Recent Status and Future Plans at KEK Computing Research Center Nov. 28 th, 2007 at the 3rd CC-IN2P3 - CRC-KEK Meeting KEK Computing Research Center Setsuya.

Similar presentations


Presentation on theme: "Recent Status and Future Plans at KEK Computing Research Center Nov. 28 th, 2007 at the 3rd CC-IN2P3 - CRC-KEK Meeting KEK Computing Research Center Setsuya."— Presentation transcript:

1 Recent Status and Future Plans at KEK Computing Research Center Nov. 28 th, 2007 at the 3rd CC-IN2P3 - CRC-KEK Meeting KEK Computing Research Center Setsuya Kawabata

2 1.Main Projects at KEK 1.Tsukuba campus 2.J-PARC (Tokai campus) 2.Computer Facility at KEK 1.Central Information System 2.B Factory Computer System 3.LCG Deployment Plans 4.Super Computer System 3.Future Plans at KEK 1.Research Projects 2.Computing Facilities Outline The 3rd CC.IN2P3-CRC.KEK Meeting2 Current Status and Future Plans at CRC.KEK

3 The 3rd CC.IN2P3-CRC.KEK Meeting Current Status and Future Plans at CRC.KEK 3 Tsukuba Tokai 1. Main Projects at KEK J-PARC B-Factory Photon-Factory LC-Test Facility Narita Airport

4 The 3rd CC.IN2P3-CRC.KEK MeetingCurrent Status and Future Plans at CRC.KEK 4 1.1. KEK (Tsukuba site) e + / e - Linac KEKB Photon Factory: 2.5GeV Photon Factory-AR:6.5GeV Belle Experiment Mt. Tsukuba Computing Research Center

5 The 3rd CC.IN2P3-CRC.KEK Meeting Current Status and Future Plans at CRC.KEK 5 1.1. KEKB e + e - Collider e + source Ares RF cavity SCC RF(HER) ARES (LER) Belle Experiment 13 countries, 57 institutes, ~400 collaborators B 0  J/  K S Observation of CPV in the B meson system Observation of CPV in the B meson system 3.5 GeV e + 8 GeV e -

6 The 3rd CC.IN2P3-CRC.KEK Meeting Current Status and Future Plans at CRC.KEK 6 1.1. B Factory : Belle Experiment Data accumulated so far 1.5 PB ⇒ 2 ~ 3PB in a few years Peak Luminosity 1.7×10 34 cm -2 s -1 Accumulated Luminosity : 710 fb -1 as of the end of Dec., 2006 1fb -1 /day ~ 1TB/day 1fb -1 ~ 10 6 BB イベント in Winter 2007 Crab cavity successfully installed Luminosity ⇒ more than twice Current luminosity is less than the expected. ⇒ An intensive Study is going on. Integrated Luminosity (1/fb) year

7 The 3rd CC.IN2P3-CRC.KEK Meeting Current Status and Future Plans at CRC.KEK 7 J-PARC = Japan Proton Accelerator Research Complex Joint Project between KEK and JAEA 3 GeV Synchrotron (25 Hz, 1MW) Hadron Beam Facility Materials and Life Science Experimental Facility Neutrino to Super- Kamiokande 50 GeV Synchrotron (0.75 MW) Linac (330m ) 1.2. J - PARC ( Tokai )

8 The 3rd CC.IN2P3-CRC.KEK MeetingCurrent Status and Future Plans at CRC.KEK 8 Super Kamiokande Neutrino Experimental Facility Super-Kamiokande 295 km West Kamioka J-PARC 1.2.1. J-PARC (T2K Experiment)

