© «Samruk-Green Energy» LLP BRIEF COMPANY OVERVIEW March 2013 info@samruk-green.kz www.samruk-green.kz «Samruk-Green Energy» LLP Bagdat Oral Project Manager b.oral@samruk-green.kz
2
© «Samruk-Green Energy» LLP Company profile 2 Company was established in January 25, 2012 (Astana, Kazakhstan) Mission - is a reliable and high-quality supply with electric power produced from renewable energy sources. Vision - is the Company’s formation as a leader in the field of renewable energy sector in Kazakhstan. 100 % subsidiary company of «Samruk-Energy» JSC, a national power company (www.samruk-energy.kz )www.samruk-energy.kz
3
© «Samruk-Green Energy» LLP Parent company information 3 “Samruk-Energy” JSC was established on 18th April 2007 and officially registered on 10th May 2007; 100% of equity is fully owned by “Sovereign Wealth Fund “Samruk-Kazyna” JSC; The group incorporates 22 entities and is a vertically integrated electricity provider, operating within the borders of Kazakhstan. Its key focus areas are: Generation of electric and thermal power (71% thermal energy and 29% hydro energy) Transmission and distribution of electric power Supply Coal mining Reconstruction, expansion and construction of power generating facilities and units “Samruk-Energy” JSC controls 40% of the electricity generation in Kazakhstan and is strategically important for the national economy.
4
© «Samruk-Green Energy» LLP Main activities 4 WIND BIOMASS SOLAR CURRENT PROHECTS IN PERSPECTIVE GEOTHERMAL ASSEMBLY AND PRODUCTION OF SMALL SCALE WIND TURBINES GARBAGE UTILISTAION WITH ELECTRICITY PRODUCTION SMALL SCALE HYDRO POWER
5
© «Samruk-Green Energy» LLP Current projects 5 №PROJECT TITLECAPACITY, MW 1Wind farm in the Shelek corridor, Almaty Region.60/300 2Wind farm in Yereimentau city, Akmola Region50/300 3 Solar Power Plant in Kapshagai city, Almaty Province. 2 4 Solar Power Plant within the framework of the Agreement between the Governments of Kazakhstan and China 1 5 Wind Power Plant within the framework of the Agreement between the Governments of Kazakhstan and China 5
6
© «Samruk-Green Energy» LLP Projects related to the acquisition of assets and JVs’ establishment 6 №PROJECT TITLECAPACITY, MW 1Construction of small scale hydro power plant “Bartogai 27” 13 2Construction of small scale hydro power plant “Bartogai 28” 20 3Establishment of a Joint Venture (with KD Stahl- und Maschinenbau GmbH, Germany) on production of small scale wind turbines - 4Establishment of a Joint Venture on assembly of products with light-emitting diodes - 5Establishment of a joint venture (with Office Privée, United Kingdom) on construction of the power plant using straw in energy production 5-10
7
© «Samruk-Green Energy» LLP Construction of 60 MW capacity WPP in Shelek with the perspective of expansion up to 300 MW 7 Period of realization 2011-2016 Number of workplaces During the operation – 12 Completed actions: Feasibility study of the Project is completed (December 2012); Land plot is allocated; A scheme of electric power distribution is developed and agreed. Technical specification for grid connection is obtained. Planned activities Obtaining the State expertise’s approval
8
© «Samruk-Green Energy» LLP 8 Period of realization 2011-2016 Number of workplaces During the operation – 10 Completed actions: Feasibility study of the Project is completed. State expertise approval is obtained. A scheme of electric power distribution is developed and agreed. Planned activities Approve the feasibility study and the tariff in Ministry of Industry and New Technologies Organization of financing Construction of 50 MW WPP with the perspective of expansion up to 300 MW
9
© «Samruk-Green Energy» LLP 9 Period of realization 2011-2013 Number of workplaces During the operation – 5 Completed actions: Feasibility study of the Project is completed. State expertise approval is obtained. A land plot is allocated. A scheme of electric power distribution is developed and agreed. Construction of the SPP has started Planned activities Commissioning of the plant and obtaining the State acceptance committee Act Construction of 2 MW capacity SPP in Kapshagai city
10
© «Samruk-Green Energy» LLP Hydro power plant projects on Bartogai 10 Completed actions: Investment-Innovation Council of «Samruk-Energy» JSC has approved the realization of pre-investment stage of the Project by acquisition of the share capital of “Zharyk Su Ltd” LLP; The obtaining of land plots (2 and 3.1 hectares) for construction have been approved; The contract for water use has been signed; Technical review of the technical-economical analysis of the project is carried out; Planned activities Acquiring the interest in the share capital of Project Company when the due diligence is completed;
11
© ТОО «Samruk-Green Energy» Using straw in electrical energy production 1 Completed actions: Investment-Innovation Council of "Samruk-Energy“ JSC has approved the implementation of pre-investment stage of the Project; Social-entrepreneurial corporation «Essil» has chosen 2 land plots in Akmola region of construction of plant; Social-entrepreneurial corporation «Essil» has chosen potential suppliers of fuel; Planned activities Project feasibility study development.
12
© «Samruk-Green Energy» LLP Assembly and production of small scale wind turbines 1212 Completed actions: «Samruk-Green Energy» LLP and KD Stahl- und Maschinenbau GmbH has signed the Memorandum of cooperation; Agreement of intent on possible sale of products with the "KazAgroFinance“ JSC is signed; Planned activities Signing the Framework agreement on establishment of a joint venture; Project Feasibility study development.
13
© «Samruk-Green Energy» LLP Perspective projects 1313 «Samruk – Energy» JSC and «Samruk-Green Energy» LLP are considering the possibility of developing following new projects: 1.Expansion of Kapshagay solar power plant up to 100 MW; 2.Construction of 45 MW Solar\Hydro mix station; 3.Construction of 300 MW solar power plant in the South Kazakhstan region.