Download presentation
Presentation is loading. Please wait.
Published byMadeline Rice Modified over 8 years ago
1
4/11/2014 LIU-SPS ABT review1 M.J. Barnes, L. Ducimetiere, T. Kramer, W. Weterings Acknowledgements: E. Carlier, G. Rumolo, B. Salvant, C. Zannini
2
Content Expected Issues Possible Upgrades Schedule Budget /Spending Profile Manpower/ Resources 4/11/2014 LIU-SPS ABT review2
3
Expected Heating Issue 4/11/2014 LIU-SPS ABT review3 *: C. Zannini and G. Rumolo, “Impedance model of the new MKE concept”, LIU-SPS Open 'C' Core MKE Extraction Kicker Review, 20/3/2013. **: M. Timmins, A. Bertarelli, J. Uythoven, E. Gaxiola, “SPS Extraction Kicker Magnet Cooling Design”, AB-Note-2004-005 BT (Rev.2) HV Plates Ferrite Silver painted stripes 80°C (measured with PT100s) [ΔT meas =60°C ] corresponds to the ferrite Curie temperature of ~125°C [ΔT actual =105°C]**. Example of estimating ΔT (ΔT est ) for HL-LHC: ΔT est = 33˚C*(105˚C/60˚C)*(1650W/1000W)=95˚C, and assuming a worst-case cooling water temperature of 28˚C T=123˚C. This is near the Curie temperature of 8C11/CMD5005 ferrite. 25ns data: measured temperature rise from 25-26 April 2012; 50ns data: measured temperature rise from 15-16 August 2012.
4
Ferrite Temperature MKEs are currently cooled with demineralised water (20-28˚C). Water cooling allows the MKE to operate with ~twice the beam induced power deposition (ref: AB-Note-2004-005 BT (Rev.2)). With the expected beam induced power deposition of 1.65kW/magnet for HL-LHC (with the present serigraphy), the estimated (actual) ferrite temperature is: ~125˚C for 25ns beam (corresponds to the Curie temperature); ~105˚C for 50ns beam (uncomfortably close to the Curie temperature). Mixed (12˚C) or chilled (6˚C) water would give a reasonable reduction (up to ~20˚C) in ferrite temperature. Back of the envelope calculations indicate that increasing the emissivity of the inside of the MKE tanks (as per the MKIs) could result in a significant radiated power (15-25%), further improving cooling of the ferrite – but current tanks could be radioactive, thus difficult to treat. Samples of CMD10 ferrite have been obtained for evaluation for possible future use in the MKIs: CMD10 has a Curie temperature of ~250˚C. The CMD10 samples have been tested and Oked by the vacuum team. CMD5005/CMD10/CN20, or a mix of some of these, could give a significant thermal operating margin, for the MKEs, for HL-LHC beam. Equivalent to 8C11 CMD10 also has a saturation flux- density (Bs) greater than CMD5005 but has a lower u’ (acceptable for MKIs, but needs to be checked for MKEs) 4/11/2014 LIU-SPS ABT review4
5
Ferrite Power Deposition 4/11/2014 LIU-SPS ABT review5 For given properties of the ferrite (permittivity and permeability [which are frequency dependent]), the length/overlap of the serigraphy determines the resonant frequency. Reducing the length of serigraphy from 200 mm to ~180 mm is expected to increase the resonant frequency from 44 MHz to 49 MHz, close to an optimum for 25 ns and 50 ns beams. The total power deposition is expected to be reduced from ~1650 W to ~850 W for 25 ns beam, and ~1150 W to ~820 W for 50 ns beam: 850 W 80˚C estimated with water @ 28˚C. Measurements (on a single cell or MKE magnet?) are required to confirm the predictions and hence the optimum length of serigraphy. Measurements on an S-type magnet would leave an L–type spare. 230 mm (length of ferrite block) 200 mm length (presently) Predicted power loss due to serigraphy peak as a function of frequency of the peak (σ=20 cm): 200 mm Courtesy of Carlo Zannini ~70% of total ~60% of total
6
4/11/2014 LIU-SPS ABT review6 25 ns Ecloud Studies (25/04/12-26/04/12) Ecloud is present in the MKEs with 25ns beam. Possibly coating the, aperture side, surface of the ferrites with Cr 2 O 3 or amorphous Carbon (aC) could eliminate Ecloud: this has not been tried at CERN. aC could suffer from high instantaneous power loss during pulsing, therefore Cr 2 O 3 may be a better option. Could/ should this be tested on an operational MKE or a dummy (retractable) MKE in the SPS?