9 The 3rd CC.IN2P3-CRC.KEK Meeting Current Status and Future Plans at CRC.KEK 9 1.2.2. J-PARC( Materials & Life Science Facility) Super High Resolution Powder Diffractometer (SHRPD) - KEK High-intensity SANS (HI-SANS) - JAEA Neutron Reflectometer with Horizontal-Sample Geometry - KEK High-Resolution Chopper Spectrometer (HRC) - KEK Engineering Diffractomete r - JAEA Neutron Resonance Spin Echo spectrometers - KUR, Kyoto University Cold Neutron Double Chopper Spectrometer (CNDCS) - JAEA Versatile powder diffractomete r - JAEA Diffractometer for Biological X’tallography (BIX-PN) - JAEA Proton beam IBARAKI Biological Crystal Diffractometer - Ibaraki Prefecture IBARAKI Materials Design Diffractometer - Ibaraki Prefecture 4d Space Access Neutron Spectrometer(4SEASON S) -Grant-in-Aid for Specially -Promoted Research, MEXT, High-intensity Versatile Neutron Total Diffractometer - KEK Protein Dynamics Analysis Instrument (DIANA) – JAEA ■ Tentatively Approved Instruments

10 Tokai Campus The 3rd CC.IN2P3-CRC.KEK MeetingCurrent Status and Future Plans at CRC.KEK 10 1.2.3 J-PARC Information System J-PARC LAN ( JLAN ) Since Oct. 2002 Operation and maintenance by the collaboration between Computing Centers of KEK and JAEA Independent LAN from KEK and JAEA LANs Independent Security Policy from KEK and JAEA Tsukuba Campus J-PARC LAN Internet KEK LAN JAEA LAN Firewall JAEA’s policy J-PARC’s policy KEK’s policy

11 The 3rd CC.IN2P3-CRC.KEK Meeting Current Status and Future Plans at CRC.KEK 11 2. Computer Facility at KEK

12 The 3rd CC.IN2P3-CRC.KEK Meeting Current Status and Future Plans at CRC.KEK 12 Rental from IBM ( Feb. 2006 ~ Jan. 2009) Central Computing System : KEKcc Work Server, Computing Server Program development, Job submission, etc. IBM eServer 326 (AMD Opteron252 2.6GHz Dual) Computing Server : 76 nodes Red Hat Enterprise Linux Platform LSF HPC Software CERNLIB, Geant4, CLHEP and ROOT Monte Carlo Simulation codes Storage System HPSS : 320TB ■ Disc storage : 45 TB Mail System : KEKmail PostKEK (for Research div.) MailKEK (for administration div.) ML, Anti-SPAM, anti-Virus Web Systems KEK Official system Researchers’ system, Conference system Grid System LHC data Grid : LCG System IBM eServer326: 36 nodes, xSeries 336: 10 nodes Storage Resource Broker : SRB System 2.1. Central Information System HPSS : 320TB Tape Library (High Performance Storage System) Computing Servers GRID System HPSS Data Server/ File Servers

13 2.2. B Factory Computer System The 3rd CC.IN2P3-CRC.KEK MeetingCurrent Status and Future Plans at CRC.KEK 13 3.5PB Tape Library 1PB Disc Storage Rental from NetOne (Mar. 2006 ~ Feb. 2012) Computing Servers DELL Power Edge 1855 (Xeon3.6GHz x2, memory 1GB) 1140 nodes : ~ 4M SKI2k Linux(CentOS/CS) Disc Storage System 1PB, 42 FileServers HSM : 370TB, non HSM : 630TB Tape Library System: Petaserv(SONY) 3.5PB + 60drv + 13srv SAIT 500GB/volume 30MB/s drive Computing Server 1140 nodes (4M SKI2k)

14 The 3rd CC.IN2P3-CRC.KEK MeetingCurrent Status and Future Plans at CRC.KEK 14 2.3. LCG Deployment plan at KEK New Computer Systems Central Information System since Feb. 20. ’06 B Factory Computer System since Mar. 23. ‘06 1 st Phase LCG and SRB for production usage are available on the Grid System in the new Central Information System. Not for public usage, but for supporting projects Under system maintenance in contract with IBM-Japan WN: 36 nodes x 2 =72 CPU Storage: Disk (2TB) + HPSS(~200TB) Supported VO: Belle, APDG, Atlas_J Service started in May 2006 2 nd Phase Full support in the Belle production system Services started in Feb. 2007

