Download presentation
Presentation is loading. Please wait.
Published byBeryl Parker Modified over 9 years ago
1
IST 6th Call KAIV Subsystems and Microsystems European Commission DG INFSO E5 Brussels, January 16th, 2001 Gisele.Roesems@cec.eu.int
2
Subsystems and Microsystems Subsystem: Multi-component assembly with well-defined functionality and interfaces. It includes the basic hardware and the associated software. Subsystem: Multi-component assembly with well-defined functionality and interfaces. It includes the basic hardware and the associated software. Microsystem: Intelligent miniaturised system that combines sensing and/or actuating with processing functions. Microsystem: Intelligent miniaturised system that combines sensing and/or actuating with processing functions.
3
Types of Action RTD RTD Take-up measures Take-up measures –Trials –Best practice –Assessments –Access Actions Accompanying measures and Thematic networks Accompanying measures and Thematic networks
4
IST 6th Call KAIV Subsystems and Microsystems –IST 2001 - IV.7.2Microsystems –IST 2001 - IV.7.3Subsystems and Microsystems - take-up measures –IST 2001 - VIII.1.1 to VIII.1.9 Support activities –CPAs (1 and 5)
5
Take-up measures Trials: Trials: –adaptation and introduction of leading edge technologies in new products and processes and new design technologies or methods in existing design flows Best practice actions: Best practice actions: –take-up (first use) of mature and well established but insufficiently deployed methods & technologies to enhance existing products and systems Assessments: Assessments: –evaluation of advanced material and prototype equipment Access: Access: –facilitate access to innovative industrially offered technologies and services, competence and applied research
6
Bringing R&D into Use Bringing R&D into Use R&D: Feasibility of technology Proof of concepts R&D: Enhancement of capabilities Industrialisation Best Practice : First Use Access Actions: Foundries & Design centres R&D multidisciplinary competence Trials: Optimisation and validation Assessments : On-site analysis
7
Call 1-4 Results MST- and Subsystems RTD Subsystems4614131.0 30.50 Microsystems4613 87.5 22.14 RTD Subsystems4614131.0 30.50 Microsystems4613 87.5 22.14 Access actions4520 48.2 12.20 Access actions4520 48.2 12.20 Trials & first users2913 13.99 4.03 Trials & first users2913 13.99 4.03 Equipment assessment 7 5 6.15 4.16 Equipment assessment 7 5 6.15 4.16 Accompanying 5 3 3.35 1.29 measures Accompanying 5 3 3.35 1.29 measures TOTAL17868 290.19 74.32 TOTAL17868 290.19 74.32 (without CPAs, CRAFT, SME-EA) (without CPAs, CRAFT, SME-EA) Submittedacceptedfundingfunding for fundingrequest MEuroaccept. MEuro
8
Europractice MST - structure market, CAD packaging, test prototyping additional processes Network of subcontractors and additional partners Manufacturing cluster bulk surface thin film SOI optics + some other processes magnetic Competence Centres biomedical micro-optics & MOEMS microfluidics physical measurement systems microactuators micro-chemical medical instruments Research infrastructure network Contracted applied research Concept, feasibility studies Design groups Outside manufacturing (IMPACT)
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.