1 Town of Taghkanic Highway Department Highway Facility Addition and Salt/Sand Storage
2
2 Potential Plan Overview u Facility History u Proposed Construction u Construction Costs u Financial Implications
3
3 Taghkanic Highway Department Existing Facility u Original land was transferred to the Town in early 1950’s, with the building being built shortly thereafter. (>50 years old), Now Approx. 2 acres u Current location is centrally located within the Town of Taghkanic. u Garage building has remained relatively unchanged for over thirty 30 years u All highway operations are performed from the current site. u Existing facility consists of the main garage facility (2000 sf), vehicle storage, on-site material storage and petroleum storage.
4
4
5
5
6
6
7
7
8
8
9
9
10
10
11
11 Highway Facility Options u THREE OPTIONS CONSIDERED BY THE TOWN u Stay in Existing Site uRenovate, expand existing facility uRaze existing building and build new facility uBuild new sand/salt storage facility u Construct a new facility new location uPurchase property uBuilding new facility uBuilding new sand/salt storage facility u Do Nothing
12
12 Stay at Existing Site and Renovate u Renovate existing building to improve working conditions, add additional space for vehicles and equipment, improve the exterior appearance. u Expand onto the rear of the existing building with a 2000 sf addition u Add one new additional garage bay (Approx. 1,300 S.F) at the existing facility located south of the building. u Install new sloped roof, and exterior siding to improve exterior appearance. u Repair/renovate existing building, including: new bathroom, Roof insulation, wall insulation. u Construct new 3,200 S.F. salt storage building. u Improve site stormwater management, and increase landscaping
13
Existing Site with Renovation 13
14
14
15
15 Stay at Existing Site and Build New Facility u Raze existing garage building facility u Relocate and reuse existing petroleum storage tanks. u Build new utility infrastructure for new garage (water, electrical service, septic system) u Build brand new garage building consisting of approximately 9,000 sf pre-engineered metal building, concrete slab, elect, heating, plumbing, etc. u Construct new stormwater management facilities. u Construct new 3,200 S.F. salt/sand storage building.
16
Existing Site with New Building 16
17
17 Construct New Facility at New Location u Locating, evaluating and purchasing property for new location. uTown has performed an outreach campaign regarding potential locations (+/- 25 properties). uTown has visited site and evaluated potential sites. u Construct new Highway Facility Garage. u Construct New Sand/Salt building. u Clean-up and potentially sell existing facility
18
Property Locations Evaluated 18
19
19 Sand/Salt Building Options u THREE OPTIONS CONSIDERED BY THE TOWN u Concrete and Wood Structure ($$$) uCast in place concrete walls with foundation uWood Post structure with wood trusses, and metal roof uAsphalt floor and exterior mixing pad u All Wood structure ($$) uWood post structure set on Concrete piers uWood Trusses, wood siding on sidewalls uAsphalt floor and exterior mixing pad u Canvas Structure ($) uCanvas cover on galv. Steel roof frame uPre-cast concrete block sidewalls uAsphalt floor and exterior mixing pad
20
Fabric Structure 20
21
All Wood Structure 21
22
Wood Structure on Concrete Walls 22
23
23 Potential Course of Action and Improvements u Stay at the existing site uHousekeeping of existing site uComply with NYSDEC requirements for soils issues uPerform Monroe Balancing of Interest Test uRenovate, upgrade and expand on existing building uApproach County regarding reconfiguration of County Route 27 and Pumpkin Hollow Road uConstruct fabric salt storage facility uInstall stormwater management system, and landscaping uContinue to utilize the existing storage shed
24
Preliminary Construction Costs 24
25
25 Fiscal Impact
26
Next Steps to Consider n Complete Phase 2 – Pollution Testing –Do additional testing in positive result area –Develop a Remediation Action Plan –Establish final pollution remediation costs –Establish impact on what can / cannot be done with the current site n Site Decision: –Eliminate all unsuitable sites –If there is an alternative site, establish scope and cost of a new facility n Compare costs of existing site upgrade + Salt Shed and new facility n Decide on site for Highway Facility n Establish several building scenarios and cost impact on budget and taxes –If the life of a Pole Barn Salt Shed costs less that the likelihood of two fabric sheds for the same period, perhaps it is better for the town to invest in the Pole Barn now – the immediate least cost solution is not always the best one in the long run. –If using current site, does it make sense to put up the extra bay on the existing building now? 26