Krzysztof Śliwa 26 August, 2015 Tests done between 7th to 25th of August 2015 Circulation in by-pass over the manifold dummy-loads Power ranges tested: › 7.5 kW x 2 in back-up mode (one plant serving two manifolds) › 6.25 kW x 2 in back-up mode (one plant serving two manifolds) › 5 kW x 2 in back-up mode (one plant serving two manifolds) Temperature range tested (nominal = -20 °C): › -25 °C depending on load conditions › +15 °C
3
Krzysztof Śliwa 26 August, 2015
4
Krzysztof Śliwa 26 August, 2015 Circulate in sector -15 (Bpix loop 1049, 1050, 1051, 1052) at -20 °C, -25 °C,-30 °C and -35 °C
5
Krzysztof Śliwa 26 August, 2015
6
Krzysztof Śliwa 26 August, 2015 7.5 kW x 2 in back-up mode (one plant serving two manifolds) 6.25 kW x 2 in back-up mode (one plant serving two manifolds) 5 kW x 2 in back-up mode (one plant serving two manifolds)
7
Krzysztof Śliwa 26 August, 2015 7.5 F B temp. supply manifold temp. return manifold temp. after the pump temp. before the pump load on first heater load on second heater subcooling saturat. temp in accum.
8
Krzysztof Śliwa 26 August, 2015 7.5 F B temp. supply manifold temp. return manifold temp. after the pump temp. before the pump load on first heater load on second heater subcooling saturat. temp in accum.
9
Krzysztof Śliwa 26 August, 2015 6.256.25 6.256.25 F B temp. supply manifold temp. return manifold temp. after the pump temp. before the pump load on first heater load on second heater subcooling saturat. temp in accum.
10
Krzysztof Śliwa 26 August, 2015 6.256.256.256.25 F B temp. supply manifold temp. return manifold temp. after the pump temp. before the pump load on first heater load on second heater subcooling saturat. temp in accum.
11
Krzysztof Śliwa 26 August, 2015 55 temp. supply manifold temp. return manifold temp. after the pump temp. before the pump load on first heater load on second heater subcooling saturat. temp in accum. B F
12
Krzysztof Śliwa 26 August, 2015 55 F B temp. supply manifold temp. return manifold temp. after the pump temp. before the pump load on first heater load on second heater subcooling saturat. temp in accum.
13
Krzysztof Śliwa 26 August, 2015 In all back-up mode: › Liquid balance in the accumulator is needed. Together with Maciej discovered this problem on Bpix back-up mode with 2x6.25 kw
14
Krzysztof Śliwa 26 August, 2015 Bpix and Fpix at the same time (normal operation) Bpix back-up mode Fpix back-up mode
15
Krzysztof Śliwa 26 August, 2015 10.5 F B temp. supply manifold temp. return manifold temp. before the pump load on first heater load on second heater subcooling saturat. temp in accum. temp. after the pump
16
Krzysztof Śliwa 26 August, 2015 88 F B temp. supply manifold temp. return manifold temp. before the pump load on first heater load on second heater subcooling saturat. temp in accum. temp. after the pump
17
Krzysztof Śliwa 26 August, 2015 55 F B temp. supply manifold temp. return manifold temp. before the pump load on first heater load on second heater subcooling saturat. temp in accum. temp. after the pump
18
Krzysztof Śliwa 26 August, 2015 Different max load between Bpix back-up mode (8 kW on the dummy load) and Fpix back-up mode (8.5 kW on the dummy load)
19
Krzysztof Śliwa 26 August, 2015 Bpix with 7.5 kW at +15 °C Fpix with 7.5 kW at +15 °C Bpix and Fpix at the same time (normal operation) with 7.5 kW at +15 °C
20
Krzysztof Śliwa 26 August, 2015 6.75 F B temp. supply manifold temp. return manifold temp. before the pump load on first heater load on second heater subcooling saturat. temp in accum. temp. after the pump
21
Krzysztof Śliwa 26 August, 2015 6.75 F B temp. return manifold temp. supply manifold temp. after the pump temp. before the pump subcooling pump speed
22
Krzysztof Śliwa 26 August, 2015
23
Krzysztof Śliwa 26 August, 2015 6.75 F B temp. supply manifold temp. return manifold temp. before the pump load on first heater load on second heater subcooling saturat. temp in accum. temp. after the pump
24
Krzysztof Śliwa 26 August, 2015 6.75 F B temp. return manifold temp. supply manifold temp. after the pump temp. before the pump subcooling pump speed
25
Krzysztof Śliwa 26 August, 2015
26
Krzysztof Śliwa 26 August, 2015 6.5 F B
27
Krzysztof Śliwa 26 August, 2015
28
Krzysztof Śliwa 26 August, 2015
29
Krzysztof Śliwa 26 August, 2015 Temperature test at +15°C: › I couldn’t reach 7,5 kW on dummy load › Different flow between Bpix and Fpix. At beginning of tests different value of stroke in normal operations: Bpix (70.1) and Fpix (69.6).
30
Krzysztof Śliwa 26 August, 2015
31
Krzysztof Śliwa 26 August, 2015 First test: I connected Helium bottle to safety valve Second test: I connected CO 2 bottle to safety valve
32
Krzysztof Śliwa 26 August, 2015 Start Finish Pressure at the valve 70 bar Pressure inside the bottle almost 200 bar
33
Krzysztof Śliwa 26 August, 2015 Finish Start Pressure at the valve 60 bar Pressure inside the bottle 60 bar
34
Krzysztof Śliwa 26 August, 2015 Date: 13/08/2015 Drop of oil
35
Krzysztof Śliwa 26 August, 2015 Date: 17/08/2015 Drop of oil
36
Krzysztof Śliwa 26 August, 2015 Date: 20/08/2015 Date: 24/08/2015
37
Krzysztof Śliwa 26 August, 2015 Tests at +15°C: › Bpix in back-up mode with 2x7.5 kW › Fpix in back-up mode with 2x7.5 kW Circulation test in sector +14