Presentation is loading. Please wait.

Presentation is loading. Please wait.

1 GEO Task US-09-01a XX SBA SBA: XX Analyst: Name, Organization Current Status of Report: (e.g., Final, awaiting AG or L. Friedl Input, Preparing Draft,

Similar presentations


Presentation on theme: "1 GEO Task US-09-01a XX SBA SBA: XX Analyst: Name, Organization Current Status of Report: (e.g., Final, awaiting AG or L. Friedl Input, Preparing Draft,"— Presentation transcript:

1 1 GEO Task US-09-01a XX SBA SBA: XX Analyst: Name, Organization Current Status of Report: (e.g., Final, awaiting AG or L. Friedl Input, Preparing Draft, etc.) Date Final Report will be completed (if not already):

2 Sub-Areas Analyzed List sub-areas chosen for analysis: 2

3 Prioritization Methodology Describe methodology used to prioritize parameters, both within sub-areas (if applicable) and in Chapter 5 (overall): 3

4 Analyst Feedback on Methodology List pro’s and con’s of prioritization methodology. Is the prioritization methodology broadly applicable (e.g., for other SBAs or the cross-SBA analysis), or specific to your SBA? Would you recommend this methodology for other US-09-01 reports in the future? (either as is, or in a modified form?) 4

5 Priorities Identified Number of priority parameters identified: List parameters from Chapter 5, and note whether they are in priority order, no order, tiered lists, etc. (use 2 nd slide as needed): 5

6 Interpretation of Results Note any “themes” that emerged, surprising or expected conclusions, considerations for incorporating results into Cross- SBA Analysis. 6

7 Limitations/ Caveats Additional notes about interpretation of priority results – i.e., inherent biases, gaps, overlaps with other SBA reports, etc. 7


Download ppt "1 GEO Task US-09-01a XX SBA SBA: XX Analyst: Name, Organization Current Status of Report: (e.g., Final, awaiting AG or L. Friedl Input, Preparing Draft,"

Similar presentations


Ads by Google