Presentation is loading. Please wait.

Presentation is loading. Please wait.

GCRC Informatics Project Sponsor: Dr. Paul Harris, GCRC Informatics Director Faculty Mentor: Dr. Andrew Dozier Members: Chris Heath, BME/EE Adam Nagel,

Similar presentations


Presentation on theme: "GCRC Informatics Project Sponsor: Dr. Paul Harris, GCRC Informatics Director Faculty Mentor: Dr. Andrew Dozier Members: Chris Heath, BME/EE Adam Nagel,"— Presentation transcript:

1 GCRC Informatics Project Sponsor: Dr. Paul Harris, GCRC Informatics Director Faculty Mentor: Dr. Andrew Dozier Members: Chris Heath, BME/EE Adam Nagel, CompE Chris Nash, EE Brendan Soar, CompE April 26, 2005 IAB Presentation

2 What is the GCRC? General Clinical Research Center GCRC monitors patients taking experimental medicines and suffering from rare medical conditions Patients’ vital signs are recorded frequently

3 System Requirements Must trigger & retrieve measurements from monitors –At least every 60 seconds Must upload data to MySQL server via IEEE 802.11b Must be simple to use –Operated by untrained nurses –Must allow setting of measurement interval –Allow for taking a measurement at any time Must be easily modified to accommodate new devices Must be highly reliable –Loss of any data is unacceptable

4 Measurement Equipment and Interfaces Vital signs monitors –DINAMAP Pro 1000 –RS-232 (serial) –Opto-Isolated Adapter GCRC network –IEEE 802.11b wireless LAN –Security features Data server –MySQL server –Web-based front end for researchers

5 PDA Solution Graffiti, Touch screen PDA SQL Server Dinamap Monitor Serial commands Data User Commands Device Status Data Web Server MySQL Commands

6 PDA Solution, cont. PDA OSBluetooth Bluetooth to Serial Dinamap 802.11b To GCRC network To User Interface Local Storage PDA device

7 Use HTTP to Access Web Script

8 National Instruments LABVIEW 7.1 Bluetooth management Serial communication Fully-functional file I/O system –Parsing is simple TCP functions allow web access Intuitive and easy to learn Full-featured PDA development toolkit

9 Demonstration

10 Testing Short Duration Testing –Less than 1 hour test –Fixed small bugs Long Duration Testing –Multiple 5+ hour tests –Solved memory problems with Windows upgrade

11 Project Status Finished Field Test Working Product Awaiting Deployment


Download ppt "GCRC Informatics Project Sponsor: Dr. Paul Harris, GCRC Informatics Director Faculty Mentor: Dr. Andrew Dozier Members: Chris Heath, BME/EE Adam Nagel,"

Similar presentations


Ads by Google