Presentation is loading. Please wait.

Presentation is loading. Please wait.

1 NIFIED MULTI-PURPOSE ID SYSTEM (E.O. 420) U U National Economic and Development Authority UPDATES.

Similar presentations


Presentation on theme: "1 NIFIED MULTI-PURPOSE ID SYSTEM (E.O. 420) U U National Economic and Development Authority UPDATES."— Presentation transcript:

1 1 NIFIED MULTI-PURPOSE ID SYSTEM (E.O. 420) U U National Economic and Development Authority UPDATES

2 2 1.EO 420 issued 2.Date of publication (Mla Times and Daily Tribune) 3. Effectivity of EO 420 (15 days from publication) 4.IRR issuance (within 60 days from effectivity of EO 420) K ey Implementation Milestones ActivityTCD April 13, 2005 April 26, 2005 May 11, 2005 NLT July 12, 2005

3 3 K ey Implementation Milestones ActivityTCD 5. CRN design (format, algorithm) June 6, 2005 6. GSIS and SSS ID records preparation/clean-up for CRN assignment June 30, 2005 7. NSO generates/assigns CRN to SSS and/or GSIS as pilot agencies July 7, 2005

4 4 I mplementation Status 1.E.O. 420 already published in 2 newspapers of general circulation 2.Draft guidelines implementing EO 420 now being prepared; draft outline as presented by NSO already reviewed/approved by TWG last May 3, 2005 3.GSIS and SSS biometrics data matching to clean up members data bases already arranged to jumpstart use of CRN

5 5 I mplementation Status 4.Met with CSC chairman, DBM secretary and agreed to phase in CSC Personnel Information System (CSC-PIS) with EO 420 thru the use of CRN as a unique identifier for government personnel 5. Draft NEDA memo order creating a National Task Force to Implement the Unified ID System in Government (NTF- UIDS) sent to proposed members for review/consideration

6 6 I mplementation Status 6.Prepared EO 420 Primer and published in NEDA Web portal/distributed to major newspapers 7. Created “Updates on EO 420” page in NEDA Web portal, which includes a copy of EO 420; the DG’s powerpoint presentation on the EO; copy of EO 420 primer; and latest updates/developments on the implementation of the EO

7 7 I mplementation Status

8 8

9 9 8.Made exploratory talks with PhilHealth on the possible phasing in of the Unified ID System per EO 420, with the PhilHealth ID card system, including possible use of PhilHealth’s extensive network infrastructure

10 10 P etitions Filed with the SC 1. Two (2) complaints have been filed with the Supreme Court against E.O. 420: (a) filed by the KMU and NAFLU-KMU received May 11, 2005 (b) filed by Bayan Muna, received May 24, 2005 2. Dir. Abrenilla, AD Reyes and Atty. Dacayo met with the OSG; background documents/information, rationale, key features of EO 420 already supplied to the OSG.

11 11 S tatus of Petitions Filed with the SC 3.The SC is expected to consolidate the two complaints and issue an order requesting comments on the complaints The SolGen will submit the government’s response 10 days after receipt of the SC order

12 12 Thank you


Download ppt "1 NIFIED MULTI-PURPOSE ID SYSTEM (E.O. 420) U U National Economic and Development Authority UPDATES."

Similar presentations


Ads by Google