ESA UNCLASSIFIED – For Official Use MAPPS Software Review Board
2
SRB_Technical| C Borrett | ESAC| 10/12/2014 | TEC-SWG | Slide 2 ESA UNCLASSIFIED – For Official Use Overview 1.Progress since last SRB - Colin 2.MAPPS Timeline Visualisation Update – Colin 3.JIRA / GIT / Confluence Migration - Federico 4.Allocation of Issues
3
SRB_Technical| C Borrett | ESAC| 10/12/2014 | TEC-SWG | Slide 3 ESA UNCLASSIFIED – For Official Use Half Yearly Progress 1.Majority of tasks from the previous SRB planning not completed 2.Tasks completed a.Virtual Channels b.CCSDS Orbit Files c.JIRA / GIT Migration d.HGA mask constraint checks / AGM position error / HGA constraint strategy e.FTS Plugin f.Observation Modifications (partial) g.Planning DB (partial) h.Timeline Visualisation Kickoff i.3D Visualisation iterations & validation
4
SRB_Technical| C Borrett | ESAC| 10/12/2014 | TEC-SWG | Slide 4 ESA UNCLASSIFIED – For Official Use Half Year Progress 1.New tasks and maintenance for all missions (these amongst others) a.Output file format changes b.Data rate and power profiles c.Attitude divergence issues d.Downlink plugin features e.Thermal Flux Plugin f.Leap second update 2.Support provided (amongst others) a.Plugin usage b.Observation usage and definitions c.Modelling support d.Planning Module GUI discussions e.FD Future Services URD discussions
5
SRB_Technical| C Borrett | ESAC| 10/12/2014 | TEC-SWG | Slide 5 ESA UNCLASSIFIED – For Official Use MAPPS Software Migration 1.FN discussion of GIT/Confluence and JIRA migration
6
SRB_Technical| C Borrett | ESAC| 10/12/2014 | TEC-SWG | Slide 6 ESA UNCLASSIFIED – For Official Use MAPPS Timeline Visualisation Update 1.Contract kicked off September a.Two collocations in October and November b.Provided Timeline Visualisation Requirements c.Provided Interfaces 2.CB developed prototype DataSampler integrated into MAPPS for retrieving real data (see Slack conversions) 3.Two versions already delivered a.Conversion of input timelines into graphical elements b.Drag / drop movement of timelines c.Graphs, Horizontal Bars and Symbols supported d.Zooming e.Removal of timeline from display
7
SRB_Technical| C Borrett | ESAC| 10/12/2014 | TEC-SWG | Slide 7 ESA UNCLASSIFIED – For Official Use Next 6 Months 1.Planning Module prioritisation a.GUI element (Solar Orbiter) – FN focus b.Scheduling / Opportunity Analysis & event finder (EXM) – split between FN and CB c.Object Models for Database integration (Bepi) 2.AGM Updates a.Central body modification (away from CG specific implementation) b.EXM PTR definitions (if required) 3.Timeline Visualisation 4.Planning DB Plugins 5.Generic Profile / Envelope Update 6.Data Flow updates
8
SRB_Technical| C Borrett | ESAC| 10/12/2014 | TEC-SWG | Slide 8 ESA UNCLASSIFIED – For Official Use Allocation 1.Allocation of issues to JIRA – assume 2 people, realistically we may need 3 (for the management meeting) 2.At least one version of MAPPS a month 3.Version shall be released prior to the MAPPS User Group Meeting 4.Request from MAPPS team: a.Please review the issues allocated to the delivered version b.If possible, test and close the issue before the next delivery so that we can iterate on any problems as soon as possible. c.Reality is that this may not be possible in operational missions where other things may take priority