Martian Regolith Crushing Formal Status Update One Members: Nick Sestito & Christopher Graham
2
Overall Project Objective Develop a Martian Regolith Crusher That will: Crush a solidified Martian regolith permafrost-mix Aid in the process of extracting water for a theoretical manned Martian colony Create an optimal output product for a minimal heating power requirement
3
Current Project State What has been done? Crusher input Justification Material/Crushing Criteria Dimensional Cube Designation What are we in the middle of? Designating an optimal output regolith size created by the crusher Suggesting a water/regolith filtration process thermodynamic and heat transfer problem Where will this lead us? Designing/Improving previous semester crusher Determine an overall Crushing mechanism Determine whether a grinder will need to be added to the process
4
What has been done? Selecting a material for the input regolith simulant Set the criteria to the worst cast scenario: Failure Strength: Regolith/ice/salt mix < Seawater Ice < Fresh water ice Criteria: Pure Freshwater ice Mechanical property data is readily available
5
Justify dimensioning for the crushing input Initial requirement: 1 cubic meter of regolith per Martian day (sol) Pervious semester’s publication proposal: Cutting a cubic liter sized grid 10cm deep into Martian permafrost/icy veins Leaving a grid of cantilever beams Need 500 cubes hauled and crushed per sol What has been done?
6
Justifying dimensioning for the crushing input Current regolith excavating prototype basis Lysander and Cratos excavators Dust Pan Sweepers Strictly a power requirement basis Give an idea of: Cubes hauled/sol Excavating process suggestion What has been done?
7
What are we in the middle of? Developing an optimal product size for the crusher output Minimize oven heating power requirement Powering necessity: Crusher <<< Heater
8
The Heating Apparatus: Assume hot CO2 gas heating RAPID-L reactor specifications Maximum radiator temperature Establish a max CO2 Assume t=500 K What are we in the middle of?
10
Estimate total heating requirement (200 K regolith heated to 400 K, latent heat of vaporization for water extraction) Estimate HTC to each particle based on diameter and CO2 velocity Convert permafrost collection rate number particle/time unit Estimate the time required for the feedstock particles to be heated from 200 K to 400 K What are we in the middle of?
11
Heat Transfer and Thermodynamic problem: Find optimal pressure to run system in Satisfy oven CO2 density and put water phase change above triple point Forced convection on a falling particle Most effective Heat Transfer Coefficient for particles Lump system analysis Uniform temperature change with varying time Particles are small enough Designate: Heating pipe diameter and height CO2 temperature and velocity Filtration system of regolith, CO2 and condensate What are we in the middle of?
12
Where will this lead us? Once an input and output has been determined and justified: The geometry of the crusher has been determined What type of Crusher? A crusher and Grinder combination process? Overall allow us to begin designing/improving a regolith crusher
13
Where will this lead us? Input Size Thermal Model (Thermo & Heat Transfer Problem) Output Size Force Orientation/Requirement Fracture Strength (Strength of Materials Problem) Crusher Type/Geometry (Design Problem) Power Required for Crusher Function (Design Problem) Test and Improve