Download presentation
Presentation is loading. Please wait.
Published byBuck Clark Modified over 9 years ago
1
RF-FOIL MOUNTING SCENARIO CHEMICAL ATTACK TOOLING PVC FLANGE - THE PVC FLANGE UPSIDE DOWN ON “TABLE”
2
RF-FOIL MOUNTING SCENARIO CHEMICAL ATTACK TOOLING O-RING - O-RING INSTALLATION ON THE PVC FLANGE PVC FLANGE
3
RF-FOIL MOUNTING SCENARIO CHEMICAL ATTACK TOOLING RF-FOIL BOX ON FLANGE JOINT BETWEEN FLANGE BOX AND PVC FLANGE - RF-FOIL BOX FIXED TO THE PVC FLANGE
4
RF-FOIL MOUNTING SCENARIO CHEMICAL ATTACK TOOLING RF-FOIL BOX ON FLANGE ASSEMBLY PVC “COOLING” BOX - RF-FOIL BOX AND FLANGE ASSEMBLY FIXED TO PVC “COOLING BOX
5
RF-FOIL MOUNTING SCENARIO CHEMICAL ATTACK TOOLING RF-FOIL FULLY EQUIPED ROTATIVE FRAME - RF-FOIL BOX FULLY EQUIPED FIXED TO THE ROTATIVE FRAME
6
RF-FOIL MOUNTING SCENARIO CHEMICAL ATTACK TOOLING - RF-FOIL BOX AND ROTATIVE FRAME FIXED TO CHARIOT RF-FOIL AND ROTATIVE FRAME BEARING CHARIOT
7
RF-FOIL MOUNTING SCENARIO CHEMICAL ATTACK TOOLING - RF-FOIL BOX AND CHARIOT INDEXING ON BEARING
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.