Presentation is loading. Please wait.

Presentation is loading. Please wait.

Status: Draft Status report for revision of ISO 13628-6 (API 17F) Summer meeting Washington June 2010.

Similar presentations


Presentation on theme: "Status: Draft Status report for revision of ISO 13628-6 (API 17F) Summer meeting Washington June 2010."— Presentation transcript:

1 Status: Draft Status report for revision of ISO 13628-6 (API 17F) Summer meeting Washington June 2010

2 Status: Draft Target The task groups (API and ISO) have an ambition of submitting an issue (DIS) for comments within end of 2009 (statement from Denver meeting) The task has been more comprehensive than first anticipated. The ambition now is to finalise the technical content within October 2010.

3 Status: Draft Table of content to be as existing standard System requirements Surface equipment Subsea equipment Interfaces Materials and fabrication Quality Testing Marking, packaging, storage and shipping

4 Status: Draft Modifications General revision of text in document Pressure definitions improved/clarified Software development requirements included Subsea processing covered Horizontal integration covered Statement related to SIL included Cleanliness requirements revised Annex C updated Annex E revised Annex F revised Annex G revised Annex H revised EMC requirements will be revised

5 Status: Draft ISO task group meetings Kick off meeting in Oslo Norway October 2008 Celle Germany February 2009 Copenhagen Denmark June 2009 London UK October 2009 Asker Norway February 2010 Bristol UK May 2010 Next (and last) meeting is planned in Aberdeen September 2010

6 Status: Draft API working group meetings January 2009 June 2009 January 2010 May 2010

7 Status: Draft ISO task group participants Project leader Roald Loug Hansen, StatoilHydro, Norway, roloha@statoilhydro.com Members Paul Thomas, Aker Solutions, UK, paul.thomas@akersolutions.com Bruce Scott, Halliburton,, Bruce.Scott@Halliburton.com Cristopher Curran, BP, USA, Christopher.Curran@bp.com Frederico Nicoletti, Subsea 7, Brazil, frederico.nicoletti@subsea7.com Gerhard Wilche, Cameron, Germany, gerhard.wilcke@c-a-m.com Ian Kent, GE, UK, ian.kent@ge.com Jesper Jacobsen, Dong Energy, Denmark, jesja2@dongenergy.com John Bodine, Chevron, USA, john.bodine@chevron.com Ken Ellis, SES,, ken.ellis@subseaengineeringsolutions.com Mike Theobald, Maersk Oil, Denmark, Mike.Theobald@uk.bp.com Stefan Knepper, Cameron, Germany, stefan.knepper@c-a-m.com Svein Lilleland, FMC, Norway, Svein.Lilleland@fks.fmcti.com Sverre Corneliussen, FMC, Norway, Sverre.Corneliussen@fks.fmcti.com Trond Bertmand, StatoilHydro, Norway, trbert@statoilhydro.com Werner Menz, Cameron, Germany, menzw@camerondiv.commenzw@camerondiv.com David Saul, BP, UK, Jens-Henrik Neuenkirchen, StatoilHydro, Norway, jhn@statoilhydro.com

8 Status: Draft API 17F working group – Christopher Curran, BP – Brian Skeels, FMC – David Lansbury, FMC – Jay Hursh, Aker Solutions – John Allen, GE Vetco – John Simon, Shell – Mike Brashear, Chevron – Lee Mitchell, Chevron – Richard Barratt, GE Vetco – Don Schlater, BP – Jim Metzinger, Technip – Butch Taggart, Murphy – Al Williams, Dril-Quip – Don Ogwude, CSI – Jose D Baca ExxonMobil – Lon Ngo, Dril-Quip – Mark Marsalis, Dril-Quip – Ryan Chladek, ExxonMobil


Download ppt "Status: Draft Status report for revision of ISO 13628-6 (API 17F) Summer meeting Washington June 2010."

Similar presentations


Ads by Google