Presentation is loading. Please wait.

Presentation is loading. Please wait.

EO10-PPO-044 Revision G 9/21/15 PARC/T. Cassady Body Measures 1:15 BODYM-NODE2-VID R5 :15 1:25 Crew Unattended :30 P/L-RSTRCT VID-CNFG TEXTFlexible :05.

Similar presentations


Presentation on theme: "EO10-PPO-044 Revision G 9/21/15 PARC/T. Cassady Body Measures 1:15 BODYM-NODE2-VID R5 :15 1:25 Crew Unattended :30 P/L-RSTRCT VID-CNFG TEXTFlexible :05."— Presentation transcript:

1 EO10-PPO-044 Revision G 9/21/15 PARC/T. Cassady Body Measures 1:15 BODYM-NODE2-VID R5 :15 1:25 Crew Unattended :30 P/L-RSTRCT VID-CNFG TEXTFlexible :05 Session Day -1Session Day :05 Photo, Video, and Tape Measurement (Single Ops) :25 :30 BODYM-EQUIP-GATHER (can be the day before, if the day before make it flexible) REMINDER-BODYM (post-sleep) REMINDER-BODYM (pre-sleep) BODYM-EXP-OPS_SUB (before midday meal, as early as possible in crew morning) BODYM-EXP-OPS_OPR 1:55  Sessions required at FD15 (+/- 5 days), FD80 (+/- 7 days), and R-15 (+/- 15 days) for all subjects. Additional sessions (nominally carried as reserve) required at FD45 (+/- 7 days), FD105 (+/- 7 days), and FD135 (+/- 7 days) for all subjects.  Modified Ops may replace Single Ops during WLP/STP timeframe to satisfy Ku-Band requirements. When replaced, refer to the Photo, Video, and Tape Measurement (Modified Ops) slide.  Sessions for two subjects should be combined when possible. When combined, refer to the Photo, Video, and Tape Measurement (Combined Ops) slide.

2 EO10-PPO-044 Revision G 9/21/15 PARC/T. Cassady Body Measures :50 BODYM-NODE2-VID1 R5 :15 :55 Crew Unattended :30 P/L-RSTRCT VID-CNFG TEXTFlexible :05 Session Day -1Session Day :05 Photo, Video, and Tape Measurement (Modified Ops) BODYM-EQUIP-GATHER (can be the day before, if the day before make it flexible) REMINDER-BODYM (post-sleep) REMINDER-BODYM (pre-sleep) BODYM-EXP-OPS1_SUB (before midday meal, as early as possible in crew morning) BODYM-EXP-OPS1_OPR 1:30  Sessions required at FD15 (+/- 5 days), FD80 (+/- 7 days), and R-15 (+/- 15 days) for all subjects. Additional sessions (nominally carried as reserve) required at FD45 (+/- 7 days), FD105 (+/- 7 days), and FD135 (+/- 7 days) for all subjects.  Modified Ops may replace Single Ops during WLP/STP timeframe to satisfy Ku-Band requirements. When not replaced, refer to the Photo, Video, and Tape Measurement (Single Ops) slide.  Sessions for two subjects should be combined when possible. When combined, refer to the Photo, Video, and Tape Measurement (Combined Ops) slide. :10 :25 :15 BODYM-NODE2-VID2 R5 :30 P/L-RSTRCT VID-CNFG BODYM-EXP-OPS2_SUB (before midday meal, as early as possible in crew morning) BODYM-EXP-OPS2_OPR :30 :25 :30

3 EO10-PPO-044 Revision G 9/21/15 PARC/T. Cassady Body Measures 1:30 BODYM-NODE2-VID1 R5 :15 1:45 Crew Unattended :30 P/L-RSTRCT VID-CNFG TEXTFlexible :05 Session Day -1Session Day :05 :30 BODYM-NODE2-VID2 R5 :30 P/L-RSTRCT VID-CNFG :05 Photo, Video, and Tape Measurement (Combined Ops) BODYM-EXP-NBP_SUB1 (desired before midday meal, as early as possible in crew morning) BODYM-EQUIP-GATHER (can be the day before, if the day before make it flexible) REMINDER-BODYM (post-sleep) REMINDER-BODYM (pre-sleep) BODYM-EXP-MEAS_SUB1 (before midday meal, as early as possible in crew morning)  Sessions required at FD15 (+/- 5 days), FD80 (+/- 7 days), and R-15 (+/- 15 days) for all subjects. Additional sessions (nominally carried as reserve) required at FD45 (+/- 7 days), FD105 (+/- 7 days), and FD135 (+/- 7 days) for all subjects.  Sessions for two subjects should be combined when possible. When not combined, refer to the Photo, Video, and Tape Measurement (Single Ops) slide. REMINDER-BODYM (pre-sleep) BODYM-EXP-MEAS_SUB2 REMINDER-BODYM (post-sleep) 2:10 :25 :30 :10 :40 BODYM-EXP-NBP_SUB2 :45

