UK X-FEL National Laboratory Perspective Susan Smith STFC ASTeC IoP PAB/STFC Workshop Towards a UK XFEL 16 th February 2016
2
Content Overview STFC national labs capabilities FEL R&D Underpinning accelerator research facilities Accelerator engineering and delivery FEL R&D in the Context of a UK-XFEL Summary
3
What we deliver Provide access to world leading, large scientific facilities for UK researchers Foster academic and industry collaboration at Sci-Tech Daresbury and Harwell Science & Innovation Campuses
4
STFC Technology Strengths o Engineering Technology Centres based at Harwell and Daresbury Science and Innovation Campuses. o Facilitates collaborative efforts. Developing and delivering innovative technologies in STFC laboratories and in collaboration with University groups. Key Technology Strengths o Accelerator Technologies o Optics and Lasers o Instrumentation o Data Acquisition and Processing Systems o Detectors and Sensors o Microelectronics Design o High Performance Computing
5
ASTeC Goal Enable world leading scientific research Develop existing and future accelerator facilities for high-energy physics colliders and intense particle beams, along with next-generation neutron and photon facilities. Engage with both the UK academic community and leading international partners via European Framework programmes and MoUs. Maximise our impact (Industry and Grand Challenge areas) Driven by, the strategic plans and priorities of STFC and other appropriate UK research councils Core accelerator R&D capabilities, complementing national facilities expertise
6
Controls Engineering Electrical Engineering Design Engineering Mechanical Engineering Instrumentation Technical services (Vac, survey.....) ASTeC Intense Beams Simulations and design RF & Cryogenic Systems Development of RF, Diagnostic, Cryogenic and Laser Systems Vacuum Science Design and deliver large, complex vacuum systems Magnetics& Radiation Sources Magnet design, photonics and FELs Diagnostics an Lasers Diagnostic, Cryogenic and Laser Systems Accelerator Physics Develop and commission accelerators Programmes and Facilities Management 60 Technical Staff
7
John Womersley Oct 2015
8
Free Electron Lasers 2.2GeV NLS Short pulse state of the art FEL Source 600MeV 4GLS High Average Current ALICE
10
VELA Facility Capital Investment Development and testing of novel and compact accelerator technologies. Partnership with industry and the scientific community. Applications in medicine, health, security, energy, industrial processing and science. Potential to revolutionise the cost, compactness and efficiency of such systems. High performance and flexible electron beam injector facility feeding customised state-of-the-art testing enclosures and associated support infrastructure. VELA Approval – August 2011 VELA Civil Work Complete – April 2012 VELA hardware commissioning starts – Sept 2012 First electrons from photoinjector – April 2013 £2.5 M BIS Capital
11
Module 2 installDogleg install in CLARAModule 1 & 2 offline ETC October 2015December 2015... Phase 1 Install and commission by June 2016
12
FEL Activities
13
FEL R&D Goals “The accelerator and FEL community has generated a number of FEL R&D goals” –Gun development –RF Issues –Electron Beam Transport Simulation and Optimization –FEL Output Simulation and Optimization –Electron & Photon Diagnostics –Synchronisation ASTeC is contributing in all areas and is nationally leading in most areas through CLARA and other FEL activities 70% of ASTeC staff effort is directed to FEL research and electron beam test facility operation and development
14
CLARA High Repetition Rate Gun RF analysis ASTeC RF Group CFD modelling PME Group HRRG clamped RF testing at RI Delivery to DL early February.
15
Photocathode R&D Facility Glove Box Surface Science Facility
16
Vacuum Metrology Outgassing Characterisation
17
CVD Deposition PVD Magnetron Sputtering
18
SRF Structure Vertical Test Stretched Wire Characterisation Perturbation Measurement
19
Magnetic Measurement Extremely accurate field measurements over large volume utilising several techniques Very flexible laboratory space
20
Engineering Technology Centre Technology Implementation
21
Accelerator Module Power Supply, Control & Instrumentation Racks Extreme Light Infrastructure Nuclear Physics ELI-NP
22
http://staff.stfc.ac.uk/prog/news/Pages/ASTeC-20150909.aspx UK Government £165m in-kind contribution to ESS ESS Accelerator Sub Project involvement; –Testing High Beta Superconducting cavities £30M –Vacuum Test Facilities £1M –Beam Transport Modules £10.5M –RF distribution Vacuum test facilities delivered in July 2015
23
A FEL Timeline Operate and upgrade facility UK FEL facility opens Build facility Specify UK FEL facility Develop community Define facility specification Timeline for Construction of a UK XFEL Facility 5 years 11 years20 years Technology R&D
24
Goals for FEL related R&D Support an UK XFEL Collaborative Programme Aimed at Delivering World-class FEL Science within the Next Decade –UK-XFEL Facility Specification –Critical FEL R&D Challenges CLARA FEL test facility –UK XFEL Design, Prototyping and Delivery World- class Facility UK “FEL” Science Community National Labs Accelerator Institutes/Uni Industry
25
Summary STFC has the core capabilities to develop large scale science facilities ASTeC has been specifically developing FEL capabilities as a priority for over 10 years –Test facilities –Underpinning R&D –Skills Nationally we have the capabilities to deliver world-leading FEL science….within 12 years