Download presentation
Presentation is loading. Please wait.
Published byOlivia Hodge Modified over 8 years ago
1
Cyberinfrastructure Release 2 Production Readiness Review 12 December 2013
2
Wrap Up Review Success/Exit Criteria Actions Board Questions Board Comments
3
Success Criteria / Exit Criteria (from SEMP and CI System Life Cycle Plan) Have all of the blocker and major defects been corrected? Is the integrated and verified release mature and stable enough for deployment into a production environment? Is the integrated and verified release ready for PMO acceptance? Is there appropriate final documentation to inform and train the user and operations communities? Is the release ready to transition to operation?
4
Actions PMO and CI to review Dec 11 Load Test results and determine if there are any blocker or major bugs to be fixed Give the board until Dec 20 to review the PRR artifacts Post the Pathfinder report for the board
5
Board Comments and Questions
Similar presentations
© 2024 SlidePlayer.com. Inc.
All rights reserved.