4 EO10-PPO-044 Revision G 9/21/15 PARC/T. Cassady Body Measures HRF1-SLAMMD-BMM_SUB (all subjects, sequentially, in any order) SLAMMD Body Mass Measurement Crew Commanding Unattended :30:15 :20 OR :30 OR :15 OR :20 :10 HRF1-SLAMMD-TRACK ESA-HRF1-DEACT (ESA) ESA-HRF1-ACT (ESA) HRF1-RACK/PC-TRACK 1:00 HRF1-RACK-PWRUP CMD HRF1-SLAMMD-SETUP OR HRF1-SLAMMD-SETUP1 OR (1 st performance/operator) HRF1-SLAMMD-SU CTRL OR HRF1-SLAMMD-SU CTRL1 OR (control run performed) (1 st performance/operator, control run performed) HRF1-SLAMMD-SU PARTL OR HRF1-SLAMMD-SU PRTL CR (SLAMMD partially deployed) (SLAMMD partially deployed, control run performed) HRF1-RACK-PWRDN CMD HRF1-SLAMMD-STOW OR HRF1-SLAMMD-STOW TMP OR HRF1-SLMD-STW TMP CR (SLAMMD left partially deployed (control run perform, SLAMMD left partially deployed) HRF1-SLAMMD-CTRL RUN (control run performed, assume 1 st session/increment :20 OR :10 OR :20  Sessions required at FD15, FD80, and R-30 (all +/- 30 days of photo, tape, and video measurement session; once every other month) for all subjects.  Sessions should be combined with concurrent SLAMMD sessions for other HRP experiments for all subjects.  This data may also be obtained using the Russian BMM device.

5 EO10-PPO-044 Revision G 9/21/15 PARC/T. Cassady Body Measures Change#RevisionIncDateCrew Roll-up* (hrs) PTP (hrs) Notes EO10-PPO-13- 026 Baseline37/38 & Subs 8/8/13Nominal: 21.58 Reserve: 21.25 Inc 37/38 Working PTP 6/5/13 Nominal: 18.25 Reserve: 17.92 Ops: - Body Measures Photo, Video, and Tape Measurement (FD15, FD80, R-30 nominal; FD45, FD105, FD135 nominally reserve): 4.25 hrs/session. - Body Measures SLAMMD Body Mass Measurement (FD15, FD80, R-30; assume every other month): 0.83 hrs/session for one subject (setup-BMM-stow); 0.17 hrs for each additional subject (BMM) on same day; additional 0.17 hrs for 1st operator performance (assume once/increment, time covered by Pro K); additional 0.25 hrs for control run (every 6 months, time covered by Pro K this increment); 0.00 hrs/session when performed with Pro K (no additional time or BMM required). Nominal: Hopkins (36S I37/38 FE3): - 3 Body Measures photo-video-tape sessions (FD15, FD80, and R-30). - 3 Biochem Profile-Body Measures-Pro K SLAMMD sessions (assume 1st, 3rd, and 5th months) (session time covered by Pro K). Wakata (37S I38 FE6): - 2 Body Measures photo-video-tape sessions (FD15 and FD80). - 2 Biochem Profile-Body Measures SLAMMD sessions (assume 1st and 3rd months) (BMM time covered by Body Measures; setup-stow time covered by Pro K under Hopkins). Reserve: Hopkins (36S I37/38 FE3): - 3 Body Measures photo-tape-video sessions (FD45, FD105, and FD135). Wakata (37S I38 FE6): - 2 Body Measures photo-tape-video sessions (FD45 and FD105). PPO Change Log *Crew Roll-up is not maintained real-time.

