Presentation is loading. Please wait.

Presentation is loading. Please wait.

Thomas Suritsch | Lufthansa meets Austria(n) | June 08. – 09. 2010| 1 www.austrian.com.

Similar presentations


Presentation on theme: "Thomas Suritsch | Lufthansa meets Austria(n) | June 08. – 09. 2010| 1 www.austrian.com."— Presentation transcript:

1 Thomas Suritsch | Lufthansa meets Austria(n) | June 08. – 09. 2010| 1 www.austrian.com

2 Thomas Suritsch | Lufthansa meets Austria(n) | June 08. – 09. 2010| 2 www.austrian.com Meeting goals Draw attention to the OS/LH joint station concept Introducing Austrian core functions and challenges Get to know each other – meet and greet your colleagues Learn from each other - exchange of perspectives

3 Thomas Suritsch | Lufthansa meets Austria(n) | June 08. – 09. 2010| 3 www.austrian.com 13.00 – 13.30Welcome & Presentation OGOG / T. Suritsch 13.30 – 14.00Presentation “Flight Operations OS/Hub Operations VIE”DQC/ A. Gsteu 14.00 – 14.30Network & Revenue Management – Q & ACN / E. D’Souza 14.30 – 15.00Coffee Break 15.00 - 15.30Customer Services & Product Management CP/ P. Baumgartner 15.30 – 17.10 Kiosks – “Get to know Austrian” all 18.05Departure to Vienna City Center / CAT 18.40Departure of trams – City Tour 20.00Dinner at Heuriger Agenda 08.06.10

4 Thomas Suritsch | Lufthansa meets Austria(n) | June 08. – 09. 2010| 4 www.austrian.com Agenda 09.06.10 09.00 - 10.00Austrian Next Generation - Q & ADD-M/ P. Malanik 10.15 - 10.45Tyrolean AirwaysVO-DD/ C. Fitz 10.45 - 11.15Coffee Break 11.15 - 11.30Vienna Airport FWAG / C. Lukow 11.30 – 12.00LH/OS Stations – Joint Road Ahead – Q&ALH / K. Benz 12.00 - 12.15Volcanic Ash CrisisDQC / A. Gsteu 12.15 - 12.40Panel Discussion Management of volcanic ash crisis and possible improvements OG / T. Suritsch 12.40 – 12.50Closing RemarksOG / T. Suritsch 13.00 - 14.00Lunch at NH Hotel

5 Thomas Suritsch | Lufthansa meets Austria(n) | June 08. – 09. 2010| 5 www.austrian.com Team OG 6 FTE Procedures 6 FTE Systems 1 FTE Deputy 2 FTE Deputies 3 FTE Deicing team 7 Stations 7 KK + 630 FTEs 1,6 Mio Pax dep. 2,7 Mio Pax Transit 66 Stations 5 KK + 61 ST 138 FTEs 3,4 Mio Pax dep. 27 Stations 25 KK +1 ST 174 FTEs 0,8 Mio Pax dep. Pax data 2009 on OS ops and OS hardblock

6 Thomas Suritsch | Lufthansa meets Austria(n) | June 08. – 09. 2010| 6 www.austrian.com Specific Conditions of Austrian Ground Operations

7 Thomas Suritsch | Lufthansa meets Austria(n) | June 08. – 09. 2010| 7 www.austrian.com Slim organizational structure

8 Thomas Suritsch | Lufthansa meets Austria(n) | June 08. – 09. 2010| 8 www.austrian.com Process orientation environment in the past –little purchasing power –high passenger expectation and threat in case of non-fulfilment –limited motivation / reliability of handling agents in CEE solution –„see red“: additional OS-Staff to partially duplicate HA functions result –increased cost for compensating HA errors and customer dissatisfaction –out of market cost for „double safety“ current environment –leverage via Lead-Buyer –re-evaluation of pax expectation –powerful SLA and cost/risk balance solution –„feel red“: manage and motivate HA (added value) –use group-synergies result –triple cost saving: from „see“ to „feel“ Verbundstationen HA efficiency –improved customer satisfaction through „smooth“ processes

9 Thomas Suritsch | Lufthansa meets Austria(n) | June 08. – 09. 2010| 9 www.austrian.com Fleet Diversity

10 Thomas Suritsch | Lufthansa meets Austria(n) | June 08. – 09. 2010| 10 www.austrian.com Joining our efforts & strength …

11 Thomas Suritsch | Lufthansa meets Austria(n) | June 08. – 09. 2010| 11 www.austrian.com Integration Status OS Stations worldwide: 92 OS only 21 Verbund 71 Historic Verbund 12 still eligible 59 cutover done 45 working on 14

12 Thomas Suritsch | Lufthansa meets Austria(n) | June 08. – 09. 2010| 12 www.austrian.com Status Integration Europe OS only OS // LH OS lead LH lead 50/50 under constr.

