March 26, 20131 Monitoring Results Annual and Quarterly Review April 2012 – January 2013 MUN POTW Sacramento Valley Archetype Westside: Willows, Colusa.

Similar presentations


Presentation on theme: "March 26, 20131 Monitoring Results Annual and Quarterly Review April 2012 – January 2013 MUN POTW Sacramento Valley Archetype Westside: Willows, Colusa."— Presentation transcript:

1 March 26, 20131 Monitoring Results Annual and Quarterly Review April 2012 – January 2013 MUN POTW Sacramento Valley Archetype Westside: Willows, Colusa Eastside: Biggs, Live Oak Calvin Yang

2 Outline First year of monitoring  Key observations of all data through Jan 2013 Storm Season/3 rd Quarter Observations Summary Proposed Monitoring for Apr – Sept 2013 March 26, 2013 2

3 3

4 Monitoring Overview April 2012 – January 2013 Nitrate exceedanes in Colusa, Live Oak, and Willows’ Effluent  Does not continue downstream Ammonia exceedances in Biggs’ Effluent  Does not continue downstream Sodium exceedances in almost all samples Total Al, Fe, Mn only upstream and downstream of POTW effluent March 26, 2013 4

5 Monitoring Overview April 2012 – January 2013 Majority of arsenic surrounding Live Oak and in effluent Trihalomethanes only in Willows effluent, but not downstream Boron exceedances upstream of Colusa Still reviewing E. coli results March 26, 2013 5

6 6

7 Storm Season Observations October thru January 2012 Water levels generally increased during December 2012 sampling event Most exceedance consistent with previous results except as follows:  No Total As and Nitrate exceedances in Lateral #2 during Dec 2012  No Nitrate exceedances in Unnamed Tributary during Nov – Dec 2012  New Total Fluoride and Sulfate exceedances in Colusa sample sites except Colusa’s Effluent March 26, 2013 7

8 Unnamed Tributary Downstream of Colusa Effluent March 26, 20138 Oct 09Dec 26 Jan 29

9 C Main Drain Downstream of Biggs Effluent March 26, 20139 Oct 30Dec 27 Jan 30

10 Logan Creek Downstream of Willows Effluent March 26, 201310 Oct 25 Dec 26 Jan 29

11 October 2012 thru January 2013 Monthly Samples March 26, 201311

12 October 2012 thru January 2013 Quarterly Samples March 26, 201312

13 Colusa Exceedances (October 2012 – January 2013) March 26, 201313

14 Willows Exceedances (October 2012 – January 2013) March 26, 201314

15 Live Oak Exceedances (October 2012 – January 2013) March 26, 201315

16 Biggs Exceedances (October 2012 – January 2013) March 26, 2013 16

17 17 West Side – Specific Conductance (October 2012 – January 2013) March 26, 2013

18 East Side – Specific Conductance (October 2012 – January 2013) 18March 26, 2013

19 West Side – Nitrate as Nitrogen (October 2012 – January 2013) March 26, 2013 19

20 East Side – Nitrate as Nitrogen (October 2012 – January 2013) March 26, 201320

21 Summary of Exceedances (October 2012 – January 2013) March 26, 201321

22 Summary of All Exceedances (April 2012 – January 2013) March 26, 201322

23 Proposed Monitoring for Apr ‘13 – Sept ‘13 Continue field sampling twice per month (variability in conductivity) Continue existing constituents with following adjustments:  Stop sampling Nitrate at Biggs sample sites.  Stop sampling Boron at Biggs, Live Oak, Willows sample sites.  Change Total Fluoride sampling to monthly for Colusa sample sites only.  Resume Total and Dissolved Arsenic sampling for all sites. March 26, 2013 23

24 Estimated BSK Lab Budget March 26, 2013 24


Download ppt "March 26, 20131 Monitoring Results Annual and Quarterly Review April 2012 – January 2013 MUN POTW Sacramento Valley Archetype Westside: Willows, Colusa."