6 EO10-PPO-044 Revision G 9/21/15 PARC/T. Cassady Body Measures Change#RevisionIncDateCrew Roll-up* (hrs) PTP (hrs) Notes EO10-PPO-13- 042 Revision A39/40 & Subs 12/12/13Nominal: 36.50 Reserve: 34.00 Inc 39/40 Working PTP 10/21/13 Nominal: 36.50 Reserve: 34.00 Ops: - Body Measures Photo, Video, and Tape Measurement (FD15, FD80, R-30 nominal; FD45, FD105, FD135 nominally reserve): 4.25 hrs/session. - Body Measures SLAMMD Body Mass Measurement (FD15, FD80, R-30; assume once every other month): 0.83 hrs/session for one subject (setup-BMM-stow); 0.17 hrs for each additional subject (BMM) on same day; additional 0.17 hrs for 1st operator performance (assume once this increment, time covered by Pro K); additional 0.25 hrs for periodic control run (every 6 months, time covered by Pro K this increment); 0.00 hrs/session when performed with Pro K (no additional time or BMM required). Nominal: Wakata (37S I39 CDR): - 1 Body Measures photo-tape-video session (R-30). - 1 Biochem Profile-Body Measures SLAMMD session (assume 5th month) (session time covered by Body Measures). Swanson (38S I39/40 FE3/CDR): - 3 Body Measures photo-tape-video sessions (FD15, FD80, and R-30). - 3 Biochem Profile-Body Measures SLAMMD sessions (assume 1st, 3rd, and 5th months) (BMM time covered by Body Measures; setup-stow time covered by Body Measures (1) under Wakata and by Pro K (2) under Wiseman). Wiseman (39S I40 FE5): - 2 Body Measures photo-tape-video sessions (FD15 and FD80). - 2 Biochem Profile-Body Measures-Pro K SLAMMD sessions (assume 1st and 3rd months) (session time covered by Pro K). Gerst (39S I40 FE6): - 2 Body Measures photo-tape-video sessions (FD15 and FD80). - 2 Biochem Profile-Body Measures SLAMMD sessions (assume 1st and 3rd months) (BMM time covered by Body Measures; setup-stow time covered by Pro K under Wiseman). (continued on next page) PPO Change Log *Crew Roll-up is not maintained real-time.

7 EO10-PPO-044 Revision G 9/21/15 PARC/T. Cassady Body Measures Change#RevisionIncDateCrew Roll-up* (hrs) PTP (hrs) Notes Reserve: Wakata (37S I39 CDR): - 1 Body Measures photo-tape-video session (FD135). Swanson (38S I39/40 FE3/CDR): - 3 Body Measures photo-tape-video sessions (FD45, FD105, and FD135). Wiseman (39S I40 FE5): - 2 Body Measures photo-tape-video sessions (FD45 and FD105). Gerst (39S I40 FE6): - 2 Body Measures photo-tape-video sessions (FD45 and FD105). pycmall000423-39/40 & Subs 2/19/14--Added exercise related reminder activity to reflect new direction to repeat pre-sleep exercise related reminders in next day’s post-sleep. hopsall001191-39/40 & Subs 4/4/14--Created activities to reflect new requirement to perform photo, video, and tape measurement as a combined session for 2-crew as optional ops. hopsall001193-39/40 & Subs 4/11/14--Changed video activity name from Lab to Node2 to reflect previous OCR’s PARD and procedure rev update to provide a better image for ground team. hopsall001230Revision B39/40 & Subs 8/1/14--Changed R-30 photo, video, and tape measurement session to R-15 with a +/- 15-day window to reflect payload ED rev update. EO10-PPO-14- 039 Revision C39/40 & Subs 8/18/14--Added PPO document number to reflect new EO10 OPR Configuration Control Plan for PPOs. PPO Change Log *Crew Roll-up is not maintained real-time.