7
4/11/2014 LIU-SPS ABT review7 Cost/Manpower: Chiller Chiller: Chiller (variable down to 6˚C) installed in tunnel, with a closed secondary cooling circuit; Disadvantage Condensation issues on magnet feedthroughs to consider (at low water temperatures); Advantages Magnets do not need to be rebuilt. Cost: approximate estimate of 40 kCHF per each of MKE4 and MKE6, including stainless-steel piping; Manpower: 6 person months for design and installation (parallel cooling circuits per extraction, where to put chiller, ….?) If optimized serigraphy is used, a chiller gives additional operating margin for ferrite heating (especially important if σ < 20 cm).
8
4/11/2014 LIU-SPS ABT review8 Cost/Manpower: Ferrite/Serigraphy New ferrite and/or new serigraphy: 10 MKE magnets (5 @ MKE4 [3L, 2S], 3 @ MKE6 [2L, 1S] & 2 spares [1L, 1S]) need to be rebuilt (if MKE4 is kept as per present): 2 less MKEs required for short-circuit configuration. ~3-4 months for bake-out of 10 magnets worth of ferrite to 1000˚C (probably not needed for change of serigraphy length); New ferrite: 231 kg/magnet 45 kCHF/magnet (estimate); Replace large vacuum seals of MKE tanks (~2 kCHF/magnet); Install 2 vacuum valves per magnet: 50 kCHF per magnet (allows vacuum to be broken in SPS ring without having to recondition all magnets) – expensive option…. Total person power for preparation and installation of 2 magnets (not inc. bake-out): With manual pulse conditioning: ~5.5-6 person months before TS + ~1 month in TS; With automatic pulse conditioning: ~4-4.5 person months before TS + ~1 month in TS. (manual conditioning: save ~3 weeks per magnet with automatic conditioning) Technical Stop (TS)
9
LS 4LS 5Run 5 LS2 starting in 2018 (July)=> 18 months + 3 months BC LS3LHC: starting in 2023 =>30 months + 3 months BC Injectors: in 2024=>13 months + 3 months BC LHC schedule beyond LS1 Beam commissioning (BC) Technical stop (TS) Shutdown Physics (Extended) Year End Technical Stop: (E)YETS Run 2Run 3LS 2 Run 2Run 3 LS 2 EYETS YETS F. Bordry: With only 1 L-type and 1 S-type spare: Only 2 MKEs can be swapped during a YETS (3 months) maybe 3 MKEs during EYETS; e.g. 2 MKE4s during Q1 2016, 3 MKE6s during Q1 2017, 2 MKE4s during Q1 2018, last MKE4 during LS2. With an extra L-type spare (but we do not have spare tanks….): 3 MKEs can be swapped during a YETS (3 months); e.g. all 3 MKE6s during Q1 2016, 3 MKE4s during Q1 2017, last 2 MKE4s during Q1 2018. 4/11/2014 LIU-SPS ABT review9
10
Budget breakdown The following assumes that MKE4 is kept as per present (5 terminated MKEs): 2 less MKEs are required for a short-circuit configuration. Total budget for new serigraphy: ~30 kCHF (including labour for removing end (~20mm) of present serigraphy, cleaning); Total manpower (FSU) for assembly and installation: ~50 kCHF (6 person months); Modify lifting device to reduce radiation exposure of personnel: ~5 kCHF; Total budget for new seals for vacuum tanks: ~20 kCHF; Estimated total budget for Cr 2 O 3 : ~20kCHF; Total budget for chiller system: ~80 kCHF (to be spent ~2018, depending on effectiveness of new serigraphy and/or desired thermal margin). Detailed breakdowns to be done. Total budget for new ferrite type is ~450 kCHF (expensive and not necessary if optimum serigraphy length reduces power deposition to ~850 W, as predicted). Total budget for 2 valves per tank is ~500 kCHF (expensive for gain !). 4/11/2014 LIU-SPS ABT review10
11
Spending per year in kCHF Year20132014201520162017201820192020Total 045302080?+3080?+125 Spending Profile for Rebuilding MKEs Cooling option in purple. 4/11/2014 LIU-SPS ABT review11 Following spending profile is: with new serigraphy, large seals for tank, coating of ferrite (e.g. with Cr 2 O 3 ) and new lifting device; without new ferrite, valves or dummy magnet; assumes that MKE4 is kept as per present (5 terminated MKEs). Notes: a)if MKE4 is reconfigured with 3 short-circuit magnets, a total (including spares) of 8 (instead of 10) MKEs are required. This would save ~20 kCHF by reducing the number of MKE4 magnets by two. b)if MKE4 is reconfigured with 3 short-circuit magnets, a 4 th MKE could be installed with 180 mm serigraphy and Cr 2 O 3 : installing sector valves around this MKE would cost ~100 kCHF.
