Download presentation
Presentation is loading. Please wait.
Published byZoe Martin Modified over 9 years ago
1
Marine Core Service MY OCEAN MyOcean PRR v1.0 System Validation WP2.1 MyOcean, Rome, 29th April 2011
2
Marine Core Service MyOcean V1.0 System Testing Process n System Integration (results presented at VARR V1.0) n System Verification (results presented at VARR V1.0) n System Integration and Verification Consolidation (between VARR V1.0 and PRR V1.0) ― Tests specification update (if necessary) ― Tests re-execution (includes failed tests) ― Tests execution (block/not run tests) n System Validation (results presented at PRR V1.0)
3
Marine Core Service System Verification Tests n WebPortal Functionalities Covered: –Product Information –Product Download Information (using download script) –Product Download MIS Gateway/MOTU (Subsetter Advanced Download) OPeNDAP –Product Request by e-mail
4
Marine Core Service n 390 Verification Tests Defined and Executed VARR V1.0 PRR V1.0 11 Failed System Verification Tests
5
Marine Core Service System Verification Tests
6
Marine Core Service System Verification Tests n Conclusions: –The V1 Stream 1 products are accessible through WebPortal –For each V1 Stream 1 product there is a product description –All V1 Stream 1 products are available for download (Subsetter Advanced Download, OPenDAP data and download script) –Some catalogue products are only available by e-mail request to Service Desk –The Catalogue Search functionality works properly
7
Marine Core Service System Validation Tests n The System Validation Scope is the HLRD scenarios (V1.0 System scope) n The System Validation covered the available MyOcean V1.0 functionalities for: –Guest User –Standard User (registered user)
8
Marine Core Service System Validation Tests Test DescriptionsMyOcean V1 Notes Search for ProductsPassed Visualizing Product InformationPassed Registering as MyOcean UserPassedThe user was available for download 5 days after the request (including a weekend). Requesting Product by E-mailPassedThe service desk answer was received 2.35 hours after the request. The download details are part of the signed SLA. Requesting Product (not included within SLA) by E-mailPassedAt this stage of the project it has been decided that all products will be available to all users even if not included in SLA. The product was available for download 22.5 hours after the request. Basic Product Download (by ftp)Passed Advanced Product DownloadPassed Product Download through ScriptPassed Unregistering as MyOcean UserPassed Failure of Upstream SystemPassed
9
Marine Core Service System Validation Tests n Conclusions: –The HLRD scenarios were partially covered (V1.0 System scope) –The catalogue search functionality works properly and is available to all users –For each product within the catalogue, associated product information is available to all users –The MyOcean users registering/unregistering works properly –The products are accessible only to MyOcean Users –MyOcean Service Desk handles properly e-mail requests MyOcean V1.0 is now considered as ready (from system perspective)
10
Marine Core Service MY OCEAN Thank you
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.