8 EO10-PPO-044 Revision G 9/21/15 PARC/T. Cassady Body Measures Change#RevisionIncDateCrew Roll-up* (hrs) PTP (hrs) Notes parcall000039Review D41/42 & Subs 9/15/14Nominal: 19.00 Reserve: 17.00 Inc 41/42 Working PTP 8/6/14 Nominal: 19.00 Reserve: 17.00 Ops: - Body Measures Photo, Tape, Video Measurement (FD15, FD80, R-15 nominal; FD45, FD105, FD135 nominally reserve): 4.25 hrs/session. - Body Measures SLAMMD Body Mass Measurement (FD15, FD80, R-30; assume every other month): 0.83 hrs/session for one subject (setup-BMM-stow); 0.17 hrs for each additional subject (BMM) on same day; additional 0.17 hrs for 1st operator performance (assume 2 times this increment, time covered by Biochem Profile and by Body Measures one each); additional 0.25 hrs for periodic control runs (every 6 months, time covered by Pro K this increment); when performed with Biochem Profile or Pro K, no additional time or BMM required (payload carrying majority of time varies). Nominal: Wiseman (39S I41 FE5): - 1 Body Measures photo-tape-video session (R-15). - 1 Biochem-Profile-Body Measures-Pro K SLAMMD session (assume 5th month) (session time covered by Pro K). Gerst (39S I41 FE6): - 1 Body Measures photo-tape-video session (R-15). - 1 Biochem Profile-Body Measures SLAMMD session (assume 5th month) (BMM time covered by Body Measures; setup-stow time covered by Pro K under Wiseman). Virts (41S I42 FE6): - 2 Body Measures photo-tape-video sessions (FD15 and FD80). - 2 Biochem Profile-Body Measures SLAMMD sessions (assume 1st and 3rd months) (session time covered by Body Measures, includes 1st operator performance time). Reserve: Wiseman (39S I41 FE5): -1 Body Measures photo-tape-video session (FD135). Gerst (39S I41 FE6): -1 Body Measures photo-tape-video session (FD135). Virts (41S I42 FE6): - 2 Body Measures photo-tape-video sessions (FD45 and FD105). PPO Change Log *Crew Roll-up is not maintained real-time.

9 EO10-PPO-044 Revision G 9/21/15 PARC/T. Cassady Body Measures Change#RevisionIncDateCrew Roll-up* (hrs) PTP (hrs) Notes hopsall001254Revision E41/42 & Subs 10/30/14--Decreased crew time to reflect adjusted setup, NBP measurement, and stow time based on data gathered from first 5 subjects. parcall000089Revision F43/44 & Subs 3/24/15Nominal: 17.92 Reserve: 17.92 Inc 43/44 Working PTP 2/27/15 Nominal: 17.92 Reserve: 17.92 Ops: - Body Measures Photo, Tape, Video Measurement (FD15, FD80, R-15 nominal; FD45, FD105, FD135 nominally reserve): 3.58 hrs/session. Nominal: Virts (41S I42 CDR): - 1 Body Measures photo-tape-video session (R-15). Yui (43S I44 FE5): - 2 Body Measures photo-tape-video sessions (FD15 and FD80). Lindgren (43S I44 FE6): - 2 Body Measures photo-tape-video sessions (FD15 and FD80). Reserve: Virts (41S I42 CDR): - 1 Body Measures photo-tape-video session (FD135). Yui (43S I44 FE5): - 2 Body Measures photo-tape-video sessions (FD45 and FD105). Lindgren (43S I44 FE6): - 2 Body Measures photo-tape-video sessions (FD45 and FD105). PPO Change Log *Crew Roll-up is not maintained real-time.

10 EO10-PPO-044 Revision G 9/21/15 PARC/T. Cassady Body Measures Change#RevisionIncDateCrew Roll-up* (hrs) PTP (hrs) Notes EO10-PPO-15- 035 Revision G45/46 & Subs 9/21/15Nominal: 7.17 Reserve: 0.00 Inc 45/46 Working PTP 8/14/15 Nominal: 7.17 Reserve: 7.17 Ops: - Body Measures Photo, Tape, Video Measurement (FD15, FD80, R-15): 3.58 hrs/session. Nominal: Lindgren (43S I45 FE6): - 2 Body Measures photo-tape-video sessions (FD80 and R-15). Reserve: - N/A PPO Change Log *Crew Roll-up is not maintained real-time.


Download ppt "EO10-PPO-044 Revision G 9/21/15 PARC/T. Cassady Body Measures 1:15 BODYM-NODE2-VID R5 :15 1:25 Crew Unattended :30 P/L-RSTRCT VID-CNFG TEXTFlexible :05."

Similar presentations


Ads by Google