H4IRRAD 2012 M. Calviani (EN/STI) for H4IRRAD team
2
2012 PS/SPS schedule 2 First version of the 2012 PS/SPS schedule has been released (link) subject to slight change in dateslink 3 slots (total 48 days) 14 th May + 20 days, 3 rd August + 14 days, 19 th November +14 days 6th March 2012M. Calviani - RadWG - H4IRRAD 2012
3
1 st slot 36th March 2012M. Calviani - RadWG - H4IRRAD 2012 XWCA electronics, permanent or parasitic (this RadWG)? CMS parasitic testing … definition of tests (both?) Move CLIC actuator tests from 2 nd slot?
4
2 nd slot 46th March 2012M. Calviani - RadWG - H4IRRAD 2012 EN/ICE Schneider PLC test? Low intensity? Possible to move the PLC remote I/O test from the 3 rd slot to this 2 nd ? CLIC actuators also for the 2 nd slot? SPS/BPM tests confirmed?
5
3 rd slot 56th March 2012M. Calviani - RadWG - H4IRRAD 2012 EN/EL equipment – definition of equipment to be tested (and of the needed services) EN/ICE Siemens PLC test confirmed? Other AOB and request from RadWG
6
Comments 6 Beam intensity possibly increase by factor of 3x ~1*10 11 HEH/cm 2 /slot internal (e.g. PC 60A) ~3*10 10 HEH/cm 2 /slot external (e.g. PC 2kA) There might be additional constraints in terms of RP (target activation) so the tests should be extremely well organized www.cern.ch/h4irrad, h4irrad-users@cern.ch e-group www.cern.ch/h4irradh4irrad-users@cern.ch 6th March 2012M. Calviani - RadWG - H4IRRAD 2012