Download presentation
Presentation is loading. Please wait.
Published byNelson Dalton Modified over 8 years ago
1
JRA1 Status: PCMAG, Testbeam Infrastructure and Pixel Telescope Tobias Haas DESY/F1 27 August 2007
2
Tobias Haas: JRA1 Status This Talk JRA1 Organization and Planning JRA1 Organization and Planning Magnet Magnet Telescope Telescope Test beam campaigns Test beam campaigns Next steps Next steps Personnel Personnel
3
27 August 2007Tobias Haas: JRA1 Status JRA1 General Purpose Test beam infrastructure General Purpose Test beam infrastructure DESY Test beam DESY Test beam PCMAG PCMAG Pixel telescope Pixel telescope high precision (~ 1 µm even in a 6 GeV/c electron beam) high precision (~ 1 µm even in a 6 GeV/c electron beam) reasonably large area (~ 1 – 2 cm) reasonably large area (~ 1 – 2 cm) Fast readout (~1kHz frame rate) to handle higher rate environments Fast readout (~1kHz frame rate) to handle higher rate environments Staged Implementation Demonstrator telescope with slightly less precision and slower R/O (analog pixel sensor) Demonstrator telescope with slightly less precision and slower R/O (analog pixel sensor) Final telescope with high precision and high rate (pixel sensor with ADC and data reduction on chip Final telescope with high precision and high rate (pixel sensor with ADC and data reduction on chip
4
27 August 2007Tobias Haas: JRA1 Status Detailed planning constantly being iterated Current Planning 2006200720082009 now PCMAG @ DESY Demonstrator Integration Starts PCMAG Available Demonstrator Available Final Telescope Available PCMAG Field Mapping
5
27 August 2007Tobias Haas: JRA1 Status This Year 2007 JanFebMarAprMayJunJulAugSepOctNovDec Review Meeting Review Meeting Review Meeting Testbeam Meeting Testbeam Meeting DESY Test beam I DESY Test beam II CERN Test Beam I CERN Test Beam II With SILC PCMAG Field Mapping
6
27 August 2007Tobias Haas: JRA1 Status PCMAG Field Mapping July More details → Lucie Linssen
7
27 August 2007Tobias Haas: JRA1 Status Telescope sensors
8
27 August 2007Tobias Haas: JRA1 Status Test Beam Campaigns June 2007: DESY June 2007: DESY Commissioning, First beams Commissioning, First beams August 2007: DESY August 2007: DESY Full system, First results Full system, First results September 2007: SPS @ CERN September 2007: SPS @ CERN Demonstrate the performance: Demonstrate the performance: Speed Speed Precision Precision
9
27 August 2007Tobias Haas: JRA1 Status Sensors etc by IRES Mechanics/Cooling by DESY FE Boards by INFN DAQ by Geneva
10
27 August 2007Tobias Haas: JRA1 Status DESY Test beam I
11
27 August 2007Tobias Haas: JRA1 Status DESY Test beam I
12
27 August 2007Tobias Haas: JRA1 Status DESY Test beam II More details → Ingrid Gregor
13
27 August 2007Tobias Haas: JRA1 Status DESY Test beam II
14
27 August 2007Tobias Haas: JRA1 Status DESY Test beam II
15
27 August 2007Tobias Haas: JRA1 Status EU Personnel DESY: DESY: Need a replacement for Julia Fourletova, who has just left. Need a replacement for Julia Fourletova, who has just left. Geneva: Geneva: Emlyn Corrin Emlyn Corrin Bonn Bonn Lars Reuen, student Lars Reuen, student MPI MPI Stefan Rummel, student Stefan Rummel, student CERN CERN Jerome Alozy, student
16
27 August 2007Tobias Haas: JRA1 Status Other people DESY: DESY: Tatsiana Klimkovich (postdoc) will leave end September Tatsiana Klimkovich (postdoc) will leave end September Philipp Roloff (student) will work on data analysis Philipp Roloff (student) will work on data analysis Geneva Geneva Daniel Haas leaves Daniel Haas leaves INFN INFN Marcin Jastrzab (student) will work on FPGA programming Marcin Jastrzab (student) will work on FPGA programming Antonio Bulgheroni will go to Como and work on the software Antonio Bulgheroni will go to Como and work on the software
17
27 August 2007Tobias Haas: JRA1 Status Organizational T. Haas → steps down as JRA1 coor T. Haas → steps down as JRA1 coor Proposal: Proposal: I. Gregor takes over I. Gregor takes over 50k money for hw to be spent on various HW at DESY → Geneva 50k money for hw to be spent on various HW at DESY → Geneva Pay for parts of Daniel Haas to continue Pay for parts of Daniel Haas to continue SiLC has requested a common TB in October SiLC has requested a common TB in October Need to organize! Need to organize!
18
27 August 2007Tobias Haas: JRA1 Status Milestones/Deliverables ()() Next major milestone: Intermediate Digital Chip (MIMOSA 22+)
19
27 August 2007Tobias Haas: JRA1 Status Marc Winter
20
27 August 2007Tobias Haas: JRA1 Status Summary JRA1 is well on track JRA1 is well on track Various test beam campaigns successful Various test beam campaigns successful Demonstrator telescope basically ready Demonstrator telescope basically ready PCMAG Mapping done PCMAG Mapping done Next major milestones: Next major milestones: Intermediate digital chip (MIMOSA 22+) Intermediate digital chip (MIMOSA 22+)
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.