Download presentation
Presentation is loading. Please wait.
Published byCurtis Boone Modified over 9 years ago
1
A Post-Processor for Hydrologic Ensemble Forecasts John Schaake, 1 Robert Hartman, 2 James Brown, 1 D.J. Seo 1, and Satish Regonda 1 1. NOAA/NWS Office of Hydrologic Development 2. NOAA/NWS California-Nevada River Forecast Center Presentation to European Geosciences Union April 17, 2008 Vienna
2
Elements of a Hydrologic Ensemble Prediction System Ensemble Pre- Processor Parametric Uncertainty Processor Data Assimilator Ensemble Post- Processor Hydrology & Water Resources Ensemble Product Generator Hydrology & Water Resources Models QPF, QTFQPE, QTE, Soil Moisture Streamflow Ensemble Verification System Fig 1 Ensemble Product Post-Processor
5
CNRFC Ensemble Prototype Smith River Salmon RiverMad River Navarro River American River (11 basins) Van Duzen River
6
NFDC1 – March 15 30-day Post-Processor Calibration Analysis of Historical Model Simulation Results
7
NFDC1 – March 15 30-day GFS-Based Hydrologic Ensemble Forecasts Ensemble Mean vs ObservedCumulative Rank Histograms
8
NFDC1 – March 15 Forecasts Cumulative Rank Histograms for Different Forecast Products
9
LAMC1 (Lake Mendocino, CA) Russian River Basin
10
l Total Area 3465 km2. l Elevation 17m - 1245m. l 2 Flood Control Reservoirs l 3 Local Areas. l 3 Official Flood Forecast Points. l Floods Nearly Every Year. l 3 Major Floods in Past 40 Years. Russian River
11
LAMC1 – Schematic of Possible Post Processor Applications Basin Model Of Natural Flow Post-Processor To Adjust to Observed Inflow Reservoir Operations Model Post-Processor To Adjust to Observed Outflow Gaged Outflow COE Estimated Inflow Diversion from Eel Basin Estimated Natural Flow
12
Full Natural Flow – March 15 Analysis of Historical Model Simulation Results
13
Full Natural Flow to Inflow – March 15 Analysis of Historical Model Simulation Results
14
Climatologies of Measured Inflow and Modeled Natural Flow (December – June)
15
Full Natural Inflow to Resevoir Outflow - March 15 Analysis of Historical Model Simulation Results
16
GLDA3 (Lake Powell Inflow) EPG Post-Processor Calibration Results
17
June Calibration – Lake Powell Analysis of Historical Model Simulation Results
18
July Calibration – Lake Powell Analysis of Historical Model Simulation Results
19
Some Challenges Alternative ways to evaluate Post-Processor integral equation to relax bivariate normality assumption that I used to get started? Can we adjust individual ESP traces (preserving temporal scale-dependent uncertainty) by using a cascade approach to apply multiple window applications of the product-based postprocessor? Multi-model applications?
20
Thank You
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.