Download presentation
Presentation is loading. Please wait.
Published byAgnes Singleton Modified over 8 years ago
1
ERV – Power John Dankanich Task: Provide power all power needed on Mars surface. Given: Electrical Power Requirement Heat Energy Requirement Find:Best Possible Power Source Cost Risk Mass Feasibility
2
Various Power Sources to Explore Generators Solar Fuel Cells Wind Nuclear Starting point: 100 kWe 2,000 kW heat energy (brick making)
3
Generators Advantages: Reliability (99%, Cold Start) Fuel in-situ Cost ($1000/kW) Disadvantages: Feasibility (power to generate fuel) Mass (3500 Kg)
4
Fuel Cells Advantages: Reliability Feasibility Disdvantages: Cost ($3000/kW) Fuel
5
Nuclear Advantages: Feasibility Mass (2,500 Kg) High Thermal Output Disadvantages: Political Radiation Reliability (or cost of testing)
6
Solar Advantages: Reliability (99.9%) mass (2 kg/ m 2 ) Disadvantages: Size (300 W/m 2 ) Cost ($1000/W) feasibility
7
Wind Advantages: Reliability (99%) Lifespan – 30 years Simple Expansion Disadvantages: Cost - Initially high ($1000/kW on Earth) mass (structure) feasibility
8
Analysis
9
Skills Computer Skills Autocad C Fortran Experience Physics 430, 431 – E&M Hall Effect Research
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.