15 The 3rd CC.IN2P3-CRC.KEK MeetingCurrent Status and Future Plans at CRC.KEK 15 2.4. Supercomputer System Rental from Hitachi (Mar. 2006 ~ Dec. 2010) Large Scale Simulation For particle and nuclear physics research and accelerator-related scientific studies. Hitachi SR11000 K1 System 16 nodes 2.15 Tflops (Theoretical peak ) Large memory capacity 32GB/64 GB/node IBM BlueGene Solution 10 racks 57.3 Tflops (Theoretical peak) Massive parallel system for Lattice QCD simulation About 50 times faster than former Supercomputer system (Hitachi SR8000 100 node system) HITACH SR11000K1 IBM BlueGene

16 2.5. Power and Cooling at KEK Comp. Research Center Max. power consumption and Cooling capacity for each machine room: Problem: Budget reduction of 1% /year for the computer resource is critical. Legacy air conditioners remain many. Less cooling efficiency, but are too expensive to replace them at a time. Electric power of 2MW consumed by computers etc. has not been crucially discussed at KEK, but will be a big problem soon. The 3rd CC.IN2P3-CRC.KEK Meeting Current Status and Future Plans at CRC.KEK 16 North Building South Building Network System Central Information System Machine Room (482m 2 ) B Factory Storage Storage Room(263m 2 ) Supercomputer System Machine Room I (411m 2 ) Machine Room II (302m 2 ) B Factory Computing Servers The date of manufacture of air conditioners :1985 ~ : 1994 ~ :2003 ~ :1991 ~ : 2000 ~ :2006 ~ PlaceSystem name Power (Max) Cooling (Max) North: Machine Room I B Computing Servers 650kVA612kW North: Machine Room II Super Computer 422kVA760kW South: Machine Room Central Info. System 170kVA363kW South: Storage Room B Factory Storage 100kVA278kW ■ Conceptual view of machine rooms

17 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 Computer System B Factory Nuclear Phys. Central Photon Factory Super Computer Network KEK SecureNet JLAN(J-PARC) Research Projects PS / J-PARC KEKB (KEKB upgrade) LHC/ATLAS The 3rd CC.IN2P3-CRC.KEK Meeting Current Status and Future Plans at CRC.KEK 17 Major Projects of KEK Middle of FY2008 : Materials & Life Science Facility at J-PARC will start the experiments. Beginning of FY2009 : T2K will start the experiment. End of FY2008: B Factory Experiment will be terminated. After 3 or 4 years for the Machine upgrade, a higher luminosity B experiment will start. FY2012? Before 2008 summer : LHC will start the colliding beam experiment. Unified unified 3.1. Future Plans at KEK

18 Computer Systems Jan.2006 : Nuclear Phys. Computer System was unified to the Central Information System Jan.2009 : Central Information System Upgrade Photon Factory Computer System will be unified to this system This system will support the J-PARC project. Feb.2012 : The contracts of following systems will be terminated. B Factory Computer System (Mar.2006 ~ Feb.2012) Next Central Information System (Feb. 2009 ~ Jan. 2012) KEK will become LHC Tier1 Center in the long run. When and How are under debate. Network Systems Jan.2009 : Current Network System will be replaced by a New one. KEK Secure Network System (including maintenance and operation) Network infrastructure Information Security system Fire wall, Intrusion Detection System, Intrusion Prevention System, etc. Jan.2010 : J-PARC Network System will be introduced. 3.2. Future Plans at Computing Research Center The 3rd CC.IN2P3-CRC.KEK Meeting18 Current Status and Future Plans at CRC.KEK