Download presentation
Presentation is loading. Please wait.
Published byGriselda Nicholson Modified over 8 years ago
1
Group A Guillermo Ovies Rodolfo Morales Carlos Rodriguez Miguel Molina Erick Faudoa
2
Between England and France The purpose was to create a safe permanent link between England and Europe
4
11 TBM were used CHARACTERISTICS Work 100m below the sea 250 m long Wt of 50000 tons CUTTING HEAD 50 ft in diameter Made out of tungsten
6
Technological The machine that was need it, was not invented yet Technical The size of the tunnel, the type of trucks that the train will carry, etc. Social England wanted to remain as an island nation English and France historically rivals, needed to work together (no cultural misunderstandings allowed) Environmental Environmental repercussions (excavations)
7
New service created for the Eurotunnel Will carry passengers and their cars Seven thousand six hundred horse power
9
Earthquakes Terrorist attacks Inside tunnel-fire prevention Creation of giant doors Made out of Carbon-Manganese steel Weight = 100 tons each
10
13000 workers needed 6 years 500,000 Concrete slabs 21 Billion cost
11
December 199o
12
Official opening by Queen Elizabeth II and French President François Mitterand
13
The Eurotunnel is one of the greatest engineering achievements of the 20th century
14
QUESTIONS?
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.