1
ASAS Thematic Network II First Workshop Savoy Hotel, Malmö
2
Summary of discussions Progress DG TREN message Key issues Next workshop
3
Progress Standards Major manufacturers Simulations, trials & demonstrations
4
DG TREN message EC remains committed to ASAS Position ASAS into SESAME Master plan. Need to show benefit to achieve implementation – area for focus?
5
Key issues (1) ASAS is not stand alone - an integrated part of the ATM system The RFG process feeding into RTCA/EUROCAE and then into ICAO is happening Work from NUP & other programmes needs to be updated to reflect RFG outputs Validation: an integrated ATM element. SESAME should take into account RFG outputs.
6
Key issues (2) An ADS-B-OUT rich environment therefore: -NRA in Scandinavia, Ireland, Spain-Canaries and Mediterranean region should be operational as soon as possible. -ADS-B-IN in Pacific, in Atlantic -TMA Cost benefit studies should be used to drive common equipage Working towards implementation decision making
7
Key issues (3) Coherence needs to be achieved between the Airbus/Boeing common view & road map, and current ASAS work ATSAW: Situation Awareness is not an end in itself, the information must be directed at specific tasks Keep it simple AND make it work for the human operators Packages 2 & 3 coordinated research programme now!!
8
Workshop report development TN2 first report draft Available to attendees 14 th October Attendee comments by 28 th October Final report 18 th November Available with slides on www.asas-tn.orgwww.asas-tn.org
9
Date of next workshop Roma, 3-5 April 2006
10
Thank you European Commission LFV AerotechTelub The ASAS TN2 Team The Savoy hotel