12
Manpower/Resources For chiller system: 6 person months for design and installation. For rebuilding, testing etc. 10/8 magnets and installing 8/6 magnets: ~ 35/28 person months with manual conditioning; ~ 28/21 person months with automatic conditioning Up to 3 person months for new conditioning system for lab (+ some hardware). No detailed manpower planning available yet Conceivable that additional manpower is needed. Assembly area for magnet and generator will be 867 (within controlled zone). HV-Test cage for system testing is needed 2015 - 2019. 4/11/2014 LIU-SPS ABT review12
13
Conclusions Estimates presented for; Reducing length of serigraphy: measurements required (on at least 1 cell, and preferably a full [S-type?] magnet) for confirming impedance predictions; Painting aperture surface of ferrites with either aC or Cr 2 O 3 ; Using a chiller (gives additional safety margin, especially useful if bunch length < 20 cm); Replacing ferrite with a higher Curie Temperature version – expensive and probably not required; Vacuum valves – expensive. But cost estimates and manpower would be impacted by MKE4 configuration (terminated or short-circuit mode). 4/11/2014 LIU-SPS ABT review13
14
4/11/2014 LIU-SPS ABT review14
15
Reserve slides 4/11/2014 LIU-SPS ABT review15
16
Beam induced heating estimation 4/11/2014 LIU-SPS ABT review16 200 mm serigraphy Courtesy of Carlo Zannini
17
Beam induced heating estimation 4/11/2014 LIU-SPS ABT review17 200 mm serigraphy Courtesy of Carlo Zannini
18
Cooling test bench: ferrite temperatures at different probe positions Slide information from: SPS Extraction Kicker Magnet Cooling Design M. Timmins, A. Bertarelli, J. Uythoven, E. Gaxiola AB-Note-2004-005 BT (Rev.2) TS-Note-2004- 001 DEC (Rev. 2) 4/11/2014 LIU-SPS ABT review18
19
43˚C 28˚C 23˚C 25 April-26 April, 2012: 25 ns beam Ecloud studies 4/11/2014 LIU-SPS ABT review19 Courtesy of Carlo Zannini
20
We assume a bunch length of about 18 cm with the 25 ns beam at flat bottom 25 April-26 April, 2012: 25 ns beam Ecloud studies G. Papotti In very good agreement with the measured heating 4/11/2014 LIU-SPS ABT review20 Courtesy of Carlo Zannini
21
Ref: Glenn Vanbavinckhove, Open 'C' Core MKE Extraction Kicker Review, 20/3/2013. 4/11/2014 LIU-SPS ABT review21
22
Ref: Glenn Vanbavinckhove, Open 'C' Core MKE Extraction Kicker Review, 20/3/2013. 4/11/2014 LIU-SPS ABT review22
23
4/11/2014 LIU-SPS ABT review23 50 ns Normal Operation (15/08/12-16/08/12) Ecloud is not so obviously present for 50 ns beam.
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.