13 Thomas Suritsch | Lufthansa meets Austria(n) | June 08. – 09. 2010| 13 www.austrian.com Status Integration ME & Interkont

14 Thomas Suritsch | Lufthansa meets Austria(n) | June 08. – 09. 2010| 14 www.austrian.com Status Integration Europe OS only OS // LH OS lead LH lead 50/50 under constr. OS only: Montenegro - TGD (Podgorica) Macedonia - SKP (Skopje) Slovakia - KSC (Kosice) Kosovo – PRN (Pristina) Armenia - EVN (Yerevan) Bulgaria - VAR (Varna); SOF LH-lead

15 Thomas Suritsch | Lufthansa meets Austria(n) | June 08. – 09. 2010| 15 www.austrian.com Status Integration Europe OS only OS // LH OS lead LH lead 50/50 under constr. OS // LH: France - CDG only!(Paris); NCE + LYS see LH lead Greece - ATH, SKG (Athens, Thessaloniki)

16 Thomas Suritsch | Lufthansa meets Austria(n) | June 08. – 09. 2010| 16 www.austrian.com Status Integration Europe OS only OS // LH OS lead LH lead 50/50 under constr. OS lead: Czech Republic - PRG (Prague) Austria - VIE, SZG, INN, GRZ, KLU Croatia - ZAG, SPU, DBV (Zagreb, Split, Dubrovnik) Bosnia/Herzegovina - SJJ (Sarajevo) Serbia - BEG (Belgrade) Albania - TIA (Tirana) Romania - OTP, SBZ, IAS, TSR (Bucarest, Sibiu, Iasi, Timisoara) Moldavia - KIV (Chisinau) Russia - ROV, KKR, AER (Rostov, Krasnodar, Sotchi) Belarus – MSQ (Minsk)

17 Thomas Suritsch | Lufthansa meets Austria(n) | June 08. – 09. 2010| 17 www.austrian.com Status Integration Europe OS only OS // LH OS lead LH lead 50/50 under constr. LH lead: Spain - BCN (Barcelona) Great Britain - LHR (London) France - NCE, LYS (Nice, Lyon) Belgium - BRU (Brussels) Netherlands - AMS (Amsterdam) Germany - FRA, DUS, MUC, LEJ, DRS, STR, TXL, HAM, CGN Italy - BLQ, FLR, FCO, VCE, MXP, LIN (Bologna, Florence, Rome, Venice, Malpensa, Linate) Denmark - CPH (Copenhagen) Norway - OSL (Oslo) Sweden - ARN, GOT (Stockholm, Goteborg) Finland - HEL (Helsinki) Hungary - BUD (Budapest) Lithuania - VNO (Vilnius) Georgia - TBS (Tbilisi) Russia - DME, LED (Moscow, St. Petersburg) Poland – WAW, KRK (Warsaw, Krakow) LH lead under construction: Azerbaijan - GYD (Baku)

18 Thomas Suritsch | Lufthansa meets Austria(n) | June 08. – 09. 2010| 18 www.austrian.com Status Integration Europe OS only OS // LH OS lead LH lead 50/50 under constr. Ukraine DOK, LWO (Donetsk, Lviv)50/50 DOK, LWO (Donetsk, Lviv)50/50 KBP (Kyiv)under construction KBP (Kyiv)under construction DNK/OZH, HRK (Dnepropetrovsk/ Zaporozhye, Kharkov)OS only DNK/OZH, HRK (Dnepropetrovsk/ Zaporozhye, Kharkov)OS only

19 Thomas Suritsch | Lufthansa meets Austria(n) | June 08. – 09. 2010| 19 www.austrian.com Status Integration ME & Interkont OS only: Syria –DAM (Damascus)

20 Thomas Suritsch | Lufthansa meets Austria(n) | June 08. – 09. 2010| 20 www.austrian.com Status Integration ME & Interkont OS // LH: Cyprus - LCA (Larnaca) Jordan - AMM (Amman) Egypt - CAI (Cairo) India - DEL, BOM (Delhi, Mumbai) China - PEK (Beijing)

21 Thomas Suritsch | Lufthansa meets Austria(n) | June 08. – 09. 2010| 21 www.austrian.com Status Integration ME & Interkont OS lead: Iraq - EBL (Erbil)

22 Thomas Suritsch | Lufthansa meets Austria(n) | June 08. – 09. 2010| 22 www.austrian.com Status Integration ME & Interkont LH lead: Iran - IKA (Teheran) Israel - TLV (Tel Aviv) Lybia - TIP (Tripolis) Thailand - BKK (Bangkok) USA – JFK, IAD (New York, Washington) Canada – YYZ (Toronto) LH lead under construction: Japan - NRT (Tokyo) Turkey - IST (Istanbul)

23 Thomas Suritsch | Lufthansa meets Austria(n) | June 08. – 09. 2010| 23 www.austrian.com OG goals & objectives

24 Thomas Suritsch | Lufthansa meets Austria(n) | June 08. – 09. 2010| 24 www.austrian.com Satisfied Customer

25 Thomas Suritsch | Lufthansa meets Austria(n) | June 08. – 09. 2010| 25 www.austrian.com Projects & Innovations Web Upgrade

26 Thomas Suritsch | Lufthansa meets Austria(n) | June 08. – 09. 2010| 26 www.austrian.com Projects & Innovations Station VIE „New“

27 Thomas Suritsch | Lufthansa meets Austria(n) | June 08. – 09. 2010| 27 www.austrian.com Projects & Innovations Austrian Next Generation

28 Thomas Suritsch | Lufthansa meets Austria(n) | June 08. – 09. 2010| 28 www.austrian.com Personal goals 1.Stable organizational structure of OG: –Preserving flexibility wherever necessary –Focus quality –Focus costumer satisfaction 2.Cost reduction 3.Reorganization station VIE „new“ in progress 4.Promote automation projects www.austrian.com

29 Thomas Suritsch | Lufthansa meets Austria(n) | June 08. – 09. 2010| 29 www.austrian.com


Download ppt "Thomas Suritsch | Lufthansa meets Austria(n) | June 08. – 09. 2010| 1 www.austrian.com."

Similar presentations


Ads by Google