2 Vision “To be a world-class electricity transmission company and the leading inter-connector in Africa.” The objectives of our projects are to: i.Evacuate electricity from generating stations ii.Reinforce the grid network for increased capacity, reliability and provide redundancy iii.Interconnect with neighbouring countries Currently undertaking construction of 3,793km and 53 substations. Feasibility study 20lines

3 Engineering, Procurement & Construction (EPC) contracts Engineering, Procurement & Construction + Financing (EPC+F) contracts Consultancy Services As IPP Generators with KETRACO evacuating power Capacity Building 3

4 4 LOIYANGALANI – SUSWA LINE Scope: 428km, 400kV double circuit line and 400/220kV substations at Loiyangalani and Suswa Contractor: Isolux Estimated Cost: Euro 143million (Transmission Line) Financier: Spain and GoK Commencement: Jan 2014 and Completion: Dec 2015 Purpose: To evacuate 300 MW from Lake Turkana Wind Plant

5 5 220kV Nairobi Ring & Associated Substation Scope: 100km, 400kV double circuit line and substations at Ngong, Isinya, Athi River and Koma Rock Contractor: Iberdrola Estimated Cost: Euro 45million (Substations) Financier: AFD, EIB & GOK Commencement: Mar 2013 and Completion: Sep 2014 Purpose: To Increase transfer capacity and increase power reliability

6 6 LESSOS – TORORO LINE Scope: 132km, 400kV double circuit line and substation works at Lessos Contractor: Inabensa Estimated Cost: Euro 33million Financier: AfDB & GOK Commencement: Sep 2013 and Completion: June 2015 Purpose: The project will increase the power transfer capacity between Kenya and Uganda.

7 7 Olkaria – Lessos - Kisumu Scope: 300km, 400/220kV double circuit line and substation works at Olkaria, Lessos, New Kisumu and Mamba Leo Financier: JICA & GOK Prequalification Commencement: Jan/Feb 2014

8 8 Kenya – Tanzania Interconnector Scope: 100km, 400kV double circuit line and substation works at Isinya (Kenya portion) Financier: JICA & GOK Prequalification Commencement: Jun 2014

9 9 Dongo Kundu – Mariakani line Scope: 50km, 400kV double circuit line and substation works at Dongo Kundu & Mariakani Purpose: The line will evacuate 700-800MW from the LNG/CNG power plant in Dongo Kundu Time Line: June 2015

10 10 Lamu – Kitui – Nairobi East line Scope: 520km, 400kV double circuit line and substation works at Lamu, Kitui & Nairobi East Purpose: The line will evacuate 1000MW from Lamu Coal power plant and 1000MW Kitui coal power plant. Time Line: Dec 2016

11 11 Menengai – Rongai line Scope: 32km, 400kV double circuit line and substation works at Menengai* & Rongai Financier: World Bank Purpose: The line will evacuate 400MW from Menengai geothermal power plant. Time Line: June 2016

12 12 Silali – Rongai line Scope: 150km, 400kV double circuit line and substation works at Silali* & Rongai Purpose: The line will evacuate 220MW from Soilo geothermal power plant (1 st Phase). Time Line: June 2016

13 13 Lamu – Kitui – Nairobi East line Dongo Kundu – Mariakani line Scope: 4 lots EPC Transmission line and 2 lots for EPC Substations Bid submission Date Time Line: 15 th January 2014

14 14 Solar Potential Areas Wind Potential Areas Geothermal Potential Areas The planned transmission network upto 2017 is as follows-: 612km 500kV HVDC Project 1,880 km 400kV Projects 2,135km 220kV Projects 2,587km 132kV Projects

15 THANK YOU 15


Download ppt "SEMINAR ON ENERGY: ELECTRICITY TRANSMISSION A presentation to the KENYA – SPAIN MULTILATERAL PARTNERSHIP MEETING By Dr. (Eng.) John M. Mativo Chief Manager."

Similar presentations


Ads by Google