Presentation is loading. Please wait.

Presentation is loading. Please wait.

About Morgan Sindall Morgan Sindall is a leading UK construction and regeneration group operating through five divisions of construction and infrastructure,

Similar presentations


Presentation on theme: "About Morgan Sindall Morgan Sindall is a leading UK construction and regeneration group operating through five divisions of construction and infrastructure,"— Presentation transcript:

1 About Morgan Sindall Morgan Sindall is a leading UK construction and regeneration group operating through five divisions of construction and infrastructure, affordable housing, fit out, urban regeneration and investments. London Office: Invicta House 108-114 Golden Lane London EC1Y 0TG T 0207 549 3260 F 0207 549 3261 www.morgansindall.com morgansindall.com Moreland Primary School & Children’s Centre- Newsletter November 2015 Look ahead to December During December we will be continuing our foundation works and will commence pouring our ground floor slab before building upward to form the frame of the school. Contact us MORGAN SINDALL- Site Office Moreland School, Moreland Street, EC1V 8BB Project Manager James Kidgell- 07976 429312 James.kidgell@morgqansindall.com Contracts Manager Mark Thomas – 07773 199455 Mark.thomas2@morgansindall.com Working With Progress to date We have demolished the a small section of the school building, treated the weak soil and placed piled foundations into the ground. What are we doing this month? Our main activity will be digging up areas of the project around our piled foundations and connecting them together with concrete to create a fully joined foundation system (see picture right). We will also install the underground drainage for the school. November will bring lots of logistical changes to the project that may affect you, our neighbours. UK Power Networks will be installing a new underground power supply for the school during November. This means the area of the King Square Estate Car Park near the school and fronting Moreland Children’s Centre will have to be dug up. On the 14 th -15 th November we will be installing a tower crane to help us build quicker and safer. As a result Moreland Street will be closed over the weekend to facilitate this. Finally on the 23 rd and 24 th we will be moving our site cabins into a small area of the King Square Estate car park to allow us enough room to suitably accommodate our workers. On these two days there will be vehicles delivering the cabins from within the estate car park. It will take us two weeks to fully complete works to the cabins but no deliveries will occur after the 24 th. A new fence will be placed between our cabins and the car park to ensure we do not impede further on the carpark once we have moved in. Our workers and deliveries will continue to enter via Gard Street so further disruption should be minimal. At all times during these aforementioned works access into the estate will be maintained from Central Street We aim to keep any disruption caused by the works to an absolute minimum, however if you have any questions or concerns about the project and our changes during November please do not hesitate to contact us on the details given to the right. Above: Pile foundations being prepared for concrete connections What is the project? The proposed project is the construction of a new school building to replace the existing facilities at Moreland Primary School including new facilities for Moreland Children’s Centre. The new School building will be capable of holding 2 forms of entry. The completed building will provide a better learning environment for the pupils in a more environmentally friendly building.

2 About Morgan Sindall Morgan Sindall is a leading UK construction and regeneration group operating through five divisions of construction and infrastructure, affordable housing, fit out, urban regeneration and investments. London Office: Invicta House 108-114 Golden Lane London EC1Y 0TG T 0207 549 3260 F 0207 549 3261 www.morgansindall.com morgansindall.com Our Partners Client: London Borough Islington Employers Agent: Baily Garner Quantity Surveyor: Baily Garner Architect: Haverstock Structural Engineer: Conisbee Services Engineer: Elementa Considerate Constructors We strive to ensure that we will minimise our impacts on our neighbours. As part of this approach the site has been registered with the national Considerate Constructors Scheme. The CCS organisation will audit the site regularly to ensure that we are achieving the required standards. Health and Safety Creating a safe environment is our first priority for everyone who works with us and those impacted by our projects. If you ever have concerns over activities associated with the site please contact our site office using the contact details provided here. Environment and the Community We believe that a responsible approach to sustainable development is fundamental to both our current and future success. As part of this we are committed to using local labour and suppliers wherever possible and to engage with local charities where we can assist. Thank you for your cooperation. If you have any queries do not hesitate to contact James Kidgell at Morgan Sindall.


Download ppt "About Morgan Sindall Morgan Sindall is a leading UK construction and regeneration group operating through five divisions of construction and infrastructure,"

Similar presentations


Ads by Google