AMS TIM & General Meeting TRD Integration Status Report Th. Kirn I. Phys. Institute B, RWTH Aachen Houston, 23rd October 2007.

Similar presentations


Presentation on theme: "AMS TIM & General Meeting TRD Integration Status Report Th. Kirn I. Phys. Institute B, RWTH Aachen Houston, 23rd October 2007."— Presentation transcript:

1 AMS TIM & General Meeting TRD Integration Status Report Th. Kirn I. Phys. Institute B, RWTH Aachen Houston, 23rd October 2007

2 TRD: Manifold and Tower Gas Tubing

3

4

5 TRD: Manifold and Tower Gas Tubing: Gas Tightness

6 TRD: Manifold and Tower Gas Tubing: Gas Tightness (Helium) He-dp/dt-Measurements of individual straw modules during production: q Wall 7 = 1.56*10 -2 l mbar/s q Wall 3 = 1.53 * 10 -2 l mbar/s → Safety Factor 8 for CO 2

7 TRD: Gas System – Manifold Gas Tubing

8

9 TRD: Flight Readout & HV Cabling

10

11

12

13

14

15 TRD: DAQ & Cosmic Test → Thorsten

16 TRD: DAQ & Cosmic Test

17 TRD: Delivery to CERN Oct. 24th