POWERGRID Welcomes Shri Atal Bihari Vajpayee Hon ’ ble Prime Minister of India on Inauguration of Northern Region Unified Load Dispatch and Communication.

Similar presentations


Presentation on theme: "POWERGRID Welcomes Shri Atal Bihari Vajpayee Hon ’ ble Prime Minister of India on Inauguration of Northern Region Unified Load Dispatch and Communication."— Presentation transcript:

1 POWERGRID Welcomes Shri Atal Bihari Vajpayee Hon ’ ble Prime Minister of India on Inauguration of Northern Region Unified Load Dispatch and Communication Scheme January 11, 2002

2 Commencement of commercial operation : 1992-93 Largest transmission utility in the World today with EHV network of 40,000 ckt kms wheeling 33,000 MW (40% of total power) System availability over 98% at par with International standards Consistently profit making Most of 17 major projects on time and within cost Bestowed with PM’s Awards for excellent performance against MOU with GoI POWERGRID PROFILE

3 Development of National Grid with addition of 60,000 Ckt Kms of Transmission Network with an investment of Rs. 74,000 Cr to carry additional 1,00,000 MW by 2011-12 Existing 4850 MW inter-regional transfer capacity to be enhanced to 30,000 MW by 2012 Diversifying into Telecom business Delhi-Chandigarh link under commercial use Delhi-Mumbai link by Mid, 2002 Balance network by December 2003 Diversifying into Distribution, assisting 12 Circles in various States POWERGRID PERSPECTIVE PLAN

4 Quick restoration of power supply through Emergency Restoration System and trained manpower Gujarat cyclone in 1998, power restored within a week Orissa Cyclone in October, 1999, power restored within 11days Gujarat earthquake January, 2001 Power restored within one week Built 10 Sub-stations within 3 months, inaugurated by Hon’ble PM DISASTER MANAGEMENT

5

6 Erection of ERS by Helicopter

7 TOWARDS GREEN ENVIRONMENT

8 A STATION AND ITS GREENERY

9 5 Regional ULDC schemes under implementation, estimated cost Rs. 2,200 cr. NRLDC Project Cost Rs 659 cr., Payback period 3 years Most complex system covering 15 electrical utilities spread over ten (10) lakh square kilometers with 33 control centres and 369 RTUs Advance Training Simulator State-of-the-art technology Supervisory Control and Data Acquisition (SCADA) Energy Management System (EMS) Hybrid dedicated Communication System with Live Line Optic Fibre Stringing and Microwave UNIFIED LOAD DESPATCH & COMMUNICATION (ULDC) SCHEMES

10 HIERARCHICAL SETUP RTU SUB LDC SLDC ERLDC WRLDC NRLDCSRLDCNERLDC 5 Nos. NLDC 32 Nos. 41 Nos. 1160 Nos.

11 OBJECTIVES AND BENEFITS Through real time monitoring & control system security, reliability, voltage & frequency profiles improved Avoidance/ minimization of grid disturbances and quick restoration in case of failure Optimal utilization of resources and economic dispatch of power

12 UNIFIED LOAD DESPATCH & COMMUNICATION SCHEME (NORTHERN REGION) J F H H H H H Chandigarh,BBMB DVB Lucknow Panipat(HSEB) H Patiala F F F F F Panipat (BBMB) F Dadri (B) Dadri (H) F F F F F Rishikesh F Bhilwara F Kota F Ratangarh F Narwana F Hamirpur F F Laltonkalan F Jallandhar (P) F Jallandhar (B) F Ganguwal (B) H Heerapura F H Jammu & Kashmir Himachal Pradesh Punjab Uttar Pradesh Rajasthan Gujarat Madhya Pradesh F Bemina J&K SEB 1 SLDC 1 Sub-LDC 16 RTUs PSEB 1 SLDC 2 Sub-LDC 40 RTUs HVPNL 1 SLDC 2 Sub-LDC 42 RTUs RVPNL 1 SLDC 3 Sub-LDC 79 RTUs HPSEB 1 SLDC 2 Sub-LDC 16 RTUs DVB 1 SLDC 4 Sub-LDC 31 RTUs UPPCL 1 SLDC 4 Sub-LDC 55 RTUs RLDC NEW DELHI 36 RTUs CPCC KANPUR 6 RTUs SLDC Sub - LDC H F Gladni Panki ana Uttaranchal 1 SLDC 27 RTUs BBMB 1 SLDC 4 Sub-LDC 21 RTUs Hary Moradabad Varanasi Sultanpur Delhi Jutogh Kunihar H Rishikesh

13 Thank You


Download ppt "POWERGRID Welcomes Shri Atal Bihari Vajpayee Hon ’ ble Prime Minister of India on Inauguration of Northern Region Unified Load Dispatch and Communication."