GOVERNMENT OF BALOCHISTAN BRIEF ON PUBLIC HEALTH ENGINEERING DEPARTMENT DEPARTMENT.

Similar presentations


Presentation on theme: "GOVERNMENT OF BALOCHISTAN BRIEF ON PUBLIC HEALTH ENGINEERING DEPARTMENT DEPARTMENT."— Presentation transcript:

1

2 GOVERNMENT OF BALOCHISTAN BRIEF ON PUBLIC HEALTH ENGINEERING DEPARTMENT DEPARTMENT

3 Public Health Engineering Department  THE PHE DEPARTMENT WAS CARVED OUT OF IRRIGATION AND POWER DEPARTMENT IN JULY 1987 WITH THE OBJECTIVE TO FACILITATE THE URBAN & RURAL POPULATION OF THE PROVINCE WITH THE POTABLE WATER EXCEPT QUETTA CITY, WHICH IS MANAGED BY B-WASA.   W E ENVISION TO SEE H EALTHY, C LEAN AND D ISEASE FREE B ALOCHISTAN THROUGH SUSTAINABLE SUPPLY OF CLEAN DRINKING WATER AND AWARENESS FOR C ONSERVATION OF D RINKING W ATER THROUGH C OMMUNITY PARTICIPATION WITH EFFECTIVE IDENTIFICATION, PLANNING, DESIGN AND IMPLEMENTATION WITH OPERATION AND MAINTENANCE OF W ATER S UPPLY S CHEMES.  O VER GOAL IS TO ACHIEVE THE MDG TARGET OF ENSURING ACCESS TO SAFE DRINKING WATER TO ALL THE MASSES BY THE YEAR 2025 IN AN EFFICIENT AND SUSTAINABLE MANNER.

4 Functions  I DENTIFICATION, PLANNING, CONSTRUCTION AND MAINTENANCE OF DRINKING WATER SUPPLY SCHEMES.  M ANAGEMENT OF POTABLE DRINKING WATER IN ACCORDANCE WITH DRINKING WATER QUALITY STANDARDS  A CCESS TO SAFE DRINKING WATER THROUGH FILTRATION / TREATMENT PLANTS  P ROTECTION OF WATER SOURCES FROM CONTAMINATION BY CONTINUOUS WATER TREATMENT, STREAM POLLUTION CONTROL ETC.  L EVYING & C OLLECTION REVENUE  S ERVICE MATTERS OF EMPLOYEES OF PHED AND ORGANIZATIONS UNDER ITS ADMINISTRATIVE CONTROL.

5 Organogram Public Health Engineering Department Organogram Public Health Engineering Department

6 Status of Water Supply Schemes Total Number and Nature of Water Supply Schemes Total No. 3126 Nature of schemes A- on the basis of source i- Tube well 2475 ii- Surface water 268 iii- Springs 383 B- on the basis of power source i- Electricity 1900 ii- Diesel 813 iii-Gravity 383 iv-Solar System 30 Run by Department 1013 (Functional 876, Non Functional 137) Run by Community 2113 (Functional 1610, Non Functional 503)

7 Reasons for Non functioning of Water Supply Schemes  Perpetual depletion of underground water table.  Climate change leading to much reduced rains and snow falls.  High/un affordable energy charges.  Poverty contributing to non payment of huge electricity bills of schemes by communities.  Insufficient funding for rehabilitation of abandoned water supply schemes.  Inadequate/unsustainable billing and collection system resulting in low revenue generation.  Lack of political will/motivation for ownership of water supply schemes.  Tribal disputes and rivalry.  Lack of well design polices and its poor Enforcement.  Insufficient legislation.  Lack of awareness regarding limited use of water.

8 ACHIEVEMENTS ACHIEVEMENTS The number of Water Supply Schemes from 285 at the time of creation of PHE, department in 1987, has increased to 3126 till June 2014 by successful implementation of development programmes i.e PSDP, SAP-I,SAP-II, Drought Programme and Chief Minister and Governor’s Special Fund. Despite occurrence of natural disasters particularly repeated and prolong drought facilitating 69% population of the Province with potable Drinking Water. Hope fully 100% population shall have access to potable Drinking Water before 2025. Running and Maintenance of more than 1000 water supply schemes located in far flung areas of the Province through lengthy pipe network laid inter and intra districts.

9 ACHIEVEMENTS ACHIEVEMENTS Maintaining supply of potable water during natural disasters thus discarding prevalence of water borne diseases. Solving chronic issue of potable water for the inhabitants of Sui town, which ultimately would become more sustainable after its linking with pat feeder canal. Managing supply of potable water to strategically important town of Gawadar through Akra Kaur Dam and alternate sources like Sunstar well field, Karawat desalination plant and further linking it with Sawar dam situated at a distance of 70 Km from Gawadar. Keeping in view the depleting ground water resource the PHED with its timely pursuance and follow up has succeeded in reflection of schemes pertaining to construction of small dams in PSDP 2014-15.

10 Mega Projects Completed Name of ProjectYear of Completion Completion cost Remarks Provision of water to Gawader Town ( from Akra Kaur Dam ) 1996560.00This dam was constructed in 1996 and is serving as the main source of potable drinking water for the population of Gawader and surrounding villages. Water Supply Scheme Nokundi District Chaghi 200276.30The source of water is situated at Bootak 67 KM from Nukundi. Kachhi Plain Phase-I2010280.00In this project water from Pat Feeder Canal is supplied through 73 K.M Pipeline to Bakhtiar Abad & Bhag.

11 Mega Projects Completed Name of ProjectYear of Comple tion Completion cost Remarks Water Supply Scheme for Kharan Town based on Bunap River 2014118.00The source of water is at 20 K.m from Kharan Town and water will be supplied through gravity flow. Clean Drinking Water for All Project2014803.00 and 120.00 by Federal & Provincial Govt respectively Under this Project 423 water filtration/reverse Osmosis have been installed in various union councils of the Province. The project has been capped after the promulgation of 18 th amendment

12 Major On-going Projects Major On-going Projects

13 Major Projects (Ongoing) Name of ProjectProgrammeCost in (M) Talking Points Water Supply Scheme for Sui TownProvincial PSDP & PPL 457.830The Sui Town WSS is being implemented jointly by GOB & PPL with share of 75% & 25 % respectively (GOB share = Rs.347.890 & PPL share Rs.109.940 ). Work on this project is in progress With Physical Progress 65% & Financial 63% Kachhi Plain Water Supply Project (Phase-II). Provincial PSDP 1700.00The work on Phase-I of project completed during 2010. Where as In Phase -II supply of water to Bhag, Tangoti, Chalgari, in the North west; Chatter, Haji Shaher, Noshero and other villages in the North and Lehri town in the North East in Nasirabad and Kachhi districts has been proposed with a cost of Rs.1700.00 million which has been reflected in PSDP 2014-15. Water Filtration Plants in Gawader and Lasbela Districts Provincial PSDP 100.00Gwadar & Lasbela Districts are deficient with the sweet water. The main town is being supplied through surface water/Dam whereas the small dwellings are deprived with the sweet water. Hence a project of water filtration plants has been reflected in PSDP 2013-14 under which 12 reverse Osmoses plants will be installed, 7 in Gwadar & 5 in Lasbela. Construction of 30 gravity flow water supply schemes (Lasbela, Awranr, Pishin, K-Saifullah, Panjgur, K-Abdullah, Kalat, Kech, Ziarat, Dera Bugti, Chagai, Zhob and Khuzdar) --do--90.00Since the underground water in the province is depleting very fast, therefore the surface water in shape of spring/Karez where available is need to be tapped in order to facilitate the rural population. Hence the scheme has been reflected in PSDP 2014-15. Construction of 10 small Dams water supply schemes (Quetta, Noushki, Loralai, K-Saifullah, Lasbela, Kalat Panjgur and Musakhail) --do--500.00Alternate sources of water needs to be explored due to rapid depletion of under ground water in the Province. Thus construction of small storage dams is inevitable and reflected in PSDP 2014-15 at a cost of Rs.500.00 (M).

14 Major Projects (Ongoing) Name of ProjectProgrammeCost in (M)Talking Points Augmentation of 10 Township water supply schemes (K-Saifullah, Loralai, Sibi, Ziarat, Noushki, Pishin, Lasbela, Kalat, Panjgur and Kech) Provincial PSDP 100.00Infrastructure of Township water supply schemes specially pipes network being maintained by the department have become very old and needs to be augmented in order to avoid spread of water related diseases. Completion of 90 Incomplete water supply schemes Provincial PSDP 116.122After promulgation of 18 th amendment federally funded WSS had been transferred to the Province, but due to lack of funds the leftover components could not be completed on these schemes. Therefore the Provincial Cabinet has approved to complete these WSS from Provincial PSDP in order to provide the basic amenity of life to the people. Purchase of drilling bits and allied equipments --do--58.174The existing fleet of rigs has become 25 to 30 years old and does not fulfil the requirement if drilling tubewells upto depth of more than 1000 ft. In order to enhance the drilling capacity, the allied equipment and drilling bits have been reflected in the PSDP 2014- 15. Replacement of 100 outlived pumping machineries of various WSS --do--76.668Electric & diesel driven pumps have been installed on majority of WSS which have completed their lives and lost their efficiency due to repeated repair and needs to be replaced by new pumping machinery.

15 Major Projects (Ongoing) Name of ProjectProgrammeCost in (M) Talking Points Restoration of flood damages of Akra Kaur Dam). Federal PSDP 460.00The Akra Kaur Dam received severe damages during floods in 2005 & 2007 and the capacity of Dam diminished due to silt deposition. A PC-I of Rs.415.00 million approved under Federal PSDP out of which only Rs.211.000 million has been released whereas the balance funds of Rs.204.000 million have yet to be released. The Storage capacity of Akra Kaur Dam has been reduced due to scarcity of rains & sitting up. The Dam received severe damages during floods in 2005 & 2007 and the capacity of Dam diminished due to silt deposition. A PC-I of Rs.415.00 million approved under Federal PSDP out of which only Rs.211.000 million has been released whereas the balance funds of Rs.204.000 million have yet to be released. Provision of Drinking Water to Fishermen Community Gwadar PIDSA & Prov: PSDP 478.00This project is being executed under the joint venture of GOB & Italian Govt: under Italian Debt Swap Agreement in three phases. The project aimed to development a sustainable fishing sector in Balochistan. Almost 35,000 Souls f Fishermen Community living along with coastline in 28 villages will be benefited with the facility of safe drinking water from this project.

16 Provincial PSDP Allocation to PHED During the Last Five Years Year Allocation for PHED (Rs. In million) Total PSDP (Rs. In million) PSPD Share in % 2010-111353.11422052.8505.14% 2011-121554.87829127.343 5.34% 2012-132266.70733473.965 6.77% 2013-142364.47334780.067 6.80% 2014-154573.25050741.681 9.01%

17 Status of Non Development Funds During Last Five Years (Rs. In Million) Period No. of schemes Funds Released Remarks 2009-102123 744.57 The over all increase in release of funds for operation and maintenance of water supply schemes is more or less than 10% for the last five years as compared to the increase in prices of commodities particularly per litter POL price which has increased from Rs. 65.3 in the year 2010 to Rs. 109.69 in the year which is almost 60% and the electricity charges from Rs. 6.37 per unit in 2008 to Rs. 13.00 per unit in 2014 which is almost 100%. 2010-112453 650.122 2011-122646 721.000 2012-132731 754.000 2013-143126 812.800

18 Water Tariff structure Water Connection Fee (Domestic)Rs. 1000/-½ inch Rs. 1500/-¾ inch Rs. 20001 inch Water Connection Fee (Commercial)Rs. 2000/-½ inch Rs. 2500/-¾ inch Rs. 3500/-1 inch Rs. 50001 1/2 inch Monthly Tax DomesticRs. 75/-½ inch CommercialRs. 700/-½ inch Public BathRs. 700/-½ inch Service StationRs. 2500/-½ inch Ice FactoryRs. 2500/-½ inch Note:- Since the rate of Water tariff were notified in the year 2010, which needs to be revised due to enhancement of cost of maintenance. The proposed tariff is Rs.125/- for domestic connection and Rs.1000/- for commercial and Rs.3000/- for Service Station and Ice Factories.

19 Revenue Receipt During Last Five Years Financial YearTargetActual Collection 2009-1025.00 Million33.345 Million 2010-1127.00 Million31.00 Million 2011- 1228.00 Million32.632 Million 2012-1330.00 Million18.257 Million 2013-1435.00 Million33.638 Million

20 Districts Effected 12 Districts (Dera Bugti, Khuzdar, Loralai, Killa Saifullah, Sibi, Kachhi, Harnai, Jhal Magsi, Jafferabad, Nasirabad, Kalat and Sherani Effected Population 0.450 Million Souls Effected WSS 171 Nos. Effected Filtration Plants 36 Nos. Agecies/Organizations worked jointly with PHED UNICEF, Provincial & federal Line Departments. Restoration measures by PHED 100 Schemes & 36 plants were restored on temporary basis, whereas 71 schemes need major repair. PC-I amounting to Rs.411.00 million stand approved. Funds required for permanent restoration and clearance of liabilities. Financial implication Total Cost Required for restoration Rs.411.00 Million Response to Disaster (Flood -2012) Note:- The efforts of PHED regarding response to the effected people with regard to supply of safe drinking water & restoration of water supply schemes was appreciated on Higher forums and the amount of liabilities had been discussed with the Chief Minister, Provincial Cabinet, P&D and Finance Departments but unfortunately required funds have not yet been provided.

21 Districts Effected Awaran and Kech Districts Effected Population 100,000 souls Effected WSS 24 Nos (14 in Awaran and 10 in Kech) WSS Temporarily Restored after earthquake 22 Nos (12 in Awaran and 10 in Kech) Agencies/Organizations worked jointly with PHED UNICEF, Provincial & Federal Line Departments. Restoration measures by PHED 12 No schemes were restored temporarily and two schemes namely Nokjo and Jabree could not be restored due to Dispute amongst the communities. However, in Kech all schemes were temporarily restored and requires permanent restoration. Installation/operation of two filtration plants provided by NDMA at Civil Hospital and Circuit House Awaran. Supply of 210 water storage tanks.(200 & 300 Gallons capacity) Financial implication Total Cost Required for restoration Rs. 170.00 Million Response to Disaster (Earth quake -2013 in Awaran and Kech) Response to Disaster (Earth quake -2013 in Awaran and Kech) Note:- PHED was the pioneer to reach very timely to the effected areas. The Secretary PHED rushed to Awaran within 24 hours, whereas the Chief Engineer (S) and S.E (Kalat ) camped at site for more than one month to look after the relief activities. Beside the XEN Awaran has carried out damage assessment in Mashkey & Gujar area despite poor security situation. Whereas, the F.C personell were just taking picture through Google Earth.

22 ISSUES Non /Irregular functioning of community based water supply schemes due to non payment of electricity and POL bills. Insufficient /Inadequate release of funds for operation and maintenance of filtration plants Short Funding of Non development budget against departmental run water supply scheme Allocation of funds for supply of water from K-3 Project Hub towns. The K-3 project was launched by Karachi Water & Swerage Board for100 MGD water from Kinjhar lake. The share of Balochistan was 5MGD (3 MGDs for Industrial and 2 MGD for drinking/domestic use). 35 Km pipeline has been laid for the purpose but was not operated due to high cost of per 1000 Gln of water (currently Rs.109/-). Non Availability of office/residential accommodation, vehicles and lodging/boarding facilities.

23 Major Initiatives Required for up gradation of WSS and Strengthening of PHED S.NoDescription Estimated Cost ( Pak Rs.) 1.Augmentation of 15 township water supply schemes Loralai, Hub, Uthal, Bela, Gaddani, Dalbandin, Nushki, Turbat, Kalat, Khuzdar, Pishin, Panjgur, Dera Murad Jamali, Ziarat, Sibi and Sherani. 300.00 Million 2.Completion of Incomplete water supply schemes. 95.511 Million 3.Rehabilitation of water supply schemes (640) Nos. 2731.00 Million 4.Strengthening of Saji Dam water supply project. 300.00 Million 5.Sewerage system for 10 district headquarters i.e Killa Saifullah, Sibi, Khuzdar, Makran, Panjgur, Mastung, Killa Abdullah, Pishin, Kalat and Zhob (@ Rs.300.00 million) 3000.00 Million 6.Purchase of Vehicles 4x4 Toyota pick up double cabin. 5 for Superintending Engineers (SE) 10 for Executive Engineers (XEN). SUZUKI Gimminy jeeps 4x4 for Sub Divisional Officers (SDO). 5 Nos. Single Cabin Pickup 84.00 Million 7.Construction of office / residential accommodation 200.00 Million 8.Capacity building / awareness programme 100.00 Million Total = 6810.511 Million

24 The Way Forward  Enhancement of present coverage of drinking water to achieve the targets set under MDG’s  Drinking water strategy and Action Plan will be submitted to the Cabinet for approval after being reviewed by the Govt: & UNICEF  A comprehensive PC-1 will be prepared for water Program based on MDGs Targets and will be shared with the Federal Government and potential donors.  The provincial government has to explore all possible avenues for seeking funding for implementation of the policies and achieving the targets.  Strengthening of PHED has to be undertaken through capacity building of field staff, providing of office residential accommodation, vehicles and lodging/boarding facilities. Further exploring alternate options for energization of water supply schemes through Solar and winds due to high cost and unscheduled load sheding of electricity.  To ensure further sustainability and to supplement the supply of water renewable energy sources i.e solar and wind mill have to be adopted.

25 Thanks


Download ppt "GOVERNMENT OF BALOCHISTAN BRIEF ON PUBLIC HEALTH ENGINEERING DEPARTMENT DEPARTMENT."