of Liverpool On behalf of the LHCb VELO group July 28, 2008Vertex 2008: 17th International.

Similar presentations


Presentation on theme: "Commissioning the LHCb VErtex LOcator (VELO) Mark Tobin University of Liverpool On behalf of the LHCb VELO group July 28, 2008Vertex 2008: 17th International."— Presentation transcript:

1 Commissioning the LHCb VErtex LOcator (VELO) Mark Tobin University of Liverpool On behalf of the LHCb VELO group July 28, 2008Vertex 2008: 17th International Workshop on Vertex detectors 1

2 Overview Introduction LHCb experiment. The Vertex Locator (VELO). Description of System. Commissioning the subsystems. Commissioning the full system Status. July 28, 2008 Vertex 2008: 17th International Workshop on Vertex detectors 2

3 Motivation for LHCb LHCb designed to study:  Heavy flavour physics  CP-violation in b sector  Constrain unitarity triangles  Rare B decays  Search for New Physics B meson production:  bb-pairs correlated in space. July 28, 2008 Vertex 2008: 17th International Workshop on Vertex detectors 3

4 LHCb detector design 27th July, 20084 Vertex 2008: 17th International Workshop on Vertex detectors

5 LHCb detector rotated 27th July, 2008 Vertex 2008: 17th International Workshop on Vertex detectors 5

6 LHCb detector (Reality) 27th July, 2008 Vertex 2008: 17th International Workshop on Vertex detectors 6 VELO Muon det Calo’s RICH-2Magnet OT+IT RICH-1 Installation of all detectors is complete

7 Vertex detector requirements Event reconstruction:  Precise tracking  Low mass Vertexing:  Need to separate primary/secondary interactions  Close to beam in extreme radiation environment. Trigger:  Fast reconstruction of primary vertices.  R-Φ sensor geometry. LHC beam tolerance:  Detector must be 30mm from beam at injection July 28, 2008 Vertex 2008: 17th International Workshop on Vertex detectors 7

8 VErtex LOcator 2 retractable halves 5mm from beam when closed 30mm from beam during injection 21 R-Ф modules/half Operates in secondary vacuum (<10 -4 mbar) 300μm foil separates detector from beam vacuum (<10 -8 mbar) 2 phase CO 2 cooling system 27th July, 2008 Vertex 2008: 17th International Workshop on Vertex detectors 8

9 Vacuum system 27th July, 2008 Vertex 2008: 17th International Workshop on Vertex detectors 9 Detector separated from beam vacuum by 300μm Aluminium foil Maximum allowed differential pressure is 5mbar Shape allows overlapping sensors VELO sensors PileUp sensors RF-foil

10 n strip sensor technology (Micron) Double metal layer for signal routing. R sensors:  45 degree quadrants  Pitch=40-101μm Ф sensors:  2 regions  Short/long strips  Pitch=38-100μm  Stereo angle. Sensor Design July 28, 2008 Vertex 2008: 17th International Workshop on Vertex detectors 10

11 Radiation tolerance n + in n-bulk sensors Strip isolation via p + spray 300μm thick Harsh non-uniform radiation environment  1.3x10 14 n eq /cm 2 /year at 8mm  5x10 12 n eq /cm 2 /year at 42mm Run partially depleted after 3-4 year (8fb -1 )  Reduced CCE July 28, 2008 Vertex 2008: 17th International Workshop on Vertex detectors 11 type inverted not type inverted after 1 year of irradiation [2 fb -1 ] R [cm] U dep [V]

12 Module design July 28, 2008 Vertex 2008: 17th International Workshop on Vertex detectors 12 Double sided hybrid to balance stresses due to “bi-metallic effects”. Thermal pyrolytic graphite core removes 24W of heat (ΔT=20C). Carbon fibre cover for rigidity. 2 phase CO 2 cooling system  Sensors operate at -5C Non-planarities ~250μm Sensor-sensor < 10μm Readout with 16 Beetle chips:  2048 channels/sensor.  172032 channels in VELO.

13 Material budget July 28, 2008 Vertex 2008: 17th International Workshop on Vertex detectors 13

14 Material budget/component July 28, 2008 Vertex 2008: 17th International Workshop on Vertex detectors 14

15 Module production (to be repeated) July 28, 2008 Vertex 2008: 17th International Workshop on Vertex detectors 15 6 Visual Inspections, 6 Metrologies, 7 Electrical Tests, 4 Vacuum Tests

16 VELO Assembly @ CERN July 28, 2008 Vertex 2008: 17th International Workshop on Vertex detectors 16

17 Installation July 28, 2008 Vertex 2008: 17th International Workshop on Vertex detectors 17

18 Installation July 28, 2008 Vertex 2008: 17th International Workshop on Vertex detectors 18

19 What the LHC sees during injection… July 28, 2008 Vertex 2008: 17th International Workshop on Vertex detectors 19

20 Overview of VELO electronics July 28, 2008 Vertex 2008: 17th International Workshop on Vertex detectors 20 All components installed. Each system commissioned stand-alone first.

21 Readout Board (Tell1) Analog input from 64 links 10 bit ADC @ 40MHz [A- Rx] FPGA for pre-processing  Cross-talk, common mode suppression, clustering  Zero suppression of data Data sent out by Gigabit ethernet Max output rate is 1.1MHz Control via credit card PC 27th July, 2008 Vertex 2008: 17th International Workshop on Vertex detectors 21 ARX GBE TTCRx CCPC

22 Control system and DAQ All cables and boards installed Extensive testing programme:  ADC cards [A-Rx]  Readout boards [Tell1]  Control boards  Readout slices – Timing – Cable checks – Noise levels July 28, 2008 Vertex 2008: 17th International Workshop on Vertex detectors 22 adjustment of timing to 0.65 ns

23 Low voltage system Standard Easy3000 CAEN system 1 mainframe controller 3 48V power convertors 22 8V/9A 12 channel power supply boards. 2 modules per power supply board. July 28, 2008 Vertex 2008: 17th International Workshop on Vertex detectors 23

24 Problems with LV system Reliability of A3009 8V/9A supplies  Many were sent back to CAEN  Mean = 0.58 Bad connections to front of supply.  Solder leakage on manufacture of connectors. July 28, 2008 Vertex 2008: 17th International Workshop on Vertex detectors 24

25 Safety problem with A3009 modules Tried many safety test.  One problem found. Communication cable was pulled.  Channels stayed on. Jumpers from interlock were pulled.  Channels stayed on. Simultaneous loss of cooling  Rapid heating of hybrid. Firmware fix from CAEN Currently not used. July 28, 2008 Vertex 2008: 17th International Workshop on Vertex detectors 25

26 High Voltage System ISEG EHQ 607n-F 5 Iterations of OPC Server from ISEG An example problem: – Ramp channel one – Turn on channel two – Channel one jumps to target voltage Remaining problem – OPC server crashes ~ once per week Company engineers extremely helpful but a long (and not yet finished) process

27 Commissioning the VELO (I) Single module operation under Neon atmosphere – 18 th March 2008.  Final cooling, vacuum, LV, HV, interlocks, DAQ and control software  Looked at IV scans  Data taken in various configurations Noise level compared with previous data taken in assembly Single module test repeated for all modules on 1st side – 5 th May onwards Warm cooling (8C) Modules operated at 25C Differential pressure between 2 and -5mbar Operation of 15 modules on 15 th May 2008 27th July, 2008 Vertex 2008: 17th International Workshop on Vertex detectors 27 R-side not CM corrected CM corrected Differential pressure

28 Commissioning the VELO (II) Single module test of 2 nd half – from 2 nd June. Full half powered for first time – June 10 th. Many problems found.  Failure and replacement of broken read-out boards.  Problems related to fabrication of Tell1 boards. Preparation for operation under vacuum. 27th July, 2008 Vertex 2008: 17th International Workshop on Vertex detectors 28

29 VELO under vacuum Full detector operated under vacuum after beam evacuated. Operated cooling fully loaded at -25C  Modules @ -5C  Cooling of rf foil affects beam pressure. Majority of data taking during commissioning at -5C  Modules @ 14C.  Minimize thermal cycling of modules. July 28, 2008 Vertex 2008: 17th International Workshop on Vertex detectors 29 10 -5 10 -8

30 System @ full power July 28, 2008 Vertex 2008: 17th International Workshop on Vertex detectors 30 First operation of full system: 01:40 28 th June 2008

31 Data taking Non-zero suppressed data:  300000 events  10Hz with limited event builder. Zero suppressed data (with test pulses)  1kHz with limited event builder.  1/100 th of design rate. July 28, 2008 Vertex 2008: 17th International Workshop on Vertex detectors 31

32 Noise performance July 28, 2008 Vertex 2008: 17th International Workshop on Vertex detectors 32 Phi sensor R sensor Raw noise Common mode subtracted noise

33 Noise all sensors PHI R Mean = 2.062 +/- 0.155 Mean = 1.894 +/- 0.167

34 Noise comparison between single module power up and system power up July 28, 2008 Vertex 2008: 17th International Workshop on Vertex detectors 34

35 Status Installation Module production and assembly of detector halves – March 2007 All other systems installed:  Cooling  Vacuum  Positioning system.  High voltage  Low voltage Installation of detector halves – October 2007 Connected the cables to the modules. Full system operation – June 2008 Outstanding issues Integration into LHCb global running. 3 broken Tell1 boards to be replaced. Data taking at high rates. Software improvements:  Online monitoring. Wait for first beams. July 28, 2008 Vertex 2008: 17th International Workshop on Vertex detectors 35

36 Conclusions All components fully installed and tested. Extensive commissioning programme over last year. First operation of whole detector under vacuum  99.2% of channels fully operational. LHCb VErtex LOcator in good shape for first beams July 28, 2008 Vertex 2008: 17th International Workshop on Vertex detectors 36


Download ppt "Commissioning the LHCb VErtex LOcator (VELO) Mark Tobin University of Liverpool On behalf of the LHCb VELO group July 28, 2008Vertex 2008: 17th International."