Download presentation
Presentation is loading. Please wait.
Published byHoratio Elliott Modified over 8 years ago
1
NASA MSFC Mission Operations Laboratory MSFC NASA MSFC Mission Operations Laboratory EXPRESS Logisitics Carrier (ELC) Operations Overview POIWG #26, August 2009 Ruxton Istre EO30 (256)961-0210 ruxton.b.istre@nasa.gov Approved for Public Release, Distribution Unlimited.
2
NASA MSFC Mission Operations Laboratory MSFC Page 2 EXPRESS Logistics Carrier Overview EXPRESS Logistics Carriers are mounted on the S3 and P3 trusses to support 2 science payloads and stowage for ORUs. ELC-1 and ELC-2 are launched on ULF-3. ELC-1 will be located at the P3 Nadir UCCAS and ELC-2 will be located at the S3 Upper Outboard PAS site. POIC will operate the ELCs
3
NASA MSFC Mission Operations Laboratory MSFC Page 3 ELC Capabilities and Functions ELC Capabilities Structural mounting for exposed payloads. Heater power for payloads and ORUs. Provides dedicated 120VDC power to the ORU heaters that are default “ON” at power up. Provides both 28 VDC and 120VDC power for heaters at payload locations Operational power for payloads Provides 120 VDC power for payloads Command and data handling for payloads to ISS Standard command interfaces as provided by the PL MDM Health and Status pass thru from payloads to PL MDM LRT pass thru from payloads to PL MDM for downlink High Rate Data connection via the ELC to ISS for science telemetry
4
NASA MSFC Mission Operations Laboratory MSFC Page 4 External Topology at ULF-3 ESP-3 ELC2 ELC1 STARBOARD PORT Kibo (JAXA) Columbus (ESA) S3 Truss P3 Truss Node 2
5
NASA MSFC Mission Operations Laboratory MSFC Page 5 Increment 21/22 Operations Summary ULF-3 Joint Operations Summary During the ULF-3 Joint Ops, ELC-1 and ELC-2 will be unberthed from the payload bay and attached to ISS using the RMS and SSRMS. After installation, power will be applied and PRO will begin a checkout of all systems on the ELCs. MISSE-7 will be installed on ELC-2 during a Joint Operations EVA. PRO will support MISSE-7 activation and checkout. PRO will support any ORU removal/replacement as required.
6
NASA MSFC Mission Operations Laboratory MSFC Page 6 Increment 23/24 Operations Summary ULF-5 Joint Operations Summary During the ULF-5 Joint Ops, ELC-4 will be unberthed from the payload bay and attached to ISS using the RMS and SSRMS. After installation, power will be applied and PRO will begin a checkout of all systems on ELC-4 PRO will support any ORU removal/replacement as required.
7
NASA MSFC Mission Operations Laboratory MSFC Page 7 ELC Operations Lead Roles and Responsibilities Certified PRO supporting console operations. Develop and maintain ELC Payload Systems Manual Participate in ELC meetings as required Develop and maintain ELC URC inputs for each Increment Support KSC and MSFC testing for ELC and sub-carrier payload testing Reviews Software Interface Control Document (ICD) for every ELC each Flight Support Increment Lead POD as required Provides technical input for Ground Command Procedure development Develops and maintains Phase I, II, and III training for ELC Reviews ECRs, CEFs, etc. for ELC
Similar presentations
© 2024 SlidePlayer.com. Inc.
All rights reserved.