Download presentation
Presentation is loading. Please wait.
Published byDrusilla Watkins Modified over 9 years ago
1
Toroid Status Ben Freemire HPRF Wednesday Meeting 2/9/11
2
Pulser Diagram R1 = 1 kΩ R2 = 1 MΩ R3 = 50 Ω C1 = 0.001 µF V1 = 90.00 V 2/9/20112B. Freemire HPRF Wednesday Meeting
3
2/9/20113B. Freemire HPRF Wednesday Meeting 51 Ω 510 Ω 1 kΩ 51 Ω 510 Ω 1 kΩ 1 MΩ Scope Termination 50 Ω Scope Termination
4
Summary 2/9/20114B. Freemire HPRF Wednesday Meeting Toroid resistor (Ω)Pulser rise time (ns)Toroid rise time (ns)Pulser amp (V)Toroid amp (V)Current (A) 10006.3944.195750.480.075 7506.4513.2675.40.680.100533333 5106.3555.56675.41.080.147843137 3006.2025.02372.41.60.241333333 2006.0415.192702.080.35 1006.0875.00869.63.20.696 515.6969.7265.68.81.28627451 10000.41771.9337.50.20.0075 7500.70282.7127.520.2480.010026667 5100.71953.0857.480.360.014666667 3000.64054.9137.540.620.025133333 2000.67664.5357.540.860.0377 1000.73387.1357.520.075 510.49918.0747.523.080.14745098 1 MΩ Scope Termination, Top and Left 50 Ω Scope Termination, Bottom